Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹7.9 LAccepted-Finance | ₹7.9 L | L1 | Accepted-Finance L1 |
| 2 | L2₹8.0 LAccepted-Finance CONTRACTOR VILLUPURAM | VILLUPURAM | TAMIL NADU | 604001 | ₹8.0 L | L2 | Accepted-Finance L2 |
| Sl No | Description | Qty | Unit | Prabakaradevan L1 | S Prasath L2 |
|---|---|---|---|---|---|
| 1.01Construction of Drama Stage @ Panapakkam Colony (Near Mariyamman Koil) H/O Panapakkam Panchayat | |||||
| 1.02 | Earth work excavation and depositing on bank with initial lead and lift in hard stiff clay and hard gravelly soil as per SS20B for narrow foundations . | 22.38 | m3 | 262.46 ₹5,873.85 Lowest | 300 ₹6,714 |
| 1.03 | Refilling basement with excavated earth other than sand complying the standard specification | 23.6 | m3 | 45.62 ₹1,076.63 Lowest | 50 ₹1,180 |
| 1.04 | Filling in basement with M.Sand including and all cost and conveyance to the site and all labour charges for filling to standard specification | 5.45 | m3 | 2,041.54 ₹11,126.39 Lowest | 2,100 ₹11,445 |
| 1.05 | C.C 1:4:8 mix using 40mm ISS HBG metal including cost and Conveyance of all etc. | 6.37 | m3 | 5,752.88 ₹36,645.85 Lowest | 5,800 ₹36,946 |
| 1.06 | Brick work in Cm mix using country bricks ground moulded of size 23x11x7 Cm for the following including curing etc., complete complying with standard specificatons | 14.48 | m3 | 6,981.18 ₹1,01,087.49 Lowest | 7,000 ₹1,01,360 |
| 1.07 | Supplying and erecting centering shuttering including necessary supports for plane surface in foundation and basement and in all floors for R C C column footing etc., complete., | 149.69 | m2 | 544.65 ₹81,528.66 Lowest | 600 ₹89,814 |
| 1.08 | Supplying and Fabrication and placing in position MS Steel or ribbed for steel for all reinforced cement concrete works as per the design given including cost of steel and blinding wire all floors etc., complete the compolying with standard specification | 1.5 | MT | 91,472.44 ₹1,37,208.66 Lowest | 91,500 ₹1,37,250 |
| 1.09 | Rainforcement Cement Concrete 1:1.5:3 using 20 mm ISS HBG metal for all RCC item of works excluding cost of reinforcement and fabricating charges, centering and shuttering but icluding curing and providing fixtures like fan clamps in the RCC floor or roof slabs wherever necessary and bearing surfaces of walls, sides and bottom of the slabs, beams, etc., shall be finished smooth with cement mortar 1:3, 12mm thick and with kraft paper without claiming extra as directed by the departmental officers complete complying with standard specifications. | 16.5 | m3 | 9,371.4 ₹1,54,628.1 Lowest | 9,400 ₹1,55,100 |
| 1.10 | Providing Gronolothick Floor Finish 25 mm Thick in cement concerete 1:2:4 mix by using 10-12 mm is hbg chips and m.sand inckluding cost anfd conveyance of all materials and labour charges | 39.74 | m2 | 167.96 ₹6,674.73 Lowest | 180 ₹7,153.2 |
Tender Value
₹8 L
EMD Value
₹8,000
Closing Date
17 Aug 2026, 3:00 pmClosed
BDO(BP)
BDO(BP) BDO Office Thiruvennainallur
VPM/TVN/MPLAD/26-27/PANAPAKKAM
2026_RDTN_690668_1
VPM/TVN/MPLAD/26-27/PANAPAKKAM
Open Tender
Civil Works
Works
120 days
Thiruvennainallur
Please refer Tender documents.
2 documents required · 2 mandatory
₹0
₹8,000
17 Aug 2026
4 Aug 2026
17 Aug 2026
4 Aug 2026
17 Aug 2026
4 Aug 2026
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1.01 | Construction of Drama Stage @ Panapakkam Colony (Near Mariyamman Koil) H/O Panapakkam Panchayat | - | - | - | - |
| 1.02 | Earth work excavation and depositing on bank with initial lead and lift in hard stiff clay and hard gravelly soil as per SS20B for narrow foundations . | 22.38 | m3 | 263.78 | ₹5,903.4 |
| 1.03 | Refilling basement with excavated earth other than sand complying the standard specification | 23.6 | m3 | 45.85 | ₹1,082.06 |
| 1.04 | Filling in basement with M.Sand including and all cost and conveyance to the site and all labour charges for filling to standard specification | 5.45 | m3 | 2,051.8 | ₹11,182.31 |
| 1.05 | C.C 1:4:8 mix using 40mm ISS HBG metal including cost and Conveyance of all etc. | 6.37 | m3 | 5,781.79 | ₹36,830 |
| 1.06 | Brick work in Cm mix using country bricks ground moulded of size 23x11x7 Cm for the following including curing etc., complete complying with standard specificatons | 14.48 | m3 | 7,016.26 | ₹1,01,595.44 |
| 1.07 | Supplying and erecting centering shuttering including necessary supports for plane surface in foundation and basement and in all floors for R C C column footing etc., complete., | 149.69 | m2 | 547.39 | ₹81,938.81 |
| 1.08 | Supplying and Fabrication and placing in position MS Steel or ribbed for steel for all reinforced cement concrete works as per the design given including cost of steel and blinding wire all floors etc., complete the compolying with standard specification | - | MT | 91,932.1 | - |
| 1.09 | Rainforcement Cement Concrete 1:1.5:3 using 20 mm ISS HBG metal for all RCC item of works excluding cost of reinforcement and fabricating charges, centering and shuttering but icluding curing and providing fixtures like fan clamps in the RCC floor or roof slabs wherever necessary and bearing surfaces of walls, sides and bottom of the slabs, beams, etc., shall be finished smooth with cement mortar 1:3, 12mm thick and with kraft paper without claiming extra as directed by the departmental officers complete complying with standard specifications. | 16.5 | m3 | 9,418.49 | ₹1,55,405.09 |
| 1.1 | Providing Gronolothick Floor Finish 25 mm Thick in cement concerete 1:2:4 mix by using 10-12 mm is hbg chips and m.sand inckluding cost anfd conveyance of all materials and labour charges | 39.74 | m2 | 168.8 | ₹6,708.11 |
stage.html
html • 0.03 MB
tech_eval.pdf
fin_eval.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.66 MB
BOQ_830405.xls
BOQ • 0.25 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at [email protected].