Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹54.7 LAccepted-AOC NA | NA | NA | 121004 | L1 | Accepted-AOC L1 | |
| 2 | L2₹58.9 L+₹4.2 L (7.65%)Rejected-AOC | L2 | Rejected-AOC L2 | |
| 3 | L3₹59.8 L+₹5.0 L (9.20%)Rejected-AOC | L3 | Rejected-AOC L3 | |
| 4 | L4₹60.5 L+₹5.8 L (10.6%)Rejected-AOC | L4 | Rejected-AOC L4 |
| Sl No | Description | Qty | Unit | M/S GEE PEE ASSOCIATES L3 | M/S S R CONSTRUCTION L1 | M/S SUDHIR CHANDRA CONSTRUCTION AND SUPPLIER L2 | M/S PRANALI INFRATECH PVT LTD L4 |
|---|---|---|---|---|---|---|---|
| 1.00 | Earth work in excavation in foundation in all types of soil including lift upto 1.5M and lead upto 30M and including back filling ,watering and ramming of excavated earth into the trenches or into the space between or into the plinth with removal and disposal of surplus earth as directed by the Engineer-in-charge upto a distance of 30M from the foundation tranches. | 428 | Cum | 50 ₹21,400 | 30 ₹12,840 Lowest | 50 ₹21,400 | 65 ₹27,820 |
| 2.00 | Centering and shuttering for C.C work in toe wall bed C.C etc i/c cost of all material, T&P etc complete. | 94 | Sqm | 190 ₹17,860 Lowest | 400 ₹37,600 | 600 ₹56,400 | 418 ₹39,292 |
| 3.00 | Centering and shuttering of R.C.C work as Raft, Slab, Abutment, Pier and wings etc. including cost of all material, T&P etc. complete. | 440 | Sqm | 320 ₹1,40,800 Lowest | 700 ₹3,08,000 | 400 ₹1,76,000 | 688 ₹3,02,720 |
| 4.00 | C.C. M-10 (1:3:6) with Cement & Stone grit 4 mm to 20 mm size For below Approch slab etc. Including cost of all Materials, Labour, T&P. etc. Complete. | 16 | Cum | 5,750 ₹92,000 | 6,200 ₹99,200 | 5,600 ₹89,600 | 5,314 ₹85,024 Lowest |
| 5.00 | C.C. M-15 (1:2:4) with Cement & Stone grit 4 mm to 20 mm size For below bed, floor, sleepers lining etc. Including cost of all Materials, Labour, T&P. etc. Complete. | 26 | Cum | 5,790 ₹1,50,540 Lowest | 6,500 ₹1,69,000 | 6,200 ₹1,61,200 | 5,790 ₹1,50,540 Lowest |
| 6.00 | R.C.C. (M-25 grade) 1:1:2 In main slab, approach slab, crash barrier etc. Including cost of all materials, labour and T&P etc. all completion of work. | 205 | Cum | 6,210 ₹12,73,050 Lowest | 7,500 ₹15,37,500 | 6,400 ₹13,12,000 | 6,560 ₹13,44,800 |
| 7.00 | C.C. (M-20 grade) 1:1.5:3 In toe wall, wing wall, transition etc. Including cost of all materials, labour and T&P etc. all completion of work. | 140 | Cum | 5,870 ₹8,21,800 Lowest | 7,100 ₹9,94,000 | 6,600 ₹9,24,000 | 6,150 ₹8,61,000 |
| 8.00 | R.C.C. (M-20 grade) 1:1.5:3 In cutoff wall etc. Including cost of all materials, labour and T&P etc. all completion of work. | 12 | Cum | 6,880 ₹82,560 | 7,500 ₹90,000 | 7,200 ₹86,400 | 6,417 ₹77,004 Lowest |
| 9.00 | R.C.C. (M-30 grade) In wearing coat etc.Including cost of all materials, labour and T&P etc. all completion of work. | 4.75 | Cum | 6,880 ₹32,680 | 7,600 ₹36,100 | 9,000 ₹42,750 | 6,530 ₹31,017.5 Lowest |
| 10.00 | Placing Steel Reinforcement for R.C.C. works Including cost of Materials,Cutting, Bending ,Binding,Welding, etc.Complete. | 22 | M.T. | 70,500 ₹15,51,000 | 68,000 ₹14,96,000 | 76,000 ₹16,72,000 | 64,800 ₹14,25,600 Lowest |
Tender Value
₹73 L
EMD Value
₹1.5 L
Closing Date
1 Jun 2026, 12:00 pmClosed
SE MGCCC-1, MEERUT
OFFICE OF SE MGCCC-1, MEERUT
01/SE/MRT/2026-27(LOT01)
2026_UPIDC_1151026_3
01/SE/MRT/2026-27
Open Tender
Civil Works
Item Rate
MORADABAD
Please refer Tender documents.
2 documents required · 2 mandatory
₹2,354
₹1.5 L
20 Jun 2026
27 May 2026
1 Jun 2026
27 May 2026
1 Jun 2026
27 May 2026
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Earth work in excavation in foundation in all types of soil including lift upto 1.5M and lead upto 30M and including back filling ,watering and ramming of excavated earth into the trenches or into the space between or into the plinth with removal and disposal of surplus earth as directed by the Engineer-in-charge upto a distance of 30M from the foundation tranches. | - | Cum | - | - |
| 2 | Centering and shuttering for C.C work in toe wall bed C.C etc i/c cost of all material, T&P etc complete. | - | Sqm | - | - |
| 3 | Centering and shuttering of R.C.C work as Raft, Slab, Abutment, Pier and wings etc. including cost of all material, T&P etc. complete. | - | Sqm | - | - |
| 4 | C.C. M-10 (1:3:6) with Cement & Stone grit 4 mm to 20 mm size For below Approch slab etc. Including cost of all Materials, Labour, T&P. etc. Complete. | - | Cum | - | - |
| 5 | C.C. M-15 (1:2:4) with Cement & Stone grit 4 mm to 20 mm size For below bed, floor, sleepers lining etc. Including cost of all Materials, Labour, T&P. etc. Complete. | - | Cum | - | - |
| 6 | R.C.C. (M-25 grade) 1:1:2 In main slab, approach slab, crash barrier etc. Including cost of all materials, labour and T&P etc. all completion of work. | - | Cum | - | - |
| 7 | C.C. (M-20 grade) 1:1.5:3 In toe wall, wing wall, transition etc. Including cost of all materials, labour and T&P etc. all completion of work. | - | Cum | - | - |
| 8 | R.C.C. (M-20 grade) 1:1.5:3 In cutoff wall etc. Including cost of all materials, labour and T&P etc. all completion of work. | - | Cum | - | - |
| 9 | R.C.C. (M-30 grade) In wearing coat etc.Including cost of all materials, labour and T&P etc. all completion of work. | - | Cum | - | - |
| 10 | Placing Steel Reinforcement for R.C.C. works Including cost of Materials,Cutting, Bending ,Binding,Welding, etc.Complete. | - | M.T. | - | - |
stage.html
html • 0.05 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 1.28 MB
TDNIT01SELOT1.pdf
Tender Documents • 1.37 MB
BOQ_2162406.xls
BOQ • 0.33 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .