| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹18.9 LAccepted-Finance | ₹18.9 L | L1 | Accepted-Finance BOQ Rate accepted |
| 2 | L2₹20.0 LAccepted-Finance TAMIL NADU N | KANCHIPURAM | TAMIL NADU | 600069 | ₹20.0 L | L2 | Accepted-Finance BOQ Rate accepted |
| Sl No | Description | Qty | Unit | M.VELLATHURAI | KAMATCHI INDUSTRIAL SERVICE |
|---|---|---|---|---|---|
| 1.00 | Dismantling the existing RCC for the required width & depth as per the instructions of engineer in charge and disposing the debris 1 Km. away from the site including cost of all materials, labours, lead, lift, curing, etc. complete. | 8.3 | M3 | 40,587 ₹47,892.66 | 41,915 ₹49,459.70 |
| 2.00 | Providing centering and shuttering arrangements for supporting the reinforced cement concrete surfaces rate including cost of all labour, lead, lift, etc., complete. | 41.4 | M2 | 45,126 ₹53,248.68 | 47,610 ₹56,179.80 |
| 3.00 | Supplying fabricating and fixing in position of RTS rod for reinforcement including cutting bending tying and fixing in position including cost of all materials, labour, binding wire, lead, lift etc., complete. | 830 | Kg | 77,190 ₹91,084.20 | 83,000 ₹97,940 |
| 4.00 | Providing RCC 1:1.5:3 using OP cement with 12mm to 20mm machine crushed HBG metal including cost of all materials, labours, lead, lift, curing, etc. complete - excluding cost of reinforcement and form work. | 8.3 | M3 | 82,170 ₹96,960.60 | 82,834 ₹97,744.12 |
| 5.00 | Attending Patchup in the concrete surface in inner walls & slab by providing primer coat of epoxy compound and applying 10mm thick epoxite epoxy screeding using quartz sand and epoxy compounds of Hindustan ciba geigy including cost of all materials, labours, leads, lifts, etc., Complete. | 239.9 | M2 | 5,27,780 ₹6.2 L | 5,51,770 ₹6.5 L |
| 6.00 | Providing two final coats of epoxite epoxy in the ceiling and inner wall of including cost of all materials, labour, lead, lift etc complete. | 351.8 | M2 | 2,67,368 ₹3.2 L | 2,77,922 ₹3.3 L |
| 7.00 | Providing PCC 1:1.5:3 screed concrete for floor using OP cement with 12mm chips for 50mm thickness machine crushed HBG metal including cost of all materials, labours, lead, lift, curing, etc. complete | 437.5 | M2 | 1,75,000 ₹2.1 L | 1,90,312.5 ₹2.2 L |
| 8.00 | Gunitting the prepared concrete surface at an average thickness of 50mm in two layer of 25mm each using op/pp cement mortar (1:3) by volume as per ISI 9082/1978 using guniting equipment the mixture being ejected and shot in to the surface by means of compressed air including treating the existing concrete surface before guniting with watering and applying cement slurry including cost of all materials, labour, lead, lift, T&P, staging, transport etc complete. | 84.5 | M2 | 2,94,905 ₹3.5 L | 3,05,045 ₹3.6 L |
| 9.00 | Applying two coats of DEKGUARD S / equivalent top coat to the exposed outer concrete surfaces by brush/roller coating continuously rate including cost of all materials, labours, lead, lift, etc, complete. | 84.5 | M2 | 33,800 ₹39,884 | 37,180 ₹43,872.40 |
| 10.00 | Labour charges for cutting, welding, fabrication & laying in position of the ISMC steel for column, MS plates including cost of labour charges, cutting, fabrication charges, lead, lift etc., complete (M.S scrap will be supplied by Dept.at free of cost) | 89 | Kg | 3,604.5 ₹4,253.31 | 4,272 ₹5,040.96 |
Tender Value
Refer Docs
EMD Value
₹16,800
Closing Date
17 Mar 2026, 2:00 pmClosed
Chief Engineer TTPS Tuticorin
Office of the Superintending Engineer Civil TTPS
Rectification Works to the Sea Water Tank and Floor of SWFP and AWPH in Unit 5 area
2026_EB_669249_1
CE SE C TTPS Spec.No. 428 25 26
Open Tender
Civil Works - Others
120 days
Tuticorin Thermal Power Station
Please refer Tender documents.
2 documents required · 2 mandatory
₹0
₹16,800
Yes
23 Mar 2026
2 Mar 2026
18 Mar 2026
2 Mar 2026
17 Mar 2026
2 Mar 2026
Dismantling the existing RCC for the required width & depth as per the instructions of engineer in charge and disposing the debris 1 Km. away from the site including cost of all materials, labours, lead, lift, curing, etc. complete.
Providing centering and shuttering arrangements for supporting the reinforced cement concrete surfaces rate including cost of all labour, lead, lift, etc., complete.
Supplying fabricating and fixing in position of RTS rod for reinforcement including cutting bending tying and fixing in position including cost of all materials, labour, binding wire, lead, lift etc., complete.
Providing RCC 1:1.5:3 using OP cement with 12mm to 20mm machine crushed HBG metal including cost of all materials, labours, lead, lift, curing, etc. complete - excluding cost of reinforcement and form work.
Attending Patchup in the concrete surface in inner walls & slab by providing primer coat of epoxy compound and applying 10mm thick epoxite epoxy screeding using quartz sand and epoxy compounds of Hindustan ciba geigy including cost of all materials, labours, leads, lifts, etc., Complete.
Providing two final coats of epoxite epoxy in the ceiling and inner wall of including cost of all materials, labour, lead, lift etc complete.
Providing PCC 1:1.5:3 screed concrete for floor using OP cement with 12mm chips for 50mm thickness machine crushed HBG metal including cost of all materials, labours, lead, lift, curing, etc. complete
Gunitting the prepared concrete surface at an average thickness of 50mm in two layer of 25mm each using op/pp cement mortar (1:3) by volume as per ISI 9082/1978 using guniting equipment the mixture being ejected and shot in to the surface by means of compressed air including treating the existing concrete surface before guniting with watering and applying cement slurry including cost of all materials, labour, lead, lift, T&P, staging, transport etc complete.
Applying two coats of DEKGUARD S / equivalent top coat to the exposed outer concrete surfaces by brush/roller coating continuously rate including cost of all materials, labours, lead, lift, etc, complete.
Labour charges for cutting, welding, fabrication & laying in position of the ISMC steel for column, MS plates including cost of labour charges, cutting, fabrication charges, lead, lift etc., complete (M.S scrap will be supplied by Dept.at free of cost)
Supplying and fabricating and forming in position of MS Channel, MS angles, MS plate, MS flat including cost of all materials hire charges for welding and cutting machine, welding rods including labour lead lift saftey appliances etc complete.
Painting two coats with ready mixed enamel paint for the steel surface over a coat of including cost of all materials, scaffolding charges, labours, lead, lift, curing, etc. Complete.
Supplying and providing Nito floor hard top over the existing PCC concrete surface of 5Kg/sqm and rubbed smooth with power float over the base concrete including cost of all materials, labour, lead, lift, etc complete.
Please Enable Macros to View BoQ information
stage.html
html • 0.03 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.27 MB
BOQ_804148.xls
BOQ • 0.32 MB
Download all tender documents and submit your bid