Loading…
Loading…
Tender ID
| # | Company | Status |
|---|---|---|
| 1 | Admitted-Fee/PreQual/Technical | Admitted-Fee/PreQual/Technical |
| 2 | Admitted-Fee/PreQual/Technical 504 MANGAL MURTI HEIGHTS RANI BAGAN HARMU ROAD RANCHI | RANCHI | JHARKHAND | 829205 | Admitted-Fee/PreQual/Technical |
| 3 | Admitted-Fee/PreQual/Technical H NO 73 OLD A G CO OPERATIVE SOCIETY KADRU RANCHI JHARKHAND 834002 | RANCHI | RANCHI | JHARKHAND | 834002 | Admitted-Fee/PreQual/Technical |
| 4 | Admitted-Fee/PreQual/Technical 3D VATIKA APARTMENT LINE TANK ROAD RANCHI JHARKHAND | RANCHI | RANCHI | JHARKHAND | 834001 | Admitted-Fee/PreQual/Technical |
| 5 | Admitted-Fee/PreQual/Technical | Admitted-Fee/PreQual/Technical |
Tender Value
₹54.7 Cr
EMD Value
₹54.8 L
Closing Date
6 Apr 2026, 12:00 pmClosed
Executive Engineer, RCD, Road Division, Bokaro
Executive Engineer, RCD, Road Division, Bokaro
Widening and Strengthening /Reconstruction of Nawadih to Ghutwe Hirak Road Via Chirudih -Manpur-Telo-Taranga Road (Total length 22.757 km) including construction of bridges under Road Division, Bokaro for the year 2025-26
2026_CECOM_111646_1
RCD/BOKARO/310/F.Y. 2025-26
Open Tender
Civil Works
Item Rate
515 days
Nawadih to Ghutwe Hirak Road
Please refer Tender documents.
3 documents required · 3 mandatory
₹10,000
₹54.8 L
C.E. (Comm), RCD, Jharkhand, Ranchi
8 Jul 2026
17 Mar 2026
8 Apr 2026
17 Mar 2026
6 Apr 2026
17 Mar 2026
27 Mar 2026
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Clearing and grubbing road land including uprooting rank vegetation, grass, bushes, shrubs, sapling and tress girth upto 300 mm, removal of stumps of tree cut earlier and disposal of unserviceable materials and stacking of sericeable material to be used of auctioned, up to a lead of 1000 metres including removal and disposal of top organic soil not exceeding 150mm in thickness. | 1 | HECT | - | - |
| 2 | Cutting of trees, excluding removal of stumps and roots of trees. Cutting of trees stacking of serviceble material with all lifts and up to a lead of 1000 metres.(i)Girth from 300mm to 600mm. | - | EACH | - | - |
| 3 | Cutting of trees, excluding removal of stumps and roots of trees. Cutting of trees stacking of serviceble material with all lifts and up to a lead of 1000 metres.(ii)Girth from 600mm to 900mm. | - | EACH | - | - |
| 4 | Cutting of trees, excluding removal of stumps and roots of trees. Cutting of trees stacking of serviceble material with all lifts and up to a lead of 1000 metres.(iii)Girth from 900mm to 1800mm. | - | EACH | - | - |
| 5 | Cutting of trees, excluding removal of stumps and roots of trees. Cutting of trees stacking of serviceble material with all lifts and up to a lead of 1000 metres.(i)Girth above 1800mm. | - | EACH | - | - |
| 6 | Removal of telephone/ Electric poles including excavation and dismantling of foundation concrete and lines under the supervision of concerned department , disposal with all lifts and up to a lead of 1000 metres and stacking the serviceable and unserviceable material separately | - | EACH | - | - |
| 7 | Removal of hand pumps including excavation and dismantling of foundation concrete and lines under the supervision of concerned department ,disposal with all lifts and up to a lead of 1000 metres and stacking the serviceable and unserviceable material separately. | - | Nos. | - | - |
| 8 | Dismantling of existing structures like culverts, bridges, retaining walls and other structure comprising of masonry, cement concree, wood work, steel work, including T&P and scaffolding wherever necessary, sorting the dismantled material, disposal of unserviceable material and stacking the serviceable material with allk lifts and lead of 1000 metres.Dismantling stone masonry ,By Manual means,Rubble stone masonary in cement mortar | 0.4 | M3 | - | - |
| 9 | Dismantling of existing structures like culverts, bridges, retaining walls and other structure comprising of masonry, cement concree, wood work, steel work, including T&P and scaffolding wherever necessary, sorting the dismantled material, disposal of unserviceable material and stacking the serviceable material with allk lifts and lead of 1000 metres.Prestressed /Reinforced cement concrete grade M20 & above | 0.2 | M3 | - | - |
| 10 | Dismantling of existing structures like culverts, bridges, retaining walls and other structure comprising of masonry, cement concree, wood work, steel work, including T&P and scaffolding wherever necessary, sorting the dismantled material, disposal of unserviceable material and stacking the serviceable material with allk lifts and lead of 1000 metres. Cement concrete grade M15 & M20 | 0.4 | M3 | - | - |
stage.html
html • 0.05 MB
tech_bid_open.pdf
cancelled_1.pdf
pdf • 0.33 MB
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.32 MB
SBDghutwe310.pdf
Tender Documents • 5.27 MB
BOQ_150768.xls
BOQ • 0.37 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .