Tender Value
₹12.4 Cr
EMD Value
₹6.3 L
Closing Date
26 Mar 2026, 3:00 pmClosed
Chief Engineer
Fishing Harbour Project Circle Fisheries and Fishermen Welfare Department Chennai-35
Construction of Bait Arch at Thomaiyarpuram Village of Radhapuram Taluk in Tirunelveli District
2026_AHDF_674300_1
24 DB F.114 N 2026 Dated 06.03.2026
Open Tender
Civil Works
Lump-sum
360 days
Thomaiyarpuram in Tirunelveli District
As per mentioned below
4 documents required · 4 mandatory
₹0
₹6.3 L
Yes
13 May 2026
13 Mar 2026
13 May 2026
13 Mar 2026
26 Mar 2026
13 Mar 2026
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Formation of Filter Layer for rubble mound Groyne with quarry run hard blue granite stone of weight upto 1Kg-10kg having a specific gravity of not less than 2.65 as per approved design and drawing including quarrying, loading transporting by tippers/lorries weighing in the electronic weigh bridge for measurement, dumping, placing in position to required level, profile and finishing the side slopes 1 : 1.5 on both sides with necessary equipment and devices as per the drawings and specification etc complete as directed by the Departmental Officers. The rate is also inclusive of placing, sectioning and finishing with necessary equipment and devices and hire and operational charges of tools and plants etc. (The payment shall be made on weight basis (ie) ladden weight minus unladden weight). The contractor has to make his own arrangements for weigh bridge. | 15,281 | MT | 885.55 | ₹1,35,32,089.55 |
| 2 | Formation of Core Layer for rubble mound Groyne with quarry run hard blue granite stone of weight upto 50kg - 200kg having a specific gravity of not less than 2.65 as per approved design and drawing including quarrying, loading transporting by tippers/lorries weighing in the electronic weigh bridge for measurement, dumping, placing in position to required level, profile and finishing the side slopes 1 : 1.5 on both sides with necessary equipment and devices as per the drawings and specification etc complete as directed by the Departmental Officers. The rate is also inclusive of placing, sectioning and finishing with necessary equipment and devices and hire and operational charges of tools and plants etc. (The payment shall be made on weight basis (ie) ladden weight minus unladden weight). The contractor has to make his own arrangements for weigh bridge. | 32,564 | MT | 885.55 | ₹2,88,37,050.2 |
| 3 | Formation of Toe Berm Layer for rubble mound Groyne with hard blue granite stone of weight ranging from 500 Kg to 800 Kg having a specific gravity of not less than 2.65 and as nearly cubical as possible as per approved design and drawing. The rate is inclusive of quarrying, loading at quarry using crane and other tools and plants as required, transporting by tippers/ lorries weighing on the electronic weigh bridge for measurement, Unloading/dumping placing in position to required level, profile and finishing the side slopes of 1 :1.5 using crane and floating equipment and devices as per the drawing and specification etc., complete and as directed by the Departmental Officers. The rate is inclusive of placing sectioning and finishing with necessary equipments and devices and hire and operational charges of tools and plants etc. (The payment shall be made on weight basis (ie) ladden weight minus unladden weight). The contractor has to make his own arrangements for weigh bridge. | 24,073 | MT | 910.55 | ₹2,19,19,670.15 |
| 4 | Formation of Armour Layer for rubble mound Groyne with hard blue granite stone of weight ranging from 1500 Kg to 2000Kg having a specific gravity of not less than 2.65 and as nearly cubical as possible as per approved design and drawing. The rate is inclusive of quarrying, loading at quarry using crane and other tools and plants as required, transporting by tippers/ lorries weighing on the electronic weigh bridge for measurement, Unloading/dumping placing in position to required level, profile and finishing the side slopes of 1 : 1.5 using crane and floating equipment and devices as per the drawing and specification etc., complete and as directed by the Departmental Officers. The rate is inclusive of placing sectioning and finishing with necessary equipments and devices and hire and operational charges of tools and plants etc. (The payment shall be made on weight basis (ie) ladden weight minus unladden weight). The contractor has to make his own arrangements for weigh bridge. | 30,676 | MT | 970.15 | ₹2,97,60,321.4 |
| 5 | Supplying and Filling with conveyed earth / Sea Rough sand in the sea shore for forming beach laying in layers of not more than 15cm thick well rammed and consolidated sectioning etc., completed as per standard spectification | 15,000 | m3 | 177.74 | ₹26,66,100 |
| 6 | Supply and filling in foundation and basement with Gravel in layers of not more than 15cm.thick well rammed watered and compacted with surface vibrator, watered and consolidated etc. complete complying with standard specification and as directed by the departmental officers. | 1,935 | m4 | 604.08 | ₹11,68,894.8 |
| 7 | Earth work Open excavation by Mechanical Means for Open Earthwork in all soils and sub-soils and to full depth as may be directed except in rock requiring blasting in- clusive of shoring shuttering, bailing out water wherever necessary and depositing the surplus earth within the compound in places shown by the departmental officers with an initial lead of 100 mts and clearing and levelling including dressing of sides and raming of bottoms etc., complete complying with standard specification and as directed by the departmental officers.
A). Upto 2.40m Depth. | 12,500 | m3 | 198.91 | ₹24,86,375 |
| 8 | Sub total Amount for above all items (excluding GST) | 1 | No | - | - |
| 9 | GST 18% for above SubTotal Amount | 1 | gst | - | - |
stage.html
html • 0.02 MB
tech_bid_open.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.33 MB
Thomaiyarpuramcover2.pdf
Tender Documents • 1.26 MB
Thomaiyarpuramcover1.pdf
Tender Documents • 0.86 MB
BOQ_810492.xls
BOQ • 0.36 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .