| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹1.9 CrAdmitted-Finance | ₹1.9 Cr | L1 | Admitted-Finance |
| 2 | L2₹1.9 CrAdmitted-Finance | ₹1.9 Cr | L2 | Admitted-Finance |
| 3 | Rejected-Technical | - | - | Rejected-Technical order copy of Performance / Experience certificate not emclosed |
| Sl No | Description | Qty | Unit | Satmax Solutions Private Limited L1 | J D POWER SOLUTIONS L2 |
|---|---|---|---|---|---|
| 1.00Supply and Erection of Prefabricated Insulated PUF Shelters at various locations at Kargil-Zanskar national highway for accommodation of snow clearance crew. | |||||
| 1.01 | Supply and erection of Prefabricated Shelter with covered verandah of size (30 Feet x 32 Feet) using PUF Panels, Steel Structure, False Ceiling, Door & Aluminum windows including electrical wiring/ fittings as well as plumbing and sanitary fitting complete at various locations on Kargil-Zanskar National Highway as per technical specifications Annexure ‘C’ and Drawings at Annexure ‘E’ | 6 | Nos | - | - |
| 1.02 | Construction of Plinth for erection of above Prefabricated PUF shelters of sizes (30’x32’) shall have following specifications:
xii) Depth of foundation should be 2’ and width 2’.
xiii) Plinth level (with DPC 4”) should be 3.5’ high from ground level and 1.5’ wide with plaster (1:6) at external side of the plinth.
xiv) Plinth will be filled with sand soil boulder, aggregate and PCC .
xv) Flouring should be done with M15 concrete mixture and finished with a coat of neat cement Slury.
xvi) Three steps stare case in front of main door of P.F. Huts.
xvii) Space for fixing Nut bolt and finishing after erection of P.F.Huts.
xviii) Plinth of P.F. Huts should not be cracked or up-down from ground level.
xix) Dumping area should be cleaned after the construction work.
xx) In the plinth size 20 x 24 and 16 x 24 (T.B) finishing of bathrooms (fitting in toilets and plumbing works).
xxi) Stand for water tanks and water tank should be included.
xxii) Earth work in excavation by mechanical means (Hydraulic excavator)/manual means in foundation trenches or drains.
xxiii) Filling available excavated earth (excluding rock) in trenches, plinth, sides of foundation etc.in layers | 6 | Nos | - | - |
Tender Value
₹1.7 Cr
EMD Value
₹3.5 L
Closing Date
19 Mar 2020, 12:00 pmClosed
Executive Engineer Mech. Div Kgl
Office of the Executive Engineer Mech. Div Kgl
Supply and Erection of Prefabricated Insulated PUF Shelters at various locations at Kargil-Zanskar national highway for accommodation of snow clearance crew.
2020_PWDJK_93968_1
MDK/E-NIT/35 OF 2019-20
Open Tender
Civil Works
180 days
Different locations at kargil-Zanskar NH-301
Please refer Tender documents.
7 documents required · 7 mandatory
₹2,000
Yes
Executive Engineer Mech. Div Kgl
₹3.5 L
Yes
Office of the Executive Engineer Mech. Div Kgl
14 Aug 2020
29 Feb 2020
20 Mar 2020
5 Mar 2020
19 Mar 2020
5 Mar 2020
13 Mar 2020
Amount
Supply and Erection of Prefabricated Insulated PUF Shelters at various locations at Kargil-Zanskar national highway for accommodation of snow clearance crew.
Supply and erection of Prefabricated Shelter with covered verandah of size (30 Feet x 32 Feet) using PUF Panels, Steel Structure, False Ceiling, Door & Aluminum windows including electrical wiring/ fittings as well as plumbing and sanitary fitting complete at various locations on Kargil-Zanskar National Highway as per technical specifications Annexure ‘C’ and Drawings at Annexure ‘E’
Construction of Plinth for erection of above Prefabricated PUF shelters of sizes (30’x32’) shall have following specifications: xii) Depth of foundation should be 2’ and width 2’. xiii) Plinth level (with DPC 4”) should be 3.5’ high from ground level and 1.5’ wide with plaster (1:6) at external side of the plinth. xiv) Plinth will be filled with sand soil boulder, aggregate and PCC . xv) Flouring should be done with M15 concrete mixture and finished with a coat of neat cement Slury. xvi) Three steps stare case in front of main door of P.F. Huts. xvii) Space for fixing Nut bolt and finishing after erection of P.F.Huts. xviii) Plinth of P.F. Huts should not be cracked or up-down from ground level. xix) Dumping area should be cleaned after the construction work. xx) In the plinth size 20 x 24 and 16 x 24 (T.B) finishing of bathrooms (fitting in toilets and plumbing works). xxi) Stand for water tanks and water tank should be included. xxii) Earth work in excavation by mechanical means (Hydraulic excavator)/manual means in foundation trenches or drains. xxiii) Filling available excavated earth (excluding rock) in trenches, plinth, sides of foundation etc.in layers
J D POWER SOLUTIONS
stage.html
html • 0.03 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 1.64 MB
BOQ_177263.xls
BOQ • 0.27 MB
Download all tender documents and submit your bid