DELHI JAL BOARD TU BLOCK PITAMPURA DELHI-34
Dehydration Overhauling AND Servicing of 1600 KVA Transformers 2 Nos of Areva make at Sec 29 Rohini BPS in AC 07
2024_DJB_251708_14
NIT NO. 23(M-3)
Open Tender
Miscellaneous Works
Item Rate
45 days
EE ENM M3
Please refer Tender documents.
3 documents required · 3 mandatory
₹500
Account No 50448339804
₹21,100
Yes
5 Feb 2024
5 Jan 2024
12 Jan 2024
5 Jan 2024
12 Jan 2024
5 Jan 2024
Disconnection of power supply from HT main HT panel after proper switching of 11KV Vacuum Circuit Breaker discharging the supply complete , then connection of earth discharge rod during the work , discharge of capacitor bank etc& drain out of transformer oil from transformer to empty oil drum by oil machine dismantling of conservative tank all protection release cable and boxes vent pipes and other items as required
Cleaning of transformer oil tank complete and removing of sludge settled in the bottom with the help of vacuum pressure cleaning machine trolley cleaning of core and winding of transformer with hot oil and proper safety precautions to prevent the winding damage as required cutting of old overheated insulation of winding Andre insulation of weak point with the help of HTC insulation material and proper typing etc.
Replacement of top cover gasket vertical vent gasket and missing hardware to stop the oil leakage
Replacement of Silica Gel breather installed
Insulating the H.T side leads and testing with magger .
Complete assembling of transformer after cleaning of complete transformer tightening of all connections of incoming and outgoing side and testing and checking of Insulation Resistance test with megger of winding and cable of both sides with HIV pot machine
Filling of transformer oil to up to top up level as required to make power
Repair & cleaning of cooling fins replacement of cooling fins and gasket and oil seal for stopping leakage of oil.
Dehydration and filtration of complete transformer oil and checking the dielectric strength at site as required
Complete cleaning and chemical washing of oily and muddy transformer body and painting of transformer with enamel paint
Insulating the L.T side bus bar with epoxy paint and testing the insulation by magger .
M/S HABRICK COMPANY
stage.html
html • 0.03 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .