Loading…
Tenderkart now works inside Claude and ChatGPT: search and analyse tenders right from your chat
Loading…
Tender ID
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | Ist₹1.2 LAccepted-AOC DHARNIDHAR KA PURA ATRAMPUR PRAYAGRAJ | Ist | Accepted-AOC L1 | |
| 2 | IInd₹1.2 LRejected-AOC 113 F BLOCK HOUSE NUMBER 113 F BLOCK PANKI KANPUR NAGAR UTTAR PRADESH 208020 | KANPUR NAGAR | UTTAR PRADESH | 208020 | IInd | Rejected-AOC L2 | |
| 3 | IIIrd₹1.2 LRejected-AOC 222 346 LUKERGANJ LUKERGANJ LUKERGANJ ALLAHABAD UTTAR PRADESH 211003 | PRAYAGRAJ | UTTAR PRADESH | 211003 | IIIrd | Rejected-AOC L3 |
Tender Value
₹1.2 L
EMD Value
₹2,000
Closing Date
14 Jul 2022, 5:00 pmClosed
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
Superintending Engineer
Electricity Transmission Circle-I, U.P. Power Transmission Corporation Ltd. 57- George Town, Prayagraj.
50-ETC-I(A)/ 2022-2023
2022_UPTCL_711411_1
50-ETC-I(A)/ 2022-2023
Open Tender
Electrical Works
Item Rate
365 days
Kaudihar, Prayagraj
Please refer Tender documents.
2 documents required · 2 mandatory
₹590
SE,ETC,PRAYAGRAJ
₹2,000
20 Aug 2022
29 Jun 2022
15 Jul 2022
29 Jun 2022
14 Jul 2022
29 Jun 2022
120 days
Amount
Annual maintenance of 09 Nos. Hitachi make 2 ton split AC (Mfy. 2014) at 132 KV S/S Kaurihar, Prayagraj. The job includes three time servicing in a year with the help of pressure machine vacuum pump by opening of the rotary fan blade, inner chamber of AC, outdoor unit after storage of gas in compressor then cleaning and refixing the all parts to complete the work satisfactory.
Proper and safe replacement of 2 ton Hitachi make split AC compressor from new in indoor unit. All T&P, material & labour shall be provided by the contractor at his own cost.
Proper and safe replacement of 2 ton Hitachi make split AC PCB plate from new indoor unit. All T&P material and Labour shall be provided by contractor at his own cost.
Proper and safe attending leakage of gas in 2 ton Hitachi make split AC compressor then feeling gas. All T&P material and labour shall be provided by contractor at his own cost.
Changing of capacitor CD-65/CB-65 capacity 25mf.
Changing of fan blade from new
Repairing of fan motor
B.R. ENTERPRISES
M/S New Sharma Electricals
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .