Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹1.2 CrAdmitted-Finance | ₹1.2 Cr | L1 | Admitted-Finance |
| 2 | L2₹1.2 Cr+₹3.3 L (2.75%)Admitted-Finance | ₹1.2 Cr+₹3.3 L (2.75%) | L2 | Admitted-Finance |
| 3 | Rejected-Technical | - | - | Rejected-Technical Not Qualifying in PQR |
| Sl No | Description | Qty | Unit | R.S ASSOCIATES L1 | shyam electrical engineering works L2 |
|---|---|---|---|---|---|
| 1.00 | 10 KVA SINGLE PHASE Alu. Wound Core – Dragging, Shifting, Handling of Transformer from stacking yard to repairing hall and draining of Oil into pit/drum and opening of all its accessories etc. | 4,000 | Nos. | 250 ₹10,00,000 | 220 ₹8,80,000 Lowest |
| 2.00 | Opening of top cover plate by cutting of sealed Transformer top cover plate by chisel Hammer Process and taking out the core and coil assembly from the tank. Removal of Old layers (Multilayers) of Top Cover Plate by welding/gas cutting after taking out the Tank at safe area. | 4,000 | Nos. | 300 ₹12,00,000 | 260 ₹10,40,000 Lowest |
| 3.00 | Dismantling core and coil assembly. Assembly of displaced core and cleaning of dust and dirt by cotton waste and wooden dust from every leaf of laminations,if required. (Welding/Brazing/Gas Cutting/Wooden Dust required for this work shall be arranged by the contractor). | 4,000 | Nos. | 217 ₹8,68,000 | 90 ₹3,60,000 Lowest |
| 4.00 | (A) Reconditioning of the damaged LV leg coils (3Nos.) of T/F, old and damage DPC insulation is to removed and new DPC insulation confirming to IS: 1271/53 is to be provided on LV strip after cleaning of strip LV coil should be made as per original design/design approved by concern JE/AE. Approx 5 KG as per GTP which ever is more Transformer for 10, KVA T/F respectively (Per Kg. rate to be Quoted). | 4,000 | Kg. (±20%) | 16 ₹64,000 Lowest | 160 ₹6,40,000 |
| 5.00 | (B) Making of LV Leg coils of same size and dimensions as old one or design approved by concern JE/AE with new wire. Approx 5 KG as per GTP which ever is more Transformer for 10, KVA T/F respectively (Per Kg. rate to be Quoted). | 4,000 | Kg. (±20%) | 4 ₹16,000 Lowest | 40 ₹1,60,000 |
| 6.00 | (A) Making of HV Leg coils of same size and dimensions as old one or design approved by concern JE/AE with new wire. Approx 10 KG as per GTP which ever is more Transformer for 10 KVA T/F respectively (Per Kg. rate to be Quoted). | 4,000 | Kg. (±20%) | 24 ₹96,000 Lowest | 210 ₹8,40,000 |
| 7.00 | (B) Re-Making of HV Leg coils of same size and dimensions as old one or design approved by concern JE/AE with old wire. Approx 10 KG as per GTP which ever is more Transformer for 10 KVA T/F respectively (Per Kg. rate to be Quoted). | 4,000 | Kg. (±20%) | 14 ₹56,000 Lowest | 140 ₹5,60,000 |
| 8.00 | Assembly of core and coils and fitting of other parts requiring replacements such as press board etc. Making supports between adjacent section by insulation spacers barriers etc. and tapping etc (Required Iron Strip & Iron Lock,Brazing/Soldering required, shall be arranged by the contractor). | 4,000 | Nos. | 197 ₹7,88,000 | 120 ₹4,80,000 Lowest |
| 9.00 | Shifting and keeping the assembled core and coils etc. In OVEN from the repairing and assembly place. | 4,000 | Nos. | 50 ₹2,00,000 Lowest | 60 ₹2,40,000 |
| 10.00 | Dragging of tank from the repair hall to yard and cleaning oil and dust etc. and scrapping the rust etc. Repairing of burst body & radiator properly with welding including repairing of bended base channel. | 4,000 | Nos. | 75 ₹3,00,000 Lowest | 80 ₹3,20,000 |
Tender Value
₹1.3 Cr
EMD Value
₹70,000
Closing Date
12 May 2021, 1:00 pmClosed
SE Workshop Circle, Agra
Urja Bhawan 220 KV S/s Sikandra Bypass Road, Agra
For Repairing of 10/16 KVA SP Alu. Wound Core to 25 KVA TP Cu. Wound Core Damaged Distribution Transformer at various workshop under EWD, Agra
2021_DVVNL_576216_2
38/2020-21
Open Tender
Electrical Works
Piece-work
365 days
DVVNL
as per Pre Qualifying Conditions
2 documents required · 2 mandatory
₹5,900
www.dvvnl.org
₹70,000
21 May 2021
4 May 2021
12 May 2021
4 May 2021
12 May 2021
4 May 2021
10 KVA SINGLE PHASE Alu. Wound Core – Dragging, Shifting, Handling of Transformer from stacking yard to repairing hall and draining of Oil into pit/drum and opening of all its accessories etc.
Opening of top cover plate by cutting of sealed Transformer top cover plate by chisel Hammer Process and taking out the core and coil assembly from the tank. Removal of Old layers (Multilayers) of Top Cover Plate by welding/gas cutting after taking out the Tank at safe area.
Dismantling core and coil assembly. Assembly of displaced core and cleaning of dust and dirt by cotton waste and wooden dust from every leaf of laminations,if required. (Welding/Brazing/Gas Cutting/Wooden Dust required for this work shall be arranged by the contractor).
(A) Reconditioning of the damaged LV leg coils (3Nos.) of T/F, old and damage DPC insulation is to removed and new DPC insulation confirming to IS: 1271/53 is to be provided on LV strip after cleaning of strip LV coil should be made as per original design/design approved by concern JE/AE. Approx 5 KG as per GTP which ever is more Transformer for 10, KVA T/F respectively (Per Kg. rate to be Quoted).
(B) Making of LV Leg coils of same size and dimensions as old one or design approved by concern JE/AE with new wire. Approx 5 KG as per GTP which ever is more Transformer for 10, KVA T/F respectively (Per Kg. rate to be Quoted).
(A) Making of HV Leg coils of same size and dimensions as old one or design approved by concern JE/AE with new wire. Approx 10 KG as per GTP which ever is more Transformer for 10 KVA T/F respectively (Per Kg. rate to be Quoted).
(B) Re-Making of HV Leg coils of same size and dimensions as old one or design approved by concern JE/AE with old wire. Approx 10 KG as per GTP which ever is more Transformer for 10 KVA T/F respectively (Per Kg. rate to be Quoted).
Assembly of core and coils and fitting of other parts requiring replacements such as press board etc. Making supports between adjacent section by insulation spacers barriers etc. and tapping etc (Required Iron Strip & Iron Lock,Brazing/Soldering required, shall be arranged by the contractor).
Shifting and keeping the assembled core and coils etc. In OVEN from the repairing and assembly place.
Dragging of tank from the repair hall to yard and cleaning oil and dust etc. and scrapping the rust etc. Repairing of burst body & radiator properly with welding including repairing of bended base channel.
Washing of Transformer tank with castic soda & water. Castic soda shall be provided by contractor.
Painting of inner side of transformer tank and channels with heat proof zinc chromate paint of good quality. (Berger, Nerolac, Jenson & Necholson etc) Paint material shall be provided by contractor at his own cost.
Dragging out clean empty tank from yard to repairing hall.
Taking out assembled core and coils assembly from the "OVEN" after proper magger value and shifting to repairing hall. (Meggar will be arranged by the contractor at his own cost.)
Retanking of complete assembly into painted tank and Proper tightening of the assembly in the tank safely by using nut bolts and spring washer of good quality. Fitting of all accessories of the transformer including fixing of pressure release valve/bend pipe for fixing of silica gel breather and filling of oil in transformer after check of BDV as per norms. (Top Cover Rubber Seal, Bend Pipe wiil be arranged by the contractor at his own cost.)
Continous Welding of top cover plate of repaired Transformer by electric welding and filling gaps wherever necessary.
(A) Painting of T/F outside with super enemal synthetic paint of SMOKE GRAY/YELLOW color in two coats after de-rusting and providing primer of red oxide paint etc. Paint & Painting Material shall be arranged by the contractor.
Dragging of repaired T/F upto the test cabin /testing place and making full arrangement for the testing of transformer and their re-dragging to yard and its stacking at indentified place.
(A) Punching of unique no. on MS plate 75x200x3 mm. size & Welding of MS Plate on Transformer Body containing following information:- (MS Plate & Punching Machine shall be provided by cotractor)
Daily cleaning of Workshop floor area, Open Shade and Open Area including the scrap material such as old paper, old pressboard, old cotton waste etc. (Wood dust, Sweeper, other required man power and T&P shall be arranged by the contractor).
16 KVA SINGLE PHASE Alu. Wound Core – Dragging, Shifting, Handling of Transformer from stacking yard to repairing hall and draining of Oil into pit/drum and opening of all its accessories etc.
Opening of top cover plate by cutting of sealed Transformer top cover plate by chisel Hammer Process and taking out the core and coil assembly from the tank. Removal of Old layers (Multilayers) of Top Cover Plate by welding/gas cutting after taking out the Tank at safe area.
Dismantling core and coil assembly. Assembly of displaced core and cleaning of dust and dirt by cotton waste and wooden dust from every leaf of laminations,if required. (Welding/Brazing/Gas Cutting/Wooden Dust required for this work shall be arranged by the contractor).
(A) Reconditioning of the damaged LV leg coils (3Nos.) of T/F, old and damage DPC insulation is to removed and new DPC insulation confirming to IS: 1271/53 is to be provided on LV strip after cleaning of strip LV coil should be made as per original design/design approved by concern JE/AE. Approx 5 KG as per GTP which ever is more Transformer for 16, KVA T/F respectively (Per Kg. rate to be Quoted).
(B) Making of LV Leg coils of same size and dimensions as old one or design approved by concern JE/AE with new wire. Approx 5 KG as per GTP which ever is more Transformer for 16, KVA T/F respectively (Per Kg. rate to be Quoted).
(A) Making of HV Leg coils of same size and dimensions as old one or design approved by concern JE/AE with new wire. Approx 10 KG as per GTP which ever is more Transformer for 16 KVA T/F respectively (Per Kg. rate to be Quoted).
(B) Re-Making of HV Leg coils of same size and dimensions as old one or design approved by concern JE/AE with old wire. Approx 10 KG as per GTP which ever is more Transformer for 16 KVA T/F respectively (Per Kg. rate to be Quoted).
Assembly of core and coils and fitting of other parts requiring replacements such as press board etc. Making supports between adjacent section by insulation spacers barriers etc. and tapping etc (Required Iron Strip & Iron Lock,Brazing/Soldering required, shall be arranged by the contractor).
Shifting and keeping the assembled core and coils etc. In OVEN from the repairing and assembly place.
Dragging of tank from the repair hall to yard and cleaning oil and dust etc. and scrapping the rust etc. Repairing of burst body & radiator properly with welding including repairing of bended base channel.
Washing of Transformer tank with castic soda & water. Castic soda shall be provided by contractor.
Painting of inner side of transformer tank and channels with heat proof zinc chromate paint of good quality. (Berger, Nerolac, Jenson & Necholson etc) Paint material shall be provided by contractor at his own cost.
Dragging out clean empty tank from yard to repairing hall.
Taking out assembled core and coils assembly from the "OVEN" after proper magger value and shifting to repairing hall. (Meggar will be arranged by the contractor at his own cost.)
Retanking of complete assembly into painted tank and Proper tightening of the assembly in the tank safely by using nut bolts and spring washer of good quality. Fitting of all accessories of the transformer including fixing of pressure release valve/bend pipe for fixing of silica gel breather and filling of oil in transformer after check of BDV as per norms. (Top Cover Rubber Seal, Bend Pipe wiil be arranged by the contractor at his own cost.)
Continous Welding of top cover plate of repaired Transformer by electric welding and filling gaps wherever necessary.
(A) Painting of T/F outside with super enemal synthetic paint of SMOKE GRAY/YELLOW color in two coats after de-rusting and providing primer of red oxide paint etc. Paint & Painting Material shall be arranged by the contractor.
Dragging of repaired T/F upto the test cabin /testing place and making full arrangement for the testing of transformer and their re-dragging to yard and its stacking at indentified place.
(A) Punching of unique no. on MS plate 75x200x3 mm. size & Welding of MS Plate on Transformer Body containing following information:- (MS Plate & Punching Machine shall be provided by cotractor)
Daily cleaning of Workshop floor area, Open Shade and Open Area including the scrap material such as old paper, old pressboard, old cotton waste etc. (Wood dust, Sweeper, other required man power and T&P shall be arranged by the contractor).
25 KVA THREE PHASE Alu. Wound Core -Dragging, Shifting, Handling of Transformer from stacking yard to repairing hall and draining of Oil into pit/drum and opening of all its accessories etc.
Opening of top cover plate by cutting of sealed Transformer top cover plate by chisel Hammer Process and taking out the core and coil assembly from the tank. Removal of Old layers (Multilayers) of Top Cover Plate by welding/gas cutting after taking out the Tank at safe area.
Dismantling core and coil assembly. Assembly of displaced core and cleaning of dust and dirt by cotton waste and wooden dust from every leaf of laminations,if required. (Welding/Brazing/Gas Cutting/Wooden Dust required for this work shall be arranged by the contractor).
(A) Reconditioning of the damaged LV leg coils (3Nos.) of T/F, old and damage DPC insulation is to removed and new DPC insulation confirming to IS: 1271/53 is to be provided on LV strip after cleaning of strip LV coil should be made as per original design/design approved by concern JE/AE. Approx 9 KG as per GTP which ever is more Transformer for 25 KVA T/F respectively (Per Kg. rate to be Quoted)
(B) Making of LV Leg coils of same size and dimensions as old one or design approved by concern JE/AE with new wire Approx 9 KG as per GTP which ever is more Transformer for 25 KVA T/F respectively (Per Kg. rate to be Quoted)
Making of HV Leg coils of same size and dimensions as old one or design approved by concern JE/AE with new wire. Approx 17 KG as per GTP which ever is more Transformer for 25 KVA T/F respectively (Per Kg. rate to be Quoted)
(B) Re-Making of HV Leg coils of same size and dimensions as old one or design approved by concern JE/AE with old wire. Approx 17 KG as per GTP which ever is more Transformer for 25 KVA T/F respectively (Per Kg. rate to be Quoted).
Assembly of core and coils and fitting of other parts requiring replacements such as press board etc. Making supports between adjacent section by insulation spacers barriers etc. and tapping etc (Required Iron Strip & Iron Lock,Brazing/Soldering required, shall be arranged by the contractor).
Shifting and keeping the assembled core and coils etc. In OVEN from the repairing and assembly place.
Dragging of tank from the repair hall to yard and cleaning oil and dust etc. and scrapping the rust etc. Repairing of burst body & radiator properly with welding including repairing of bended base channel.
Washing of Transformer tank with castic soda & water. Castic soda shall be provided by contractor.
Painting of inner side of transformer tank and channels with heat proof zinc chromate paint of good quality. (Berger, Nerolac, Jenson & Necholson etc) Paint material shall be provided by contractor at his own cost.
Dragging out clean empty tank from yard to repairing hall.
Taking out assembled core and coils assembly from the "OVEN" after proper magger value and shifting to repairing hall. (Meggar will be arranged by the contractor at his own cost.)
Retanking of complete assembly into painted tank and Proper tightening of the assembly in the tank safely by using nut bolts and spring washer of good quality. Fitting of all accessories of the transformer including fixing of pressure release valve/bend pipe for fixing of silica gel breather and filling of oil in transformer after check of BDV as per norms. (Top Cover Rubber Seal, Bend Pipe wiil be arranged by the contractor at his own cost.)
Continous Welding of top cover plate of repaired Transformer by electric welding and filling gaps wherever necessary.
(A) Painting of T/F outside with super enemal synthetic paint of SMOKE GRAY/YELLOW color in two coats after de-rusting and providing primer of red oxide paint etc. Paint & Painting Material shall be arranged by the contractor.
Dragging of repaired T/F upto the test cabin /testing place and making full arrangement for the testing of transformer and their re-dragging to yard and its stacking at indentified place.
(A) Punching of unique no. on MS plate 75x200x3 mm. size & Welding of MS Plate on Transformer Body containing following information:- (MS Plate & Punching Machine shall be provided by cotractor)
Daily cleaning of Workshop floor area, Open Shade and Open Area including the scrap material such as old paper, old pressboard, old cotton waste etc. (Wood dust, Sweeper, other required man power and T&P shall be arranged by the contractor).
shyam electrical engineering works
stage.html
html • 0.03 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .