Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹8.3 LAccepted-AOC | ₹8.3 L Quoted ₹8.7 L | L1 | Accepted-AOC L1 |
| 2 | L2₹8.9 LRejected-AOC NO 5 8TH STREET KALAINGAR NAGAR THIRUVOTTIYUR CHENNAI 600 019 | THIRUVALLUR | TAMIL NADU | 600019 | ₹8.9 L | L2 | Rejected-AOC L2 |
| Sl No | Description | Qty | Unit | KR CONTRACTOR L2 | SPS ENTERPRISES L1 |
|---|---|---|---|---|---|
| 1.00 | Charges for dismantling heavily eroded ECO outlet flue gas duct guide vane & support bar @ 37 mtr elevation. Charges including for T&P's and consumables. (Elevation -> 20 - 50 Mtr) | 1.25 | Ton | 18,500 ₹23,125 | 17,803 ₹22,253.75 |
| 2.00 | Charges for leading, lifting and transportation of new ECO outlet flue gas duct guide vane & support bar @ 37 mtr elevation from store to site. Charges including for T&P's and consumables. (Elevation -> 20 - 50 Mtr) | 4.75 | Ton | 7,400 ₹35,150 | 7,298 ₹34,665.50 |
| 3.00 | Charges for fabrication and erection of new ECO outlet flue gas duct guide vane & support bar @ 37 mtr elevation. Charges including for T&P's and consumables. (Elevation -> 20 - 50 Mtr) | 4.75 | Ton | 69,000 ₹3.3 L | 68,090 ₹3.2 L |
| 4.00 | Charges for fixing and removing the scaffolding arrangements around the Boiler area / Duct. Size 3 mtr x 3 mtr. Charges including for scaffolding material, leading, lifting, T&P's and consumables. | 20 | Opn | 3,700 ₹74,000 | 3,572 ₹71,440 |
| 5.00 | Charges for transporting the materials to outside workshop cutting into required size, bending to the required size and profile as per sample available at site, transporting to store. Charges including loading, transporting & unloading to stores | 4 | Ton | 16,000 ₹64,000 | 15,628 ₹62,512 |
| 6.00 | Supply of MS Plate 10mm thk
Material : IS 2062
Charges including loading, transporting & unloading to stores | 4 | Ton | 76,000 ₹3.0 L | 75,521 ₹3.0 L |
| 7.00 | Supply of MS Support bar
Material : IS 2062
Charges including loading, transporting & unloading to stores | 0.75 | Ton | 76,000 ₹57,000 | 75,521 ₹56,640.75 |
Tender Value
Refer Docs
EMD Value
₹9,100
Closing Date
26 Jun 2025, 2:00 pmClosed
CE NCTPS II
Office of Chief Engineer NCTPS II CHENNAI 120
NCTPS II MI Circle BM Division 600 MW Unit II Attending annual overhaul works
2025_EB_571294_1
CE NCTPS II SE M I O M 63 2025 26
Open Tender
Miscellaneous Works
40 days
SE MI NCTPS II
Please refer Tender documents.
2 documents required · 2 mandatory
₹0
₹9,100
Yes
31 Mar 2026
19 Jun 2025
27 Jun 2025
19 Jun 2025
26 Jun 2025
19 Jun 2025
stage.html
html • 0.04 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.72 MB
BOQ_682469.xls
BOQ • 0.34 MB
Download all tender documents and submit your bid