Loading…
Loading…
| # | Company | Quoted % | Amount | Rank | Status |
|---|---|---|---|---|---|
| 1 | L1₹2.3 LAdmitted-Fee/PreQual/Technical/Finance | -35.01% | ₹2.3 L | L1 | Admitted-Fee/PreQual/Technical/Finance |
| 2 | L2₹2.3 L+₹6,440.53 (2.86%)Admitted-Fee/PreQual/Technical/Finance | -33.15% | ₹2.3 L+₹6,440.53 (2.86%) | L2 | Admitted-Fee/PreQual/Technical/Finance |
| 3 | L3₹2.5 L+₹23,372.90 (10.4%)Admitted-Fee/PreQual/Technical/Finance | -28.26% | ₹2.5 L+₹23,372.90 (10.4%) | L3 | Admitted-Fee/PreQual/Technical/Finance |
| 4 | L4₹2.6 L+₹30,852.23 (13.7%)Admitted-Fee/PreQual/Technical/Finance | -26.10% | ₹2.6 L+₹30,852.23 (13.7%) | L4 | Admitted-Fee/PreQual/Technical/Finance |
| 5 | L5₹2.6 L+₹32,237.29 (14.3%)Admitted-Fee/PreQual/Technical/Finance | -25.70% | ₹2.6 L+₹32,237.29 (14.3%) | L5 | Admitted-Fee/PreQual/Technical/Finance |
Tender Value
₹3.5 L
EMD Value
₹6,920
Closing Date
2 Sept 2026, 4:00 pmClosed
Executive Engineer ID Ompora
Executive Engineer ID Ompora
Restoration of Labertal canal branch of Karshan Canal at Sholipora by way cement concrete work near flume.
2026_IFC_320620_8
enit No 7 of 08 2026
Open Tender
Civil Works
Percentage
25 days
Budgam
Please refer Tender documents.
5 documents required · 5 mandatory
₹200
Chief Engineer Kmr I and FC Deptt.
₹6,920
8 Sept 2026
12 Aug 2026
3 Sept 2026
12 Aug 2026
2 Sept 2026
12 Aug 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Earth work in bulk excavation by manual means over areas (exceeding 30 cm in depth, 1.5 m in width as well as 10 m2 on plan) including disposal of excavated earth lead upto 50 meters and lift upto 1.5 m, as directed by Engineer-in-Charge All kinds of soil : | 1.89 | cum | 592.9 | ₹1,120.58 |
| 2 | Demolishing cement concrete manually/by mechanical means including disposal of material within 50 meters lead as per direction of Engineer-incharge: 1:3:6 or richer mix (i/c equivalent design mix) | 5.76 | cum | 1,725.2 | ₹9,937.15 |
| 3 | Dumping stone excluding cost of stones. in Horizontal on level | 0.92 | cum | 237.9 | ₹218.87 |
| 4 | Supplyof stone soling (nallah) nominal size 225 mm | 0.92 | cum | 700 | ₹644 |
| 5 | Providing and laying in position cement concrete of specified grade including curing but excluding the cost of centring and shuttering. All work upto plinth level with: 1:2:4 (1 cement : 2 coarse sand : 4 graded stone aggregate 20 mm nominal size) | 25.41 | cum | 6,591.25 | ₹1,67,483.66 |
| 6 | Filling available excavated earth (excluding rock) in trenches, plinth, sides of foundations etc. in layers not exceeding 20 cm in depth, consolidating each deposited layer by ramming and watering, lead upto 50 m and lift upto 1.5 m. | 4.59 | cum | 218.4 | ₹1,002.46 |
| 7 | Centering and shuttering including strutting, propping etc. and removal of form work for: Foundations, footings, bases for columns | 152.66 | Sqm | 286.35 | ₹43,714.19 |
| 8 | 12mm Cement plaster of mix: 1 : 4 ( 1 cement : 4 fine sand) | 184.52 | Sqm | 283.8 | ₹52,366.78 |
| 9 | Silt clearance from canals. Inclusive of initial lead and lift ( 50m & 1.5m respectively ) Wet | 182.66 | cum | 184.95 | ₹33,782.97 |
| 10 | Carriage of Materials from source upto road site by Mechnical transport including cost of loading unloading and stacking .
Stone boulder avg. lead of 15 Kms | 0.92 | cum | 405.31 | ₹372.89 |
stage.html
html • 0.02 MB
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 5.96 MB
BOQ_1066482.xls
BOQ • 0.28 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .