Loading…
Loading…
Tender ID
Tender Value
₹9.8 L
EMD Value
₹97,885
Closing Date
26 Feb 2026, 3:00 pmClosed
C.E.3
Zone 3
Imp. Of HMP road With Footpath interlocking tiles from H-2 Block in Mahesh Trivedi (MLA) ji House in Ward 100 Zone 03
2026_NNKAN_1119578_1
264/A.A.3/24-25
Open Tender
Civil Works
Fixed-rate
Imp. Of HMP road With Footpath interlocking tiles
Please refer Tender documents.
2 documents required · 2 mandatory
₹1,180
₹97,885
23 Feb 2026
23 Feb 2026
26 Feb 2026
23 Feb 2026
26 Feb 2026
23 Feb 2026
P/F os solar Cat-eyes reflective lance of both side red/below color requard etc all comp
Dismantling Old interlocking tiles etc all comp
Dimantling Old B/W etc all comp
Earth Work in cutting in ordinary Soil lead 30 mt & lift 1.5 mtincl lab T&P etc all comp
Earth excavation for drain Work in ordinary soil lead 50 mt & lift 1.5 mt incl lab T&P etc all comp
Laying of base concrete 1:6:12 With cement C.Sand & 40 mm brick ballast including etc all comp
construction of PCC Block K&C-Type drain including material etc all comp
S/L/J of 300 mm dia RCC Hume/SW pipe With standard jointing material cement & Spun yam in mortar of cement etc all comp
Const. of gali pit With material etc all comp
Providing Laying spreading and conpacting graded stone aggregates to wet mix macadam ( W.MM) specification including premixing the materials with water at OMC in mechanical mix plant carriage etc all comp
Providing and applying 2.5 mm thick road maling strips of specified shade/colour using hit thermoplastic material by fully/semi autometic etc all comp
Prov./Laying bitumious Concrete (BC) 25 mm thick ( average) With computrised HMP type hot mix plant producing etc all comp
Prov./Laying 80 mm thick rubber moulded interlocking tiles With sand filling incl mat Lab T&P etc all comp
Sale of material to contractor old interlocking tiles etc all comp
Sale of material old bats etc all comp
Sale of material old brick etc all comp
Providing and laying bituminous macadam (BM) with 60-90 TPH hot mix plant producing an average output of 75 tonnes per hour using etc all comp
disposal of earth up to 3 km including loading & Unloading etc all comp
Prov/applying tack coat With bitumen using at the rate of 0.30 Kg per sqm as phalt before B.M.& S.D.C layer including etc all comp
Construction of granular sub base (GSB) by providing Well graded material, spreading in uniform layers With motor grader on prepared etc all comp
Add 18% GST
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 2.89 MB
BOQ_2081875.xls
BOQ • 0.27 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .