| # | Company | Quoted % | Amount | Rank | Status |
|---|---|---|---|---|---|
| 1 | L1₹64.4 LAdmitted-Finance | -35.55% | ₹64.4 L | L1 | Admitted-Finance |
| 2 | L2₹71.8 LAdmitted-Finance NORTH BLOCK COLLIERY PO BIDHANBAG BARDHAMAN BARDHAMAN 713337 WEST BENGAL INDIA | PASCHIM BARDHAMAN | WEST BENGAL | 713337 | -28.16% | ₹71.8 L | L2 | Admitted-Finance |
| 3 | L3₹72.8 LAdmitted-Finance 111 M C GARDEN ROAD KOL 30 | KOLKATA | WEST BENGAL | -27.14% | ₹72.8 L | L3 | Admitted-Finance |
| 4 | L4₹77.0 LAdmitted-Finance | -22.99% | ₹77.0 L | L4 | Admitted-Finance |
| 5 | L5₹78.0 LAdmitted-Finance | -21.99% | ₹78.0 L | L5 | Admitted-Finance |
Tender Value
₹99.9 L
EMD Value
₹1.3 L
Closing Date
18 Apr 2026, 5:00 pmClosed
General Manager, Kunustoria Area
Office of the General Manager, Kunustoria Area, Post - Toposi, Dist.- Paschim Bardhaman, West Bengal- 713362
Construction of New MMV House, Evasee, and Foundation compatible for VF-2000/PV 200 Fan for installation of New MMV at A Pit 2nd Drift of Bansra Colliery under Kunustoria Area.(3rd call)
2026_ECL_357799_1
ECL/GM/KNT/CIVIL/E- TENDER/25-26/541 Dated-30.03.2026
Open Tender
Civil Works - Others
180 days
Bansra Colliery
Please refer Tender documents.
5 documents required · 5 mandatory
₹1.3 L
1 Jun 2026
2 Apr 2026
20 Apr 2026
2 Apr 2026
18 Apr 2026
3 Apr 2026
2 Apr 2026 - 11 Apr 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Earth work in excavation by mechanical means (Hydraulic excavator) / manual means in foundation trenches or drains (not exceeding 1.5 m in width or 10 sqm on plan), including dressing of sides and ramming of bottoms, for all lift, including getting out the excavated soil and disposal of surplus excavated soil as directed, within a lead of 50 m.All kinds of soil. | - | cum | - | - |
| 2 | Supplying and filling in plinth with sand under floors, including watering, ramming, consolidating and dressing complete. | 1 | cum | - | - |
| 3 | Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level :1:3:6 (1 Cement : 3 coarse sand (zone-III) derived from natural sources : 6 graded stone aggregate 40 mm nominal size derived from natural sources) | - | cum | - | - |
| 4 | Brick work with common burnt clay F.P.S. (non modular) bricks of class designation 7.5 in foundation and plinth in:Cement mortar 1:6 (1 cement : 6 coarse sand) | - | cum | - | - |
| 5 | Brick work with common burnt clay F.P.S. (non modular) bricks of class designation 7.5 in superstructure above plinth level up to floor V level in all shapes and sizes in :Cement mortar 1:6 (1 cement : 6 coarse sand) | - | cum | - | - |
| 6 | Providing and laying in position specified grade of reinforced cement concrete, excluding the cost of centering, shuttering, finishing and reinforcement - All work up to plinth level :1:1.5:3 (1 cement : 1.5 coarse sand (zone-III) derived from natural sources : 3 graded stone aggregate 20 mm nominal size de rived from natural sources) | 1 | cum | - | - |
| 7 | Reinforced cement concrete work in walls (any thickness), including attached pilasters, buttresses, plinth and string courses, fllets, columns, pillars, piers, abutments, posts and struts etc. above plinth level up to floor five level, excluding cost of centering, shuttering, finishing and reinforcement:1:1.5:3 (1 cement : 1.5 coarse sand(zone-III) derived from natural sources : 3 graded stone aggregate 20 mm nominal size derived from natural sources) | 1 | cum | - | - |
| 8 | Providing and laying in position specified grade of reinforced cement concrete, excluding the cost of centering, shuttering, finishing and reinforcement - All work up to plinth level :1:2:4 (1 cement : 2 coarse sand (zone-III) derived from natural sources : 4 graded stone aggregate 20 mm nominal size de rived from natural sources) | 1 | cum | - | - |
| 9 | Centering and shuttering including strutting, propping etc. and removal of form forFoundations, footings, bases of columns, etc. for mass concrete. | - | sqm | - | - |
| 10 | Centering and shuttering including strutting, propping etc. and removal of form for Suspended floors, roofs, landings, balconies and access platform | - | sqm | - | - |
stage.html
html • 0.04 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.05 MB
Tendernotice_1.pdf
PDF • 1.25 MB
Tendernotice_2.pdf
PDF • 0.72 MB
BOQ_370662.xls
BOQ • 0.26 MB
Download all tender documents and submit your bid