Loading…
Tenderkart now works inside Claude and ChatGPT: search and analyse tenders right from your chat
Loading…
Tender ID
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
| # | Company | Status |
|---|---|---|
| 1 | Admitted-Fee/PreQual/Technical/Finance | Admitted-Fee/PreQual/Technical/Finance |
Tender Value
Refer Docs
Closing Date
27 Dec 2021, 2:00 pmClosed
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
Mohd Aslamul Haque
Purchase Dept., Ground Floor, Admin Building, RCF Ltd., Chembur, Mumbai
As per NIT
2021_RCFL_663844_1
E210211201
Single
Miscellaneous Goods
Supply
30 days
Mumbai
This tender is on a proprietary basis
Other vendors interested in quoting in our FUTURE TENDERS for this item,
may visit www.rcfltd.com for details of registration /prequalification.
UNSOLICITED BIDS WILL NOT BE ACCEPTED IN THIS TENDER.
8 documents required · 8 mandatory
₹0
Exempted
27 Dec 2021
18 Dec 2021
27 Dec 2021
18 Dec 2021
27 Dec 2021
18 Dec 2021
120 days
IMPELLER, PART NO.5, FOR MODIFIED SLURRY TRANSFER PUMP GA 231 / 235, MODEL NO. BPIL-SP-117 OF M/S BEL PUMPS. MATERIAL OF CONSTRUCTION: ASTM A -351 CD4MCu ; IMPELLER SHALL BE DYNAMICALLY BALANCED AS PER ISO- 1940 GR 6.3. NOTE: 1) HARDNESS : 275 BHN TO 325 BHN. 2) PARTY SHALL SUBMIT ORIGINAL MATERIAL TEST CERTIFICATE INDICATING ITS COMPOSITION & HARDNESS TEST CERTIFICATE FROM REPUTED METALLURICAL LAB ALONG WITH SUPPLY. 3) PARTY SHALL SUBMIT ORIGINAL DYNAMIC BALANCING CERTIFICATE ALONG WITH SUPPLY FROM EXTERNAL AGENCY
SUCTION COVER, PART NO.2, FOR MODIFIED SLURRY TRANSFER PUMP GA 231/235, MODEL NO. BPIL-SP-117 OF M/S BEL PUMPS. MATERIAL OF CONSTRUCTION: ASTM A -351 CD4MCu ; NOTE: 1) HARDNESS :275 BHN TO 325 BHN. 2) PARTY SHALL SUBMIT ORIGINAL MATERIAL TEST CERTIFICATE INDICATING ITS COMPOSITION & HARDNESS TEST CERTIFICATE FROM NABL ACCREDITED METALLURICAL LAB ALONG WITH SUPPLY
VOLUTE CASING, PART NO.3, FOR MODIFIED SLURRY TRANSFER PUMP GA 231 / 235, MODEL NO. BPIL-SP-117 OF M/S BEL PUMPS. MATERIAL OF CONSTRUCTION: ASTM A -351 CD4MCu ; NOTE: 1) HARDNESS :275 BHN TO 325 BHN. 2) PARTY SHALL SUBMIT ORIGINAL MATERIAL TEST CERTIFICATE INDICATING ITS COMPOSITION & HARDNESS TEST CERTIFICATE FROM NABL ACCREDITED METALLURICAL LAB ALONG WITH SUPPLY
COVER FOR BRG HOUSING PART NO. 20
REPELLER, PART NO.6, FOR MODIFIED SLURRY TRANSFER PUMP GA 231 / 235, MODEL NO. BPIL-SP-117 OF M/S BEL PUMPS. MATERIAL OF CONSTRUCTION: ASTM A -351 CD4MCu ; REPELLER SHALL BE DYNAMICALLY BALANCED AS PER ISO- 1940 GR 6.3. NOTE: 1) HARDNESS :275 BHN TO 325 BHN. 2) PARTY SHALL SUBMIT ORIGINAL MATERIAL TEST CERTIFICATE INDICATING ITS COMPOSITION & HARDNESS TEST CERTIFICATE FROM NABL ACCREDITED METALLURICAL LAB ALONG WITH SUPPLY. 3) PARTY SHALL SUBMIT ORIGINAL DYNAMIC BALANCING CERTIFICATE ALONG WITH SUPPLY FROM EXTERNAL AGENCY
BRG BRACKET WITH COVER FOR SLURRY TRANSFER PUMP MODEL NO SP-117 OF MAKE BEL PUMPS
IMPELLER, PART NO.3, FOR MODIFIED SCRUBBING LIQUID PUMP GA841/844 (SIZE:8X8X9, TYPE: SMK, CAPACITY : 300 M3/HOUR, HEAD: 40 METER, RPM: 2900) MODEL NO. BPIL-SP-122 OF M/S BEL PUMPS. MATERIAL OF CONSTRUCTION: CF3M. IMPELLER SHALL BE DYNAMICALLY BALANCED AS PER ISO- 1940 GR 6.3. NOTE: 1) PARTY SHALL SUBMIT ORIGINAL MATERIAL TEST CERTIFICATE INDICATING ITS COMPOSITION FROM NABL ACCREDITED METALLURICAL LAB ALONG WITH SUPPLY. 2) PARTY SHALL SUBMIT ORIGINAL DYNAMIC BALANCING CERTIFICATE ALONG WITH SUPPLY FROM EXTERNAL AGENCY
BEARING HOUSING WITH BOTH BEARING COVERS AND FOOT.OIL LUBRICATED TYPE WITH CONTINUOUS OIL LEVELLER FOR MODIFIED SCRUBBING LIQUID PUMP MODEL SP-122 MAKE : BEL PUMP
EXTERNAL COVER P/N 5102
INTERNAL COVER P/N 5101
STUFFING BOX / SUPPORTING BRACKET PART NO 3 FOR COLOUR COATING PUMP MATERIAL OF CONSTRUCTION: ASTM A 216- GR WCB MAKE : M/S BEL PUMPS , MODEL NO BPIL-SP-116
CASING PART NO 1 FOR COLOUR COATING PUMP MATERIAL OF CONSTRUCTION: ASTM A 216- GR WCB MAKE : M/S BEL PUMPS , MODEL NO BPIL-SP-116
stage.html
html • 0.02 MB
finance_698738.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .