| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹19.0 LAccepted-Finance | ₹19.0 L | L1 | Accepted-Finance 1st lowest |
| 2 | L2₹19.2 LAccepted-Finance SRIBHUMI PALLY VILL P O SURI DIST BIRBHUM PIN 731101 | SURI | BIRBHUM | WEST BENGAL | 731101 | ₹19.2 L | L2 | Accepted-Finance 2nd lowest |
| 3 | L3₹19.3 LRejected-Finance | ₹19.3 L | L3 | Rejected-Finance 3rd lowest |
| 4 | Rejected-Technical | - | - | Rejected-Technical Technically non-responsive |
| 5 | Rejected-Technical 157C LENIN SARANI KOLKATA 700013 WEST BENGAL | KOLKATA | KOLKATA | WEST BENGAL | 700013 | - | - | Rejected-Technical Technically non-responsive |
Tender Value
₹19.1 L
EMD Value
₹38,500
Closing Date
20 Feb 2026, 12:00 pmClosed
Executive Engineer (A-I)
Purta Bhaban 2nd Floor Burdwan
Re-Excavation and Development of Water Detention Structure (Dotalbona Pukur WDS) with Allied Structure Mouza-Shibdaspur,Block-Rampurhat-I G.P.-Kusumba, JL No-13, Plot No-373,Latitude-24.214731Deg.N, Longitude-87.745545Deg.E.in the District of Birbhum
2026_WRDD_999869_1
WRDD/BDNAID/23/2025-26/Gr.B of E.E AI BURDWAN
Open Tender
CIVIL WORKS
180 days
Birbhum
Please refer Tender documents.
3 documents required · 3 mandatory
₹38,500
10 Mar 2026
6 Feb 2026
23 Feb 2026
6 Feb 2026
20 Feb 2026
6 Feb 2026
Bailing out water by pump including all leads and lifts and including making all arrangements for disposal, where continuous flow or seepage of water is encountered and rating of pumps and hours of operation is specifically ascertained as per direction of the Engineer-in-charge. 60% of Existing Volume
Excavation in ordinary soil/mixed soil i.e. clay mixed with moorun,kankar,pebbles/siltdry or moist/slushy silt/sticky soil for WDS/WHS/RESERVOIR/SFMIS etc with hydraulic excavator of required bucket capacity including cutting and loading in tippers, trimming bottom and side slopes in accordance with requirement of lines,grades and crosssection and transporting to embankment/disposal site with in all lifts and lead upto1000 m including spreading,leveliing disposed spoils at disposed area. (mode of measurement: pre work and post work) 100% of Total Earth Work
Excavation in gravel/moorum/kankar/compact moorum/very much weathered rock/sticky soil mixed with moorum or ghooting for WDS/WHS/RESERVOIR/SFMIS etc with hydraulic excavator or any other means including cutting and loading in tippers,trimming bottom and side slopes in accordance with requirement of lines,grades and crosssection and transporting to embankment/disposalsite with in all lifts and lead upto1000 m including spreading, leveliing disposed spoils at disposed area. ( mode of measurement: pre work and post work)
Supplying, testing and installation of open Weave Jute Geo-textile (JGT) having overall weight of 500 gm/sq. m, thickness 6 mm, width 1220 mm, Tensile strength 10 KN/m (Warp direction) × 7.50 KN/m (weft direction) on slopes of embankments dressed and cut to a gradient as per design and drawing for control of surface soil erosion on proposed bank slope of embankment including the cost of preparation of subgrade and excavating the trenches of 500 mm deep and spade-width wide where necessary, and filling the trenches with earth duly secured to sub-grade by U shape MS staples (11 gauges) or wooden or plastic pegs at an interval of 450 mm, providing side lapping of 100 mm and horizontal lapping of 300 mm as per direction complete.The rate is inclusive of all incidental charges, transportation by all means to the work site, all leads and lifts complete. (Payment will made on the basis of finished surface area of the slope).
Inlet & Outlet Structure: Earth work in excavation of foundation trenches or drains, in all sorts of soil (including mixed soil but excluding laterite or sandstone) including removing,spreading or stacking the spoils within a lead of 75 m.as directed. The item includes necessary trimming the sides of trenches, levelling, dressing and ramming the bottom, bailing out water as required complete.(a) Depth of excavation not exceeding 1,500 mm
Filling in foundation or plinth by silver sand in layers not exceeding 150 mm as directed and consolidating the same by thorough saturation with water, ramming complete including the cost of supply of sand. (payment to be made on measurement of finished quantity) (B) by fine sand.
Ordinary Cement concrete ( mix 1:2:4) with graded stone chips (20 mm nominal size) excluding shuttering and reinforcement if any,in ground floor as per relevent IS codes. (a) Pakur Variety
200 mm thick Brick work with Fly Ash bricks set in cement sand morter (1:6) including racking out joints, curing, Scaffolding etc complete in all respect. (a) In Ground floor/ For inlet & outlet
Providing and laying reinforced cement concrete pipe NP3 with spigot socket for culverts on first class bedding of granular material in single row including fixing with cement mortar 1:2 as per Technical Specification Clause 1106 for Rural Roads of MORD. a) RCC pipe (NP3) with Spigot Socket - dia of pipe 600 mm, each Length 2.50 m For 1 no. inlet & 1 no. Outlet structure.
Bath Ghat: Earth Work in Excavation of foundation trenches or drains, in all sorts of soil (including mixed soil but excluding laterite or sandstone), including removing, spreding or stacking the spoils,within a lead of 75 m. as directed. The item includes necessary trimming the sides of trenches, levelling, dressing and ramming the bottoms, bailing out water as required complete. (a) Depth of excavation not exceding 1500 mm.
Filling in foundation or plinth by silver sand in layers not exceeding 150 mm as directed and consolidating the same by thorough saturation with water, ramming complete including the cost of supply of sand. (payment to be made on measurement of finished quantity) A) Do - by fine sand
Single Brick Flat Soling of picked Jhama bricks including ramming and dressing bed to proper level and filling joints with local sand.
Ordinary Cement concrete ( mix 1:2:4) with graded stone chips (20 mm nominal size) excluding shuttering and reinforcement if any,in ground floor as per relevent IS codes. (a) Pakur Variety.
Hire & Labour charges for suttering with centering and necessary staging up to 4 m using approved stout props and thick hard wood planks of approved thickness with required bracing for concrete slabs, beams and columns lintels curved or straight including fitting, fixing and striking out after completion of works (up to roof of ground floor) ( When the height of a paticular floor is more than 4 m the equivalent floor height shall be taken as 4 m and extra for works beyond the initial4 m ht. shall be allowed under 12(e) for every 4m or part thereof ). (a) 25 mm to 30 mm shuttering without staging in foundation
Plaster (to wall, floor, ceiling etc.) with sand and cement mortar including rounding off or chamfering corners as directed and raking out joints including throating, nosing and drip course, scaffolding/staging where necessary (Ground floor).[Excluding cost of chipping over concrete surface] (i) With (1:6) cement mortar (b) 15 mm thick plaster.
Neat cement punning about 1.5mm thick in wall, dado, window sill, floor etc. NOTE:Cement 0.152 cu.m per100 sq.m.
Supplying, fitting and fixing including transportation of sign board for identifying the exact location of MINI RLI scheme (one at road side and other at site) the board will be made 3 mm thick MS plate of size 300 mm x 600 mm and fitted and fixed on 50 mm GI Pipe of IS 1239/90 (part-1) including cutting, welding LS 3,677.51 and writting of both sides of Sign board. Base - Yellow, and words - Red. Both bottom end of the stands pipe will be grouted in 1:2:4 CC on a single brick flat soling. This will include one materials and labour complete as per drawing and direction of E.I.C.
Formation of WUA: Campaigning in the command area of one no WHT/WHR/RWHT/WDS Sub-Projects by community workers for mass awareness, capacity building to achieve sustainability of Sub-Projects. Cost include wage payment to community workers, transportation, leaflet etc.
Meeting cost of WUA formation cost including Refreshment, training materials, transport local conveyance, wage payment to community worker, remuneration to resource person and incidental charges.
Registration Cost for WUA under suitable act(Society) deed writing including registration charge, conveyance cost & opening of Bank A/C etc.
Livelihood plan / Micro plan formulation cost for minor irrigation scheme, cost including refreshment, training materials, transport local conveyance, wage payment to community worker, remuneration to resource person and incidental charge (rate on meeting).
Meeting and onside demonstration for operation & maintenance of scheme, water management and made of collection of water tax building of corpus fund etc.
IEC Materials (leaflet, poster, notebook)= 8meetings for Sl-12 and Sl-14.
Documentation Cost for activities of WUA scheme- by still photography, report booklet etc. in both hard and soft copy.
Impect study and monitoring of scheme by site visit of 2 Community workers during 3 years’ period.
Add GST @18% (CGST 9% AND SGST 9%) (Excluding procurement Items)
Add Labour Welfare cess (Excluding procurement Items) cess @1%
Please Enable Macros to View BoQ information
stage.html
html • 0.05 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.46 MB
Tendernotice_2.pdf
PDF • 0.61 MB
BOQ_2449385.xls
BOQ • 0.30 MB
Download all tender documents and submit your bid