| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹31.3 CrAccepted-AOC SRSC TOWER CP 1 105 PART C PHASE II RADHIKA VIHAR MATHURA 281001 | MATHURA | MATHURA | UTTAR PRADESH | 281001 | ₹31.3 Cr | L1 | Accepted-AOC Financial Bid accepted |
| 2 | L2₹31.8 CrRejected-Finance | ₹31.8 Cr | L2 | Rejected-Finance L2 |
| 3 | L3₹32.5 CrRejected-Finance | ₹32.5 Cr | L3 | Rejected-Finance L3 |
| 4 | L4₹33.0 CrRejected-Finance | ₹33.0 Cr | L4 | Rejected-Finance L4 |
| 5 | L5₹34.5 CrRejected-Finance S 6 IIND FLOOR FRIENDS TRADE CENTRE NEHRU NAGAR AGRA | AGRA | UTTAR PRADESH | ₹34.5 Cr | L5 | Rejected-Finance L5 |
Tender Value
Refer Docs
EMD Value
₹50 L
Closing Date
24 Dec 2024, 12:00 pmClosed
S.E, Jhansi Circle, P.W.D., Jhansi
Office of the S.E, Jhansi Circle, P.W.D., Jhansi
In District Orai Widening and Strengthening work of Jalaun Bhind road (SH-70) from Ch. 0.000 to 5.000 and Ch. 17.000 to 30.680 (Length 18.680 Km.)
2024_CEJNS_984004_1
8652/44 C-jhs-cir/24, Date 23.11.2024
Open Tender
Civil Works - Roads
456 days
Orai (Jalaun)
Please refer Tender documents.
3 documents required · 3 mandatory
₹7,750
₹50 L
Yes
Office of the S.E, Jhansi Circle, P.W.D., Jhansi
6 Mar 2025
17 Dec 2024
24 Dec 2024
17 Dec 2024
24 Dec 2024
17 Dec 2024
19 Dec 2024
Amount
Clearing grass and removal of rubbish up to a distance of 50 metres outside the periphery of the area .
Excavation for roadwork in soil with hydraulic excavator including cutting and loading in tippers, trimming bottom and side slopes, in accordance with requirements of lines, grades and cross sections, and transporting to the embankment location within all lifts and lead upto 1000m
Construction of embankment with approved materials deposited at site from roadway cutting and excavation from drain and foundation of other structures graded and compacted to meet requirement of table 300-2.
Construction of embankment with approved material obtained from borrow pits with all lifts and leads, transporting to site, spreading, grading to required slope and compacting to meet requirement of table 300-2.
Construction of embankment with approved material obtained from Local pits with all lifts and leads, transporting to site, spreading, grading to required slope and compacting to meet requirement of table 300-2.
Construction of granular sub-base by providing close graded material, spreading in uniform layers with motor grader on prepared surface, mixing by mix in place method with front end loader at OMC, and compacting with vibratory roller to achieve the desired density, complete as per clause 401
Providing, laying, spreading of graded stone aggregate(WMM) after mixing with water at OMC in mechanical mix plant carriage of mixed Material by tipper to site, laying on subbase/Sub Grade and compacting with road roller to achieve the desire density..
Providing, laying, spreading of graded stone aggregate(WMM) after mixing with water at OMC in mechanical mix plant carriage of mixed Material by tipper to site, laying with 1% OPC cement + 3.5% emulsion on subbase/Sub Grade and compacting with road roller to achieve the desire density..
Providing and laying dense graded bituminous macadam (Grading -1) with 100-120 TPH batch type HMP producing an average output of 75 tonnes per hour using crushed aggregates of specified grading, premixed with bituminous binder @ 4.0 per cent V.G.-40 by weight of total mix and filler, transporting the hot mix to work site, laying with a hydrostatic paver finisher with sensor control to the required grade, level and alignment, rolling with smooth wheeled, vibratory and tandem rollers to achieve the desired compaction as per MoRTH specification clause No. 507 complete in all respects.
Providing and laying dense graded bituminous macadam (Grading -2) with 100-120 TPH batch type HMP producing an average output of 75 tonnes per hour using crushed aggregates of specified grading, premixed with bituminous binder @ 4.5 per cent V.G.-40 by weight of total mix and filler, transporting the hot mix to work site, laying with a hydrostatic paver finisher with sensor control to the required grade, level and alignment, rolling with smooth wheeled, vibratory and tandem rollers to achieve the desired compaction as per MoRTH specification clause No. 507 complete in all respects.
Providing and laying bituminous concrete with 100-120 TPH batch type hot mix plant producing an average output of 75 tonnes per hour using crushed aggregates of specified grading, premixed with bituminous binder @ 5.4 per cent VG40 and filler, transporting the hot mix to work site, laying with a hydrostatic paver finisher with sensor control to the required grade, level and alignment, rolling with smooth wheeled, vibratory and tandem rollers to achieve the desired compaction as per MORTH specification clause No. 509 complete in all respects
Construction of sub-grade and earthen shoulders with approved material obtained from Local pits with all lifts & leads, transporting to site, spreading, grading to required slope and compacted to meet requirement of table No. 300-2
Construction of sub-grade and earthen shoulders with approved material obtained from borrow pits with all lifts & leads, transporting to site, spreading, grading to required slope and compacted to meet requirement of table No. 300-2
Earth work in excavation of foundation of structures as per drawing and technical specification, including setting out, construction of shoring and bracing, removal of stumps and other deleterious matter, dressing of sides and bottom and backfilling with approved material.
Sand Filling in Foundation Trenches as per Drawing & Technical Specification
Concrete with 4 cm (1.5") gauge stone ballast fine local sand of 1.25 Fineness modulous and cement on proporation of 1:3:6 in foundation and under floors including supply of all material labour and T&P etc. required for proper completion of the work. (S.I. no. 280)
PCC Grade M15 using batching plant & Concrete pump
RCC Grade M25 using batching plant transit mixer & Concrete pump
First class brick work masonary in 1:4 with cement, sand mortar including all material, abour, T&P etc. required for proper completion of work in foundation & plingth.S.I.No-305
12 mm thick plaster in 1:4 cement , sand mortar including supply of all material including cost of all material labour , T&P etc. required for proper completion of work.(S.I 17.58 ii)
Supply & Laying of Hume pipe S & S Type in position with cement and sand mortar in 1:2 withsun including labour and T & P etc. required for proper completion of work as per direction of by the Engineer-in-charge N.P-3-Type (a) (1000 mm dia)
Supply & Laying of Hume pipe S & S Type in position with cement and sand mortar in 1:2 withsun including labour and T & P etc. required for proper completion of work as per direction of by the Engineer-in-charge N.P-3-Type (a) 600 mm dia
Supplying, Fitting and Placing un-coated HYSD bar Reinforcement in Foundation complete as per Drawing and Technical Specifications
Providing and laying of Filter media with granular materials/stone crushed aggregates satisfying the requirements laid down in clause 2504.2.2. of MoRTH specifications to a thickness of not less than 600 mm with smaller size towards the soil and bigger size towards the wall and provided over the entire surface behind abutment, wing wall and return wall to the full height compacted to a firm condition complete as per drawing and Technical Specification.
Providing weep holes in Brick masonry/Plain/ Reinforced concrete abutment, wing wall/ return wall with 100 mm dia AC pipe, extending through the full width of the structure with slope of 1V :20H towards drawing foce. Complete as per drawing and Technical Specifications
Supply & fixing of Hectometer, Kilometers, boundary stone & level pillars.(5th Kilometers)
Ordinary Kilometers
Hectometer
The routine maintenance of above road work including embankment,patri,pavement, road sides and cross drains, hume pipe culvert etc to the required standards and in the manner as defined in CB Condition and keep the entire road surface and structure in Defect free condition during the entire maintenance period which begins from the actual Completion Date and ends after five years. (including cost of material T&P labour but excluding GST) for 1st year maintenance cost (0.0% Construction Cost)
The routine maintenance of above road work including embankment,patri,pavement, road sides and cross drains, hume pipe culvert etc to the required standards and in the manner as defined in CB Condition and keep the entire road surface and structure in Defect free condition during the entire maintenance period which begins from the actual Completion Date and ends after five years. (including cost of material T&P labour but excluding GST) for 2nd year maintenance cost (0.25% Construction Cost)
The routine maintenance of above road work including embankment,patri,pavement, road sides and cross drains, hume pipe culvert etc to the required standards and in the manner as defined in CB Condition and keep the entire road surface and structure in Defect free condition during the entire maintenance period which begins from the actual Completion Date and ends after five years. (including cost of material T&P labour but excluding GST) for 3rd year maintenance cost (0.50% Construction Cost)
The routine maintenance of above road work including embankment,patri,pavement, road sides and cross drains, hume pipe culvert etc to the required standards and in the manner as defined in CB Condition and keep the entire road surface and structure in Defect free condition during the entire maintenance period which begins from the actual Completion Date and ends after five years. (including cost of material T&P labour but excluding GST) for 4th year maintenance cost (0.75% Construction Cost)
The routine maintenance of above road work including embankment,patri,pavement, road sides and cross drains, hume pipe culvert etc to the required standards and in the manner as defined in CB Condition and keep the entire road surface and structure in Defect free condition during the entire maintenance period which begins from the actual Completion Date and ends after five years. (including cost of material T&P labour but excluding GST) for 5th year maintenance cost (1% Construction Cost)
M/s HARI CONSTRUCTION (BID ID -4808478)
M/S YATINDRA KUMAR TRIPATHI (BID ID -4808338)
SHAKUNTALA SINGH (BID ID -4807709)
SRS EXPRESS PRIVATE LIMITED (BID ID -4808369)
KRISHNA CIVICONS (INDIA) PRIVATE LIMITED (BID ID -4809341)
SHARMA CONSTRUCTION PROJECT PVT LTD (BID ID -4808485)
M/s Raj Laxmi Enterprises (BID ID -4809511)
M/S LUCKY TRADERS (BID ID -4809307)
GSR Infratech pvt ltd (BID ID -4806617)
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Download all tender documents and submit your bid