Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹1.8 LAccepted-AOC 36 137 THANGAMAPURIPATTINAM METTUR DAM 636 402 | SALEM | TAMIL NADU | 636402 | ₹1.8 L Quoted ₹1.7 L | L1 | Accepted-AOC L1 |
| Sl No | Description | Qty | Unit | SRI V M A ENTERPRISES L1 |
|---|---|---|---|---|
| 1.00 | Charges for Dismantling and Assembling of HT/LT Terminal links for 250MVA GT. | 1 | Nos | 24,864 ₹24,864 |
| 2.00 | Charges for Dismantling and Assembling of HT/LT Terminal links in 16MVA UAT-A & B. | 1 | Nos | 12,432 ₹12,432 |
| 3.00 | Charges for Dismantling and Assembling of all the inspection covers, Checking tightness & healthiness of support insulators and internal cleaning of 15.75KV Bus duct of GT. | 1 | Nos | 26,800 ₹26,800 |
| 4.00 | Charges for Inspection & cleaning of Bus PT cubicle, SP cubicle and checking tightness of Bus PT& SP. | 1 | Nos | 8,933 ₹8,933 |
| 5.00 | Charges for Inspection and checking tightness of generator Phase & Neutral side links. | 1 | Nos | 8,933 ₹8,933 |
| 6.00 | Charges for dismantling and re-assembling the terminal bus bar links of phase side of turbo generator (per phase) conducting test. | 3 | Nos | 9,407 ₹28,221 |
| 7.00 | Charges for dismantling and re-assembling the terminal bus bar links of neutral side of turbo generator (per phase) (each phase consists of 2 Nos. bushing) for conducting statutory test. | 3 | Nos | 14,110 ₹42,330 |
| 8.00 | Charges for Internal inspection carried out in Generator casing through man hole inspection cover. | 1 | Nos | 9,340 ₹9,340 |
| 9.00 | Material Charges :
1)CRC 500ml | 2 | Nos | 426 ₹852 |
| 10.00 | 2)Bolt & Nuts various sizes | 4 | Kgs | 162 ₹648 |
Tender Value
Refer Docs
EMD Value
₹1,600
Closing Date
18 Aug 2025, 2:00 pmClosed
CHIEF ENGINEER/MTPS-I
CHIEF ENGINEER MTPS-I METTUR DAM
MTPS-I ES Circle EM-I Unit-III 1 Dismantling and reassembling of HTLT terminal links of any one Generator Transformer and any one UAT 2 Dismantling the terminals of any one Turbo generator Unit-I to IV for conducting statutory testing for a period
2025_EB_588385_1
CE-MTPSI-SE-ES-EM-I-OT61-25-26
Open Tender
Electrical Works
15 days
MTPS-I/METTURDAM
AS PER TENDER SPECIFICATION
4 documents required · 4 mandatory
₹0
₹1,600
Yes
16 May 2026
2 Aug 2025
19 Aug 2025
2 Aug 2025
18 Aug 2025
2 Aug 2025
Amount
Charges for Dismantling and Assembling of HT/LT Terminal links for 250MVA GT.
Charges for Dismantling and Assembling of HT/LT Terminal links in 16MVA UAT-A & B.
Charges for Dismantling and Assembling of all the inspection covers, Checking tightness & healthiness of support insulators and internal cleaning of 15.75KV Bus duct of GT.
Charges for Inspection & cleaning of Bus PT cubicle, SP cubicle and checking tightness of Bus PT& SP.
Charges for Inspection and checking tightness of generator Phase & Neutral side links.
Charges for dismantling and re-assembling the terminal bus bar links of phase side of turbo generator (per phase) conducting test.
Charges for dismantling and re-assembling the terminal bus bar links of neutral side of turbo generator (per phase) (each phase consists of 2 Nos. bushing) for conducting statutory test.
Charges for Internal inspection carried out in Generator casing through man hole inspection cover.
Material Charges : 1)CRC 500ml
2)Bolt & Nuts various sizes
Cost of consumables
stage.html
html • 0.04 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.PDF
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.77 MB
BOQ_702924.xls
BOQ • 0.35 MB
Download all tender documents and submit your bid