| # | Company | Quoted % | Amount | Rank | Status |
|---|---|---|---|---|---|
| 1 | L1₹3.8 CrAdmitted-Finance | -2.80% | ₹3.8 Cr | L1 | Admitted-Finance |
Tender Value
₹3.9 Cr
EMD Value
₹11.7 L
Closing Date
16 Jun 2026, 3:00 pmClosed
Udhayan Prabhari Ghaziabad Nagar Nigam
IV floor Udhaayn Vibhag Ghaziabad Nagar Nigam
Work-3 Beautification work involving the construction of dividers and pathways along the Meerut Road, extending from T.G. Road through Rajnagar Extension to the Rajnagar Extension Road.
2026_DOLBU_1157217_3
047/UDHYAAN/2026-27 GNN DT 30-05-2026
Open Tender
Miscellaneous Works
Percentage
Ghaziabad Nagar Nigam
Please refer Tender documents.
2 documents required · 2 mandatory
₹22,938
₹11.7 L
15 Jul 2026
5 Jun 2026
16 Jun 2026
5 Jun 2026
16 Jun 2026
5 Jun 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Taking out existing kerb stones of all types from footpath/central verge, including removal of mortar etc, disposal of unserviceable material to | 6,461.99 | rmt | 30 | ₹1,93,859.7 |
| 2 | Earth work in foundation in ordinary soil including lift upto filling watering & ramming of excavated earth trenches or into space between the building & sides of foundation and disposal of excavated earth upto 30 m, as directed by Engineer-in-Charge SI no-For RCC work | 1,759.5 | cum | 110 | ₹1,93,545 |
| 3 | Laying of concrete in the proportion of 1:6:12 onc of cement, six of e-sand & twelve of 4cm gauge brick ballast all complete work. Si no-5.01 S.Item- | 281.52 | cum | 4,000 | ₹11,26,080 |
| 4 | Providing & laying in position ready mixed M-25 grade concrete for reinforced cement concrete work using cement content as per automatic batching plant & transported to having continous agilated mixer, manufacture as per mix design of 4 specified grade for reinforced cement concrete work including pumping RMC from transit mixer to site of laying, excluding the cost of centering. shuttering finishing & reinforcement, including cost of admixtures in recommended proportions as per IS: 9103 to accelerate/retard setting of concrete | 1,597.27 | cum | 7,247.15 | ₹1,15,75,655.28 |
| 5 | Tor steel( 1% of qty RCC x density of steel) | 1,25,385.7 | kg | 81.66 | ₹1,02,38,996.26 |
| 6 | Foundation | 757 | sqm | 405 | ₹3,06,585 |
| 7 | Wall | 3,557.9 | sqm | 810 | ₹28,81,899 |
| 8 | Supplying & fixing of kerb stone all complete work | 3,877.2 | rmt | 409 | ₹15,85,774.8 |
| 9 | Laying at or near ground level old kerb stones of all types in position to the required line, level and curvature, jointed with cement mortar 1:3 (1 cement 3 coarse sand), including making joints with or without grooves (thickness of joints, except at sharp curve, shall not be more than 5 mm), including 8 making drainage opening wherever required etc. | 6,549.89 | rmt | 109.45 | ₹7,16,885.46 |
| 10 | Providing wall putty on new surface with approved 9 quality material of J.K/Birla Si.no-15.26 new item | 7,948.5 | sqm | 90 | ₹7,15,365 |
stage.html
html • 0.03 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.90 MB
BOQ_2168443.xls
BOQ • 0.34 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .