Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹5.5 LAccepted-AOC | ₹5.5 L | L1 | Accepted-AOC L1 |
| 2 | L1₹5.5 LRejected-AOC 1 RAHINDRA NAGAR SARANI KOLKATA 65 | KOLKATA | ₹5.5 L | L1 | Rejected-AOC L1 |
| 3 | L2₹5.5 LRejected-AOC INDIRAPALLY ATHARAKHAI | ₹5.5 L | L2 | Rejected-AOC L2 |
Tender Value
₹5.5 L
EMD Value
₹11,031
Closing Date
25 Feb 2026, 6:50 pmClosed
PRADHAN
Atharakhai Gram Panchayat Shivmandir, P.O. Kadamtala, Dist. Darjeeling
CONT. OF PUCC ROAD FROM H/O. RAJESH SINGHA TOWARDS H/O. BIJU DUTTA TOWARDS H/O. MATIGARA-I GP AT DIGLIJOTE SANSAD (111648066)
2026_ZPHD_1008862_1
12/AGP/2025-26, DATE-17/02/2026
Open Tender
CIVIL WORKS
30 days
DIGLIJITE
Please refer Tender documents.
3 documents required · 3 mandatory
₹0
₹11,031
11 May 2026
18 Feb 2026
28 Feb 2026
18 Feb 2026
25 Feb 2026
18 Feb 2026
Construction of Sub Base using Local Materials, spreading in uniform layers with Motor grader on prepared surface, including screening the metal as necessary, mixing by mix in place method with Rotavator at OMC, and compacting with vibratory roller to achieve the desired density, lighting, guarding and barricading including cost and carriage of all materials and making necessary earthen bundh of one metre wide on each side to protect the edges complete as per Clause 401 of Specifications for Road & Bridge Works of MoRT&H (5th Revision).
Supplying and laying Polythene Sheet (150gm / sq.m.) over damp proof course or below flooring or roof terracing or in foundation or in foundation trenches.
(II) Ordinary Cement concrete (mix 1:2:4) with graded stone chips (20 mm nominal size) excluding shuttering and reinforcement,if any, in ground floor as per relevant IS codes. River bazree.
Hire and labour charges for Shuttering with or without staging upto 4.0 m height using approved stout props with wooden planks/ply wood/steel sheet plate with required bracing for any kind of plain or reinforced concrete works in all sorts of minor structure including culvert, box culvert, cross-drain etc. The rate is inclusive of fitting, fixing and striking out after completion of work as per specification and direction.
QUALITY TESTING REPORT
Display Board
ADD CGST 9%
ADD SGST 9%
ADD LABOUR CESS 1%
Please Enable Macros to View BoQ information
stage.html
html • 0.04 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.44 MB
Tendernotice_2.pdf
PDF • 0.30 MB
BOQ_2476503.xls
BOQ • 0.33 MB
Download all tender documents and submit your bid