Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹1.5 CrAccepted-Finance | ₹1.5 Cr | L1 | Accepted-Finance L1 |
| 2 | L2₹1.7 Cr+₹19.7 L (12.9%)Rejected-Finance CIVIL LINE THANA KOTWALI DISTRICT BASTI | GONDA | UTTAR PRADESH | 271305 | ₹1.7 Cr+₹19.7 L (12.9%) | L2 | Rejected-Finance L2 |
| 3 | L3₹1.7 Cr+₹20.7 L (13.6%)Rejected-Finance | ₹1.7 Cr+₹20.7 L (13.6%) | L3 | Rejected-Finance L3 |
| 4 | L4₹1.8 Cr+₹23.8 L (15.6%)Rejected-Finance | ₹1.8 Cr+₹23.8 L (15.6%) | L4 | Rejected-Finance L4 |
| 5 | Rejected-Technical VILLAGE AND POST PIPRA GAUTAM TEHSIL AND DISTRICT BASTI UTTAR PRADESH | GONDA | UTTAR PRADESH | 271305 | - | - | Rejected-Technical As per Uploaded |
| Sl No | Description | Qty | Unit | M/S PRAKASH CONSTRUCTION L3 | M/S AJAY CONSTRUCTION COMPANY L1 | M/S BHAGWATI TRADERS L2 | DILIP KUMAR YADAV L4 |
|---|---|---|---|---|---|---|---|
| 1.00 | Dry earth work in excavation of foundation including lead upto 30 m & lift upto 1.50 m and its disposal in all type of soil required for proper completion of the work above 10 cumec discharge. | 2,509.74 | M3 | 90 ₹2,25,876.6 | 75 ₹1,88,230.5 | 81.22 ₹2,03,841.08 | 40 ₹1,00,389.6 Lowest |
| 2.00 | Centering and shuttering work for PCC in foundation /C.C work including cost of all materials, labour and T&P etc. required for proper completion of the work. | 2,136.86 | M2 | 200 ₹4,27,372 | 100 ₹2,13,686 Lowest | 151.11 ₹3,22,900.91 | 190 ₹4,06,003.4 |
| 3.00 | Laying P.C.C in 1:3:6 (A40 M10) with 20 mm to 40mm size Dala crushed stone grit and Chopan coarse sand having F.M not less than 2.0 etc. including cost of all material, labour and T&P etc. required for proper completion of the work. | 188.2 | M3 | 8,800 ₹16,56,160 | 8,000 ₹15,05,600 | 8,801.17 ₹16,56,380.19 | 6,900 ₹12,98,580 Lowest |
| 4.00 | Laying C.C. 1:2:4 (A20 M15) with 4.75 mm to 20 mm size Dala crushed stone grit and Chopan coarse sand having F.M not less than 2.0 etc. including cost of all material, labour and T&P etc. required for proper completion of the work. | 1,156.41 | M3 | 9,900 ₹1,14,48,459 | 9,000 ₹1,04,07,690 | 9,902.17 ₹1,14,50,968.41 | 7,900 ₹91,35,639 Lowest |
| 5.00 | Making subgrade for lining work including watering, compaction and prepration of surface, labour and T&P etc. required for proper completion of the work. | 4,354.98 | M2 | 20 ₹87,099.6 | 15 ₹65,324.7 | 11.01 ₹47,948.33 Lowest | 498 ₹21,68,780.04 |
| 6.00 | supplying & laying of local sand in bed & side slope of canal including cost of all material, labour and T&P etc. required for proper completion of the work. | 803.43 | M3 | 1,200 ₹9,64,116 | 900 ₹7,23,087 Lowest | 1,318.99 ₹10,59,716.14 | 2,498 ₹20,06,968.14 |
| 7.00 | supplying & laying LDPE film 200 micron thick (1st grade) including cost of all material, contractor profit, labour and T&P etc. required for proper completion of the work. | 4,354.98 | M2 | 30 ₹1,30,649.4 | 25 ₹1,08,874.5 Lowest | 34.89 ₹1,51,945.25 | 110 ₹4,79,047.8 |
| 8.00 | supplying & pitching of Mirzapur quarry stone boulder 40 to 60 kg at site of work including cost of boulder, carriage up to site, loading, unloading, stacking T&P etc complete in all respect. | 576.68 | M3 | 4,100 ₹23,64,388 | 3,500 ₹20,18,380 Lowest | 3,999.36 ₹23,06,350.92 | 3,500 ₹20,18,380 Lowest |
Tender Value
₹2.0 Cr
EMD Value
₹4.0 L
Closing Date
20 Aug 2026, 3:00 pmClosed
S.E, Irrigation Construction Circle, Basti
S.E, Irrigation Construction Circle, Basti
Protection work of constructed Bridges on Khalilabad branch between km 44.800 to km 51.060 in District Santkabirnagar.
2026_UPIDC_1175065_3
01/S.E/2026-27
Open Tender
Civil Works
Item Wise
180 days
Khalilabad
Please refer Tender documents.
2 documents required · 2 mandatory
₹4,377
₹4.0 L
8 Sept 2026
11 Aug 2026
20 Aug 2026
11 Aug 2026
20 Aug 2026
11 Aug 2026
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Dry earth work in excavation of foundation including lead upto 30 m & lift upto 1.50 m and its disposal in all type of soil required for proper completion of the work above 10 cumec discharge. | 2,509.74 | M3 | - | - |
| 2 | Centering and shuttering work for PCC in foundation /C.C work including cost of all materials, labour and T&P etc. required for proper completion of the work. | 2,136.86 | M2 | - | - |
| 3 | Laying P.C.C in 1:3:6 (A40 M10) with 20 mm to 40mm size Dala crushed stone grit and Chopan coarse sand having F.M not less than 2.0 etc. including cost of all material, labour and T&P etc. required for proper completion of the work. | 188.2 | M3 | - | - |
| 4 | Laying C.C. 1:2:4 (A20 M15) with 4.75 mm to 20 mm size Dala crushed stone grit and Chopan coarse sand having F.M not less than 2.0 etc. including cost of all material, labour and T&P etc. required for proper completion of the work. | 1,156.41 | M3 | - | - |
| 5 | Making subgrade for lining work including watering, compaction and prepration of surface, labour and T&P etc. required for proper completion of the work. | 4,354.98 | M2 | - | - |
| 6 | supplying & laying of local sand in bed & side slope of canal including cost of all material, labour and T&P etc. required for proper completion of the work. | 803.43 | M3 | - | - |
| 7 | supplying & laying LDPE film 200 micron thick (1st grade) including cost of all material, contractor profit, labour and T&P etc. required for proper completion of the work. | 4,354.98 | M2 | - | - |
| 8 | supplying & pitching of Mirzapur quarry stone boulder 40 to 60 kg at site of work including cost of boulder, carriage up to site, loading, unloading, stacking T&P etc complete in all respect. | 576.68 | M3 | - | - |
stage.html
html • 0.04 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 2.24 MB
BOQ_2208493.xls
BOQ • 0.27 MB
Lot2345ok.pdf
Tender Documents • 2.75 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .