Tender Value
₹3 L
EMD Value
₹3,000
Closing Date
7 Sept 2026, 3:00 pm
Block development office, VP, Kuruvikulam
Block development office, VP, Kuruvikulam
BDOKRM/309/2026-B2 / SBMG 26-27 / Construction of New Plastic Waste Storage Shed in K.Alankulam Village and Panchayat in Kuruvikulam Panchayat Union
2026_RDTN_697392_1
BDOKRM/309/2026-B2
Open Tender
Civil Works
Works
Kuruvikulam
Please refer Tender documents.
6 documents required · 6 mandatory
₹0
₹3,000
Yes
24 Aug 2026
24 Aug 2026
8 Sept 2026
24 Aug 2026
7 Sept 2026
24 Aug 2026
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | New Plastic Waste Storage Shed at K.Alankulam Panchayat | - | - | - | - |
| 2 | Earthwork excavation in all classes of Soils and Sub soils except hard rock requiring 1 blasting including initial lead and lift, dressing the excavation upto bed level for Foundation as SS 20 B specification etc., complete | 3.76 | Cum | 263.78 | ₹991.81 |
| 3 | Supplying and filling with filling sand in layers not more than 15 cm thick including labour charges for Filling, Levelling, watering, well rammed and compacted etc., complete | 4.66 | Cum | 1,807.51 | ₹8,423 |
| 4 | Supplying and erection Centering for sides and soffits inculding necessary supports and structing for plain surfaces such as RCC Slab, Lintel, Beam, Column, Sunshade including cost and coveyance of all materials to site and all other incidental charges etc complete Concrete surfaces. | 5.73 | Cum | 547.5 | ₹3,137.18 |
| 5 | Cement concrete 1:4:8 mix using 40mm ISS HBGS metal laid in layers not more than 15cm thick inculding cost and coveyance of all materials to site, labour charges for mixing,laying,compacting and curing etc complete., For Foundation Base Concrete | 7.8 | Cum | 5,441.26 | ₹42,441.83 |
| 6 | Cement concrete 1:3:6 mix using 20mm ISS HBGS metal laid in layers not more than 15cm thick inculding cost and coveyance of all materials to site, labour charges for mixing,laying,compacting and curing etc complete., For Foundation Base Concrete | 0.4 | Sqm | 6,192.71 | ₹2,477.08 |
| 7 | Brick work with cement mortar 1:5 mix using Country bricks for Foundation, Basement and Superstructure inculding cost and conveyance of all materials to site, labour charges for curing and other incidental charges etc,complete. (Bricks Size -8 3/4" x 41/4" x 23/4") | 2.09 | Sqm | 6,134.91 | ₹12,821.96 |
| 9 | Plastering with Cement Morter 1:5 mix, 12mm thick Smooth finish for Brick, RR 7 masonry surface and other Concrete surfaces inculding cost and conveyance of all materials to site and all other labour charges, incidental charges etc., complete | 30.91 | Sqm | 283.36 | ₹8,758.66 |
| 10 | Paving the floor with kota stone slab of size 600 x 600 of 18/20mm (unpolished) in all floors laid in of cement mortor 1:3 20mm thickand pointed with colour cement neatly including polishing with polishing stone and oxalic acid etc., so as to perfectly smooth and glossy and including hire charges for polishing machine and power consumption charges etc. The Kota stone slabs and other materials to be used shall be got approved by the Executive Engineer concerned before use on work, etc., ccomplete as per standard specifications. | 18 | Sqm | 1,948.6 | ₹35,074.8 |
| 11 | Cement concrete 1:2:4 mix using 20mm ISS HBGS metal laid in layers not more than 15cm thick inculding cost and coveyance of all materials to site, labour charges for mixing,laying.compacting and curing etc complete., For Foundation - Base Concrete | 2.24 | Sqm | 6,733.51 | ₹15,083.06 |
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 3.18 MB
Tendernotice_2.pdf
PDF • 1.47 MB
BOQ_838398.xls
BOQ • 0.28 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at [email protected].