Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹2.5 LAccepted-AOC | ₹2.5 L | L1 | Accepted-AOC L1 |
| 2 | L2₹2.9 L+₹41,652 (16.5%)Rejected-Finance | ₹2.9 L+₹41,652 (16.5%) | L2 | Rejected-Finance L2 |
| 3 | L3₹3.0 L+₹43,140 (17.1%)Rejected-Finance | ₹3.0 L+₹43,140 (17.1%) | L3 | Rejected-Finance L2 |
Tender Value
₹3.0 L
EMD Value
₹29,751
Closing Date
25 Mar 2026, 3:00 pmClosed
c.e office
c. eoffice kanpur nagar nigam motijheel
zone-01 ward-32 ke antaragt RaiPurwa thana ke samane C.C Dwara Farsh Ka Sudhar Karya
2026_NNKAN_1128342_1
167/AA-1/2025-26
Open Tender
Civil Works
Fixed-rate
kanpur
Please refer Tender documents.
2 documents required · 2 mandatory
₹590
₹29,751
Yes
4 Aug 2026
20 Mar 2026
25 Mar 2026
20 Mar 2026
25 Mar 2026
20 Mar 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1.01 | Dismentling of damage ec including racking dismental material within 60m distence esc all | - | sqm | - | - |
| 1.02 | Construction of gullar suh base (GSB) on all comp | - | cum | - | - |
| 1.03 | construction of gully pit as per kan deig 75 Jetic all comp | - | nos | - | - |
| 1.04 | M-150 btw w 14 comer & Cand mortare all comp Super sttrac | - | cum | - | - |
| 1.05 | Cartage of earth and dismental mural poincluding trading unloading oc al comp | - | cum | - | - |
| 1.06 | providing and laying in position machine best and machine mis design M-25 grade cement concrete for rainforest coment onterete work using cement contents per approved design mis including pumping of conscre to site of laying but including loading the cast of camtring shuttering finishing and reinforcement Finchading and misture in recommended propagation as per IS 9103 to escalate nated setting of concrete improve work impuring strength and durabilities as per directison of engineer in charge (note,-coment comment consider in this item is 330 kg per cubic meter. Excess/less oment used as per design mis is payable recoverable separately)all comp | - | sqm | - | - |
| 1.13 | 18@GST | - | Tax | - | - |
stage.html
html • 0.04 MB
tech_eval.pdf
fin_eval.pdf
aoc.pdf
finance_2104475.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 1.76 MB
BOQ_2104475.xls
BOQ • 0.27 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .