| # | Company | Quoted % | Amount | Rank | Status |
|---|---|---|---|---|---|
| 1 | L1₹6.0 CrAdmitted-Finance | +9.85% | ₹6.0 Cr | L1 | Admitted-Finance |
| 2 | Rejected-Technical 1849 JUGRAJPUR SACHENDI KANPUR KANPUR NAGAR UTTAR PRADESH 208023 UDYAM UP 43 0012110 | KANPUR NAGAR | UTTAR PRADESH | 208023 | - | - | - | Rejected-Technical not Responsive due to PQ criteria Point no 02,PQ criteria Point no 3(1)PQ criteria Point no 3(c)PQ criteria Point no 3(iii) |
| 3 | Rejected-Technical | - | - | - | Rejected-Technical not Responsive due to PQ criteria Point no 02 |
| 4 | Rejected-Technical | - | - | - | Rejected-Technical not Responsive due to PQ criteria Point no 02 |
Tender Value
₹5.4 Cr
EMD Value
₹10.9 L
Closing Date
23 Feb 2026, 6:00 pmClosed
ADDITIONAL CHIEF ENGINEER,WATER RESOURCES ZONE, U
ADDITIONAL CHIEF ENGINEER,WATER RESOURCES ZONE, UDAIPUR
CONSTRUCTION WORK OF NAGDI FEEDER FROM BHUWAR BAWDI ANICUT G.P. SARSIYA, TEHSIL - JAHAZPUR
2026_WRDAS_534645_1
NIT-14/25-26/ACE-1157/WRDI/BHL
Open Tender
Civil Works
Percentage
545 days
JAHAZPUR
Please refer Tender documents.
3 documents required · 3 mandatory
₹10,000
Payment accept only e-grass
₹10.9 L
Yes
ADDITIONAL CHIEF ENGINEER,WATER RESOURCES ZONE, U
19 Mar 2026
4 Feb 2026
24 Feb 2026
4 Feb 2026
23 Feb 2026
4 Feb 2026
13 Feb 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Cutting & clearance of jungle, bushes, shrubs Ankra/Ipomoea, Juliflora typna etc. on canal and bunds in dry/moist/slushy conditions including disposal as per instructions of the Engineer-in-charge. Cost of wood has been deducted from rates and thus will be property of contractor after cutting. Thick | - | Sqm | 2.5 | - |
| 2 | Demolishing stone rubble masonry including stacking of usable material and disposal of unuseable material within 50 meters lead inclusive of de-watering wherever required.In cement mortar
The rates given are for dismantling of good quality work. For dismantling poor quality or weathered ; weakened work the rates will be reduced by 30% | - | Cum | 403.76 | - |
| 3 | Excavation including loading, unloading, disposal and dressing of excavated earth within initial lead of 50m and lift up to 1.5m including dressing of excavated area and dewatering wherever required complete in all respect.
Hard soil mixed with Kankar / boulders, Morrum | 1 | Cum | 119 | ₹118.88 |
| 4 | Excavation including loading unloading disposal and dressing of excavated rock within initial lead of 50m and lift upto 1.5m in dry or moist including dressing of excavated area, de-watering wherever required complete in all respect. Soft / Disintegrated rock | 1 | Cum | 161 | ₹160.84 |
| 5 | Hard rock not requiring blasting | - | Cum | 242 | - |
| 6 | Phylite & other Rock requiring nominal blasting | - | Cum | 346 | - |
| 7 | Hard rock (dry or moist) requiring blasting (where hardness of rock is more than 2) including disposal of excavated material in the designated spoil bank / embankment, dressing of excavated material and dewatering with all leads & lifts of excavation and disposal. The contractor is free to use the usable excavated stone else where for which any transition expenditure & royalties, tax etc if required to be paid then it will be liability of contractor as the cost of usable stone has already been deducted from the rate. | - | Cum | 467 | - |
| 8 | Add extra over item No.1 to 8 for disposal of excavated material abovei initial lift of 1.5 m and for every additional lift of 1.5 m or part there of including loading and un- loading wherever required
Add extra for over all depth of excavation above 1.5m and upto 3m | 0.29 | Cum | 8.5 | ₹2.47 |
| 9 | Extra lead over item no 1 to 8 of excavated material Extra lead over item no 1 to 8 of excavated material Beyond initial lead of 50 m & upto 250 m | 1 | Cum | 9.5 | ₹9.49 |
| 10 | Extra lead over item no 1 to 8 of excavated material Add extra over item 10 (a) for lead beyond 250m & upto 750m (for average 1/2Km). | 1 | Cum | 8.75 | ₹8.74 |
stage.html
html • 0.03 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 6.25 MB
BOQ_952702.xls
BOQ • 0.31 MB
TSBuwarbavri.pdf
Tender Documents • 4.31 MB
FSBuwarBavri.pdf
Tender Documents • 4.60 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .