Loading…
Tenderkart now works inside Claude and ChatGPT: search and analyse tenders right from your chat
Loading…
Tender ID
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
| # | Company | Status |
|---|---|---|
| 1 | Admitted-Fee/PreQual/Technical/Finance | Admitted-Fee/PreQual/Technical/Finance |
| 2 | Admitted-Fee/PreQual/Technical/Finance | Admitted-Fee/PreQual/Technical/Finance |
| 3 | Admitted-Fee/PreQual/Technical/Finance | Admitted-Fee/PreQual/Technical/Finance |
Tender Value
₹4.5 L
Closing Date
14 Apr 2022, 4:00 pmClosed
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
Executive Engineer
Mini Sectt Bandipore
Annual Maintenance of Chuntimullah Khul, Pir Khul, War Khul and other allied minor/ Zamindari canals of Irrigation Sub-Division Bandipore for the year 2022-2023 phase 1st
2022_IFC_166192_4
E-NIT No 01 of 2022-2023
Open Tender
Civil Works
Item Rate
10 days
Bandipore
Please refer Tender documents.
2 documents required · 2 mandatory
₹0
Exempted
15 Apr 2022
8 Apr 2022
15 Apr 2022
8 Apr 2022
14 Apr 2022
8 Apr 2022
120 days
Amount
Earth work in bulk excavation by manual means over areas (exceeding 30 cm in depth, 1.5 m in width as well as 10 m2 on plan) including disposal of excavated earth lead upto 50 meters and lift upto 1.5 m, as directed by Engineer-in-Charge. All kinds of soil.
Earth work in bulk excavation by mechanical means (hydraulic excavator) over areas (exceeding 30 cm in depth, 1.5 m in width as well as 10 m2 on plan) including disposal of excavated earth lead upto 50 meters and lift upto 1.5 m, as directed by Engineer-in-Charge. All kinds of soil.
Earth work in excavation by manual means in trenches for foundations, drains, pipes, cables etc. (not exceeding 1.5 m in width) and for shafts, wells, cesspits and the like not exceeding 10 sqm on plan, including dressing of sides and ramming of bottoms lift upto 1.5 m, including getting out excavated earth and disposal of surplus excavated earth as directed: All kinds of soil
Earth work in excavation by mechanical means (hydraulic excavator) in trenches for foundations, drains, pipes, cables etc. (not exceeding 1.5 m in width) and for shafts, wells, cesspits and the like not exceeding 10 sqm on plan, including dressing of sides and ramming of bottoms lift upto 1.5 m, including getting out excavated earth and disposal of surplus excavated earth as directed, within a lead of 50 metres: All kinds of soil
Earth work in rough excavation, banking excavated earth in layers not exceeding 20 cm in depth, breaking clods, watering, rolling each layer with 1/2 tonne roller or wooden or steel rammers, and rolling every 3rd and top-most layer with power roller of minimum 8 tonnes and dressing up in embankments for roads, flood banks, marginal banks and guide banks or filling up ground depressions, lead upto 50 m and lift upto 1.5 m in all kinds of soil.
Banking excavated earth in layers not exceeding 20cm in depth, breaking clods, watering, rolling each layer with 1/2 tonne roller, or wooden or steel rammers, and rolling every 3rd and top-most layer with power roller of minimum 8 tonnes and dressing up, in embankments for roads, flood banks, marginal banks, and guide banks etc., lead upto 50 m and lift upto 1.5 m in All kinds of soil.
Extra for every additional lift of 1.5 m or part thereof in excavation/banking excavated or stacked material : All kinds of soil.
Filling available excavated earth (excluding rock) in trenches, plinth, sides of foundations etc. in layers not exceeding 20 cm in depth, consolidating each deposited layer by ramming and watering, lead upto 50 m and lift upto 1.5 m.
Providing and laying in position cement concrete of specified grade including curing but excluding the cost of centring and shuttering. All work upto plinth level with: 1:4:8 (1 cement : 4 coarse sand : 8 graded stone aggregate 40 mm nominal size)
Providing and laying in position cement concrete of specified grade including curing but excluding the cost of centring and shuttering. All work upto plinth level with 1:3:6 (1 cement : 3 coarse sand : 6 graded stone aggregate 20 mm nominal size)
Providing and laying in position cement concrete of specified grade including curing but excluding the cost of centring and shuttering. All work upto plinth level with: 1:2:4 (1 cement : 2 coarse sand : 4 graded stone aggregate 20 mm nominal size)
Providing and laying in position specified grade of reinforced cement concrete including curing but excluding the cost of centering, shuttering, finishing and reinforcement. All works upto plinth level :-1:2:4 (1 cement : 2 coarse sand : 4 graded stone aggregate 20 mm nominal size)
Providing and laying in position specified grade of reinforced cement concrete including curing but excluding the cost of centering, shuttering, finishing and reinforcement. All works upto plinth level 1:1½:3 (1 cement : 1½ coarse sand : 3 graded stone aggregate 20 mm nominal size)
Filling / Hand-packing stones in wire-crates; excluding cost of crates and stones (Wire crates shall be supplied by department if available and cost shall be deducted as per the prevailing stock rates)
Providing , laying and placing in position (dry and water) poly cement bags(EC Bag) filled with earth / sand inclusive of all leads, lifts & carriage ( Mechanical / Manual ) which ever shall involve and including cost of E.C bags, supply of earth / sand , sewing complete job (EC Bags shall be supplied by department if available and cost shall be deducted as per the prevailing stock rates)
Providing , laying and placing in position (dry and water) poly cement bags (mega bag) filled with earth / sand inclusive of all leads, lifts & carriage ( Mechanical / Manual ) which ever shall involve and including cost of Mega bags, supply of earth / sand , sewing complete job (Mega shall be supplied by department if available and cost shall be deducted as per the prevailing stock rates)
Providing , laying and placing in position (dry and water) poly cement bags (Geo bag) filled with earth / sand inclusive of all leads, lifts & carriage ( Mechanical / Manual ) which ever shall involve and including cost of Geo bags, supply of earth / sand , sewing complete job (Geo Bags shall be supplied by department if available and cost shall be deducted as per the prevailing stock rates)
Dumping stone excluding cost of stones. In Horizontal on level
Supply of boulders / stones of required charge excluding carriage and head load. Nallah
Supply of stones excluding carriage and head load. Quarry
Steel reinforcement for R.C.C. work including straightening, cutting, bending, placing in position and binding all complete upto plinth level Thermo-Mechanically Treated bars of grade Fe-500D or more.
Centering and shuttering including strutting, propping etc. and removal of form for: Foundations, footings, bases of columns etc. for mass concrete.
Walls (any thickness) including attached pilasters, buttresses, plinth and string courses etc
Suspended floors, roofs, landings, balconies and access platforms.
Edges of slabs and breaks in floors and walls Under 20 cm wide
Slip clearance in soils mixed with moorum/ kankar/ shingle /boulders disposal lead upto 50 m and lift upto 1.5 m
Slip clearance In ordinary soils disposal lead upto 50 m and lift upto 1.5 m
Dry stone pitching (any thickness) excluding cost of stones.On Horizontal
Dry stone pitching (any thickness) excluding cost of stones.On Slopes
Opening out old wire crates those and re-binding after filling.
Silt clearance from canals. Inclusive of initial lead and lift ( 50m & 1.5m respectively )Dry
Shingle clearance from canals
Demolishing cement concrete manually/by mechanical means including disposal of material within 50 meters lead as per direction of Engineer-in charge:1:3:6 or richer mix (i/c equivalent design mix)
Cement concrete flooring 1:2:4 (1cement: 2 coarse sand: 4 graded stone aggregate) finished with a floating coat of neat cement including cement slurry and curing complete, but excluding the cost of nosing of steps etc. complete 50 mm thick with 20mm nominal size stone aggregate.
Random Rubble masonry with hard stone in foundation and plinth including leveling up with cement concrete 1:6:12 (1 Cement : 6 coarse sand : 12 graded stone aggregate 20mm nominal size) upto plinth level and curing complete with: Cement mortar 1:6 (1 Cement : 6 coarse sand): Quarry
Nallah
Dry random rubble masonry with hard stone in foundation and plinth: Quarry
Nallah
Open timbering over areas including strutting, shoring etc. complete (Measurements to be taken of the face area timbered): Depth not exceeding 1.5 m.
Depth exceeding 1.5 m but not exceeding 3 m
Clearing jungle including uprooting of rank vegetation, grass, brush wood, trees and saplings of girth upto 30 cm measured at a height of 1 m above ground level and removal of rubbish upto a distance of 50 m outside the periphery of the area cleared. (100 sqm)
Removal of unhygienic materials (so classified by the site engineer) from designated sites and its disposal as per directions, all inclusive.
Engagement of labour / Beldar, Mazdoor
Fitter (only in case department Gange is not available)
Blacksmith IInd Class
Mason
Carpenter
Hire charges of J.C.B including fuel, driver and Crawling charges etc complete job
Hire charges of Chain Mounted Earth moving equipment LNT etc including fuel ,driver and Crawling charges etc complete job
Felling trees of the girth (measured at a height of 1 m above ground level) including cutting of trunk and branches, removing the roots and stacking of serviceable material and disposal of unserviceable material. Beyond 30cm girth upto and including 60cm girth.
Beyond 60cm girth upto and including 120cm girth
Providing wood work in frames of false ceiling, partitions etc sawn and fixed in position (Poplar wood)
Providing and Laying PVC Polythene of special quality
Providing and Laying PVC Pipe Of approved brand and quality: 250 mm
Providing and laying non-pressure NP2 class (light duty) R.C.C. pipes with collars jointed with stiff mixture of cement mortar in the proportion of 1:2 (1 cement: 2 fine sand) including testing of joints etc. complete 600mm
Providing and laying in position precoated galvanised iron profile sheet 0.50 mm TCT, as per the directions of materials by Mechanical Transport
Carraige of materials by Mechanical transport. Silt/Slip/Shingle for an av lead of 01 km (beyond Ist 50 meters)
Beyond 5 Km upto 10 km /km
Beyond 10 Km upto 20 km /km
Beyond 20 km /every additional Km
Crates upto 1 km
Beyond 5 Km upto 10 km /km
Beyond 10 Km upto 20 km /km
Beyond 20 km /every additional Km
Stone upto 1 km
Beyond 5 Km upto 10 km /km
Beyond 10 Km upto 20 km /km
Beyond 20 km /every additional Km
40 mm Agregrate 1 Km
Beyond 5 Km upto 10 km /km
Beyond 10 Km upto 20 km /km
Beyond 20 km /every additional Km
20 mm Agregrate 1 Km
Beyond 5 Km upto 10 km /km
Beyond 10 Km upto 20 km /km
Beyond 20 km /every additional Km
Sand 1 km
Beyond 5 Km upto 10 km /km
Beyond 10 Km upto 20 km /km
Beyond 20 km /every additional Km
Cement / Steel for an av lead of 1 km
Beyond 5 Km upto 10 km /km
Beyond 10 Km upto 20 km /km
Beyond 20 km /every additional Km
RCC Spun pipes 600mm dia for an av lead of 1 km
Beyond 5 Km upto 10 km /km
Beyond 10 Km upto 20 km /km
Beyond 20 km /every additional Km
RCC Spun pipes 450mm dia for an av lead of 1 km
Beyond 5 Km upto 10 km /km
Beyond 10 Km upto 20 km /km
Beyond 20 km /every additional Km
RCC Spun pipes 300mm dia for an av lead of 1 km
Beyond 5 Km upto 10 km /km
Beyond 10 Km upto 20 km /km
Beyond 20 km /every additional Km
RCC Spun pipes 250mm dia for an av lead of 1 km
Beyond 5 Km upto 10 km /km
Beyond 10 Km upto 20 km /km
Beyond 20 km /every additional Km
Carraige of materials by Manual means. Silt/Slip/Shingle for Ist 50 mtrs (beyond Ist 50 meters)
for every additional 50 mtrs or part thereof beyond 1st 50m upto 0.5 km
Crates for first 50 mtrs.
for every additional 50 mtrs or part thereof beyond 1st 50m upto 0.5 km
Boulders / stones for first 50 mtrs.
for every additional 50 mtrs or part thereof beyond 1st 50m upto 0.5 km
R.C.C spun pipes: 600mm (For ist 50 metres)
for every additional 50 mtrs or part thereof beyond 1st 50m upto 0.5 km
R.C.C spun pipes: 450mm (For ist 50 metres)
for every additional 50 mtrs or part thereof beyond 1st 50m upto 0.5 km
R.C.C spun pipes: 300mm (For ist 50 metres)
for every additional 50 mtrs or part thereof beyond 1st 50m upto 0.5 km
R.C.C spun pipes: 250mm (For ist 50 metres)
for every additional 50 mtrs or part thereof beyond 1st 50m upto 0.5 km
40mm aggregate (For ist 50 metres)
for every additional 50 mtrs or part thereof beyond 1st 50m upto 0.5 km
20mm aggregate/ Sand (For ist 50 metres)
for every additional 50 mtrs or part thereof beyond 1st 50m upto 0.5 km
Cement (For ist 50 metres)
for every additional 50 mtrs or part thereof beyond 1st 50m upto 0.5 km
Steel For First 50 Mtrs
for every additional 50 mtrs or part thereof beyond 1st 50m upto 0.5 km
MOHAMMAD AMIN SOFI
M/s Nayeem Hassan Bhat
stage.html
html • 0.02 MB
finance_385426.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .