| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | 1₹13.0 CrAccepted-AOC | ₹13.0 Cr Quoted ₹14.2 Cr | 1 | Accepted-AOC Lowest Negotiated Bidder |
| 2 | 2₹15.0 CrRejected-Finance | ₹15.0 Cr | 2 | Rejected-Finance Quoted amount is more. Not eligible for negotiation |
| 3 | 3₹15.5 CrRejected-Finance | ₹15.5 Cr | 3 | Rejected-Finance Quoted amount is more. Not eligible for negotiation |
Tender Value
₹12.4 Cr
EMD Value
₹6.3 L
Closing Date
27 Jul 2022, 11:30 amClosed
SE (H) C and M Chennai Circle
O/o the SE (H) C and M Chennai Chennai Teynampet Chennai-06
Construction of High level bridge at km 2/8 of Medavakkam Sholinganallur Kudimiyandithoppu Road (ELCOT)
2022_HWAY_240976_1
TN.17/2022-23 /TM SUB/ FLOOD MITIGATION_ELCOT
Open Tender
Civil Works - Highways
365 days
TAMBARAM
Please refer Tender documents.
15 documents required · 15 mandatory
₹0
₹6.3 L
SE (H) C and M Chennai Circle
28 Oct 2022
11 Jul 2022
29 Jul 2022
11 Jul 2022
27 Jul 2022
16 Jul 2022
11 Jul 2022 - 14 Jul 2022
14 Jul 2022
Amount
Dismantling the the existing PCC in the existing bridge and clearing away from the work site and carefully stacking the usefull materials for reuse on the road side as directed by the departmental officers including all labour and incidental charges etc., complete.
Dismantling the existing RCC in the existing bridge and clearing away from the work site and carefully stacking the useful materials for reuse on the road side as directed by the departmental officers including all labour and incidental charges etc., complete.
Earth work excavation in all classes of soil except hard rock requiring blasting and depositing on bank as per SS20B with all leads and lifts and all other incidental charges such as bailing out water shoring strutting, walling and forming protective bunds whereever necessary etc., complete as per relevent standard specification for DRESSING THE BED UPTO SILL LEVEL.
Earthwork excavation in all classes of soil except hard rock requiring blasting and depositing on bank with all leads and lifts as per SS20B, including cost of all labour, equipments and all incidential charges such as baling our water, providing and maintaining necessary cofferdams, sheeting, shoring bracing and their subsequent removal, removal of all logs, stumps, grubs and other deleterious matter and obstructions, trimming bottom of excavation backfilling, and clearing the site and disposal of all surplus materials etc., complete as per relevant standard specification for FOUNDATION OF ABUTMENTS PILECAP AND PIERS.
Providing and driving in position permanet M.S liner including cost and conveyance to the site and fabrication charges and tools and plants and driving M.S 6mm thick liner to be left peramnently with the pile shaft as per the requirement and as per the specifications and placing from the bottom with all leads and lifts using 6mm M.S sheet etc., complete.
Reinforced cement concrete cast-in-situ bored piles of 1200 mm diameter M-35 grade Design Mix using 20mm & below ISS size graded HBG metal with minimum cement content of 400kg per cu.m maximum water cement ratio of 0.4 and slump of 150 - 200mm by tremie concreting including cost and conveyance of all materials to site and cement at site excluding cost and fabrication of steel including placing of reinforcement in position, concreting, including all labour charges for driving or boring, mobilisation of piling equipment and other accesssories required for driving the pile, cost of Bentonite solution and the temporary liners, chiselling and including forming of working platform over the river bed for accommodating piling eqipments including working platform, cost of test piles both initial and routine test for vertical loads and horizontal loads, forming approaches to the working platform, mixing concrete, filling it in position, compacting, cutting of pile head to cut off level for the casting the pile caps, including diversion of water course if necessary and all other incidental charges tec., complete as per standard specifications etc., complete for PILES BELOW ABUTMENTS & PIERS.
Plain Cement Concrete M-15 grade ,Nominal mix 1:2:4 using 40mm below ISS graded metal including cost and conveyance of all materials to site including cement at site including cost of formwork, soft water, labour charges for mixing, transporting, laying and curing concrete, working at depths, Tools and Plants and incidental charges such as maintaining of protective bunds, cofferdams, shoring, strutting etc; complete as per relevant standard specification, etc, complete as per relevant standard specification for LEVELLING COURSE BELOW PILE CAP UNDER ABUTMENTS.
Vibrated reinforced cement concrete M35 grade Design Mix, using 20 mm & below ISS size hard granite broken graded metal including cost and conveyance of all materials to site and cement at site excluding cost and fabrication of steel but form work and centering soft water labour charges for mixing, transporting, placing in position, vibrating and compacting finishing and curing concrete, working at heights, hire charges for tools and plants, including all other incidental charges, etc., complete as per standard specifications for PILE CAPS UNDER ABUTMENTS, RETURN WALLS AND PIERS.
Vibrated reinforced cement concrete M-35 Grade, Design Mix, using 20 mm & below ISS size hard granite broken graded metal including cost and conveyance of all materials to site and cement at site excluding cost and fabrication of steel but form work and centering soft water labour charges for mixing, transporting, placing in position, vibrating and compacting finishing and curing concrete, working at heights, hire charges for tools and plants, including all other incidental charges, etc., complete as per standard specifications for ABUTMENTS AND RETURN WALLS.
Vibrated reinforced cement concrete M-35 Grade, Design Mix, using 20 mm & below ISS size hard granite broken graded metal including cost and conveyance of all materials to site and cement at site excluding cost and fabrication of steel but including form work and centering soft water labour charges for mixing, transporting, placing in position, vibrating and compacting finishing and curing concrete, working at heights, hire charges for tools and plants, including all other incidental charges, etc., complete as per standard specifications for BED BLOCK CUM DIRT WALL OVER ABUTMENTS.
Vibrated reinforced cement concrete M35 (Design mix) using 20mm & below ISS metal, including cost and conveyance of all materials to site and cost of cement at site,but excluding cost and fabrication of steel but including cost of formwork labour charges for mixing transporting,laying,curing concrete,working at heights,soft water,hire charges for tools and plants,including all oter incidental charges,etc., complete for PEDESTALS OVER CAPPING BEAMS AND BED BLOCKS.
Supply and fixing of Elastomeric bearing of size 600x700x143mm including cost and conveyance to work site, labour for fixing the same in correct position and all other incidental charges etc., complete as per standard specifications.
Vibrated reinforced cement concrete M-35, Grade, Design Mix using 20mm & below ISS size hard granite broken graded metal including cost and conveyance of all materials to site and cost of cement at site but excluding cost and fabrication of steel but including labour charges for mixing, transporting, laying, curing concrete, working at heights, potable water, hire charges for tools and plants, including all other incidental charges etc., complete as per relevant standard specification for T-BEAMS AND CROSS BEAMS.
Vibrated reinforced cement concrete M-35, Grade, Design Mix using 20mm & below ISS size hard granite broken graded metal including cost and conveyance of all materials to site and cement at site but excluding cost and fabrication of steel but including form work and centering soft water labour charges for mixing, transporting, placing in position, vibrating and compacting finishing and curing concrete, working at heights, hire charges for tools and plants, including all other incidental charges,including inspection chamber, inclusive of 150mm ducts and other accessories of footpath etc., complete for DECK SLAB.
Vibrated reinforced Concrete M-40, Grade, Design Mix, using 20mm & below ISS size hard granite broken graded metal including cost and conveyance of all materials to site including cement at site including labour charges for mixing, transporting, laying, and curing concrete,working at heights,hire charges for tools and plants,including all other incidental charges,etc, complete for CRASH BARRIER
Providing and fixing of Galvinised Iron drainage spouts 100mm dia as per MOST drawing SD/205 with grating arrangements at top as shown in the drawing using 12mm x 25mm flats for grating arrangements, and 100mm dia drainage spout projecting beyond the bottom of deck slab as shown in the drawing including cost and conveyance of cast iron pipes and flats and fixing them in position etc,complete.
Supplying and installation of STRIP SEAL EXPANSION joint system conforming to specifications for Road and Bridge Works-IV Revision; 2001 Published by Ministry of Surface Transport (Roads Wing) in the 40mm wide expansion gap provided in between decks over piers and in between deck and dirt wall over abutment with fatigue tested structural steel section at the nosing and anchorage assembly, including cost and conveyance of all materials, cost of testing as per the MOST specifications, including labour, equipment and incidental charges for fixing the joints complete in all respects, as per specifications.
Vibrated Cement Concrete M15, Grade, Nominal Mix, 1:2:4 using 40mm below ISS hard granite broken metal including cost and conveyance of all materials to site and cement at site including cost of formwork,lead for soft water, labour charges for mixing , transporting, laying, and curing concrete working in heights and hire charges for tools and plants, and all other incidental charges etc complete as per relevant specification for BASE COURSE BELOW APPROACH SLAB.
Vibrated Reinforced Cement Concrete M-30, Grade, Design Mix, using 20mm & below ISS graded hard granite broken metal including cost and conveyance of all materials to site including cement at site including labour charges for mixing, laying, curing concrete, working at heights,hire charges for tools and plants, including all other incidental chages etc., complete for APPROACH SLABS.
Providing and fixing seepage pipes of 100mm dia. PVC pipes of required lengths for abutments and wngs including cost and conveyance of all materials to work site, cost and labour for 900mm dia. semi-spherical back fill arrangements with 100mm size broken granite chips at the periphery and labour charges for fixing, etc.,to drain of the backfill IN THE ABUTMENTS AND WINGS, -
Providing filter media behind the abutments and wings with clean III graded material 53mm to 5.6mm to 600mm thick and well compacted in layers with smaller sized towards the soil and bigger size towards the wall including cost and conveyance to work site including all labours and other incidental charges including hire charges for tools and plants employed etc., for filter media as per MOST's (Roads Wing) specifications for Roads and Bridges " Fourth Revision Cl. 309-3-2-B and 305 -4-4 etc., complete.
Filling behind Abutments and wings as per Appendix 6 of IRC: 78-2000 with clean gritty free draining gravel including cost and draining gravel having Ø value more than 35° conveyance of gravel to worksite, laying, handling charges and filling in layers tamping under optimum moisture content to get the maximum density, including watering, with all leads and lifts for water and all other incidental charges, etc., complete.
Supply and Fabrication of HCRM STEEL OF with Grade Designation Fe-500D, WITH SUITABLE ANTICORROSIVE MEASURE conforming to IS:1786-1985, steel required for all RCC items of works involved in the schedule cost of steel at site fabrication, labour charges for cleaning the rods straightening, cutting, bending, tying grills, including overlaping to the required length wherever necessary and placing the reinforcement in position as specified in the drawings, including cost of binding wire, provision of spacer bars, cover blocks and all other incidental charges etc, complete,Fe-500D grade.
Supply and fabrication of S-240 steel required for all RCC items of works involved in the schedule cost of steel at site fabrication,labour charges for cleaning the rods straightening, cutting, bending, tying grills, including overlapping to the required length whenever necessary and placing the reinforcement in position as specified in the drawings,including cost of binding wire, provision of spacer bars, cover blocks and all other incidental charges etc,complete, S-240 grade
Sub Total Bid Price (in figures)
GST @ 12% of above all Schedules (in figures)
Sree Venkateswara Constructions
S.P.Builders
stage.html
html • 0.04 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.04 MB
Download all tender documents and submit your bid