| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹1.5 CrAccepted-AOC | ₹1.5 Cr | L1 | Accepted-AOC L1 |
| 2 | L2₹1.6 CrRejected-AOC EAST CROSS STREET AT 67 M LENGTH IN VEERAGANU VEERAGANUR TOWN PANCHAYAT SALEM DISTRICT | ₹1.6 Cr | L2 | Rejected-AOC L2 |
| Sl No | Description | Qty | Unit | SRI AMMAN ASSOCIATES L1 | SRI AMMAN CONSTRUCTIONS L2 |
|---|---|---|---|---|---|
| 1.00Strengthening and Five Year Maintenance of the Road from Kurichi to Vellalapatty KM-0/0-2/800 H/O Kurichi Panchayat | |||||
| 2.00 | Clearing the Scrub jungle by uprooting including all cutting charges and disposing of the products and clearing as directed by the departmental officers including all incidental charges etc., complete. | 2,685.58 | Sqm | 6 ₹16,113.48 | 8 ₹21,484.64 |
| 3.00 | Picking 5 cm to 10 cm old metalled surface and sectioning - 1 sq.m | 3,503.17 | cum | 23 ₹80,572.91 | 25 ₹87,579.25 |
| 4.00 | Earth work excavation in all classes of soils except hard rock requiring blasting depositing on bank with initial lead of 10M and lift of 2M including all labour charges and incidental charges such as shoring, strutting, providing coffer dams, bailing out of water as per 20A | 377.22 | cum | 145 ₹54,696.90 | 150 ₹56,583 |
| 5.00 | Collection and supply of gritty gravel from appd quarry including cost and conveyance of all materials to site including all labour charges for spreading and compaction with power roller etc.complete, for SHOULDERS | 784.24 | cum | 341 ₹2.7 L | 350 ₹2.7 L |
| 6.00 | Providing and laying spreading and compacting graded stone aggregate to Wet Mix Macadam(WMM) specification including premixing the material with water at OMC in machanical mix plant carriage of mixed material by tipper to site laying in uniform layers 250mm thick with pavers in SubBase/Base course on well prepared surface and compacting with vibratory roller to achieve the desired density including cost of material,labour charges, rentals for machinery, fuel and all other incidental charges etc., complete. KM 0/0 - 1/0 | 565.56 | cum | 2,657 ₹15.0 L | 2,750 ₹15.6 L |
| 7.00 | KM 1/0 - 2/00 | 562.5 | cum | 2,657 ₹14.9 L | 2,750 ₹15.5 L |
| 8.00 | KM 2/0 - 2/80 | 448.37 | cum | 2,657 ₹11.9 L | 2,750 ₹12.3 L |
| 9.00 | Applying PRIMECOAT over WMB/ WMM surface at 7.00Kg of SS-1 Bitumen Emulsion / 10 sq.m including labour for spraying, hire charges for bitumen sprayer etc. Comp. KM 0/0 - 1/0 | 3,770.37 | Sqm | 87 ₹3.3 L | 90 ₹3.4 L |
| 10.00 | KM 1/0 - 2/00 | 3,750 | Sqm | 87 ₹3.3 L | 90 ₹3.4 L |
Tender Value
₹1.6 Cr
EMD Value
₹1.6 L
Closing Date
20 Feb 2026, 3:00 pmClosed
Joint Director/Project Director
DRDA,Salem
Salem District - Valapady Block - Strengthening and Five Year Maintenance of the Road Kurichi to Vellalapatty - Kurichi Panchayat in NABARD - RIDF- 2026-2027 Package No.20
2026_RDTN_656804_17
Roc.No.875/2026/A3
Open Tender
Civil Works - Roads
180 days
DRDA
As per tender document
3 documents required · 3 mandatory
₹0
₹1.6 L
DRDA,Salem
29 May 2026
14 Feb 2026
20 Feb 2026
14 Feb 2026
20 Feb 2026
14 Feb 2026
16 Feb 2026
Strengthening and Five Year Maintenance of the Road from Kurichi to Vellalapatty KM-0/0-2/800 H/O Kurichi Panchayat
Clearing the Scrub jungle by uprooting including all cutting charges and disposing of the products and clearing as directed by the departmental officers including all incidental charges etc., complete.
Picking 5 cm to 10 cm old metalled surface and sectioning - 1 sq.m
Earth work excavation in all classes of soils except hard rock requiring blasting depositing on bank with initial lead of 10M and lift of 2M including all labour charges and incidental charges such as shoring, strutting, providing coffer dams, bailing out of water as per 20A
Collection and supply of gritty gravel from appd quarry including cost and conveyance of all materials to site including all labour charges for spreading and compaction with power roller etc.complete, for SHOULDERS
Providing and laying spreading and compacting graded stone aggregate to Wet Mix Macadam(WMM) specification including premixing the material with water at OMC in machanical mix plant carriage of mixed material by tipper to site laying in uniform layers 250mm thick with pavers in SubBase/Base course on well prepared surface and compacting with vibratory roller to achieve the desired density including cost of material,labour charges, rentals for machinery, fuel and all other incidental charges etc., complete. KM 0/0 - 1/0
Applying PRIMECOAT over WMB/ WMM surface at 7.00Kg of SS-1 Bitumen Emulsion / 10 sq.m including labour for spraying, hire charges for bitumen sprayer etc. Comp. KM 0/0 - 1/0
Applying TACK COAT over WBM surface at 2.5Kg / 10 sq.m including labour for spraying, hire charges for bitumen sprayer etc. Comp.KM 0/0 - 1/0
BITUMINOUS CONCRETE 25 MM THICK USING cmp (Grade-II) Providing and laying Bituminous Concrete to 25/30/40mm thick using 0.13 cum of 19.00- 9.50mm, 0.17 cum of 9.50-2.36mm and 0.26 cum of 2.36 and below with 50.30kgs of VG30 bitumen for premixing per 10sqm including cost and conveyance of all materials to CMP site, heating the bitumen and aggregate to required temperature and mixing them in required temperature in central hot mix plant 20-30 ton capacity, conveying the mix by tipper trucks to paver site, spreading the mix to uniform thickness of 40mm with mechanical paver to the specified grades and cross sections and consolidated by 8-10 tonne Vibratory to the required density etc., including labour for attending to paver to site etc., including hire charges and fuel charges for 20-30 t CMP with bitumen boiler, tipper trucks, Paver Finisher, Vibratory roller and all other tools and plant required, including fuel and all other incidental charges etc., complete as per specification using CMP as per clause 507 of MORTH Rev-5 KM 0/0 - 1/0
1.50m Span RCC Slab Culvert @ Ch 1000 - Earth work excavation & Depositing on bank with Initial lead of 10m and lift & 2m in hard stiff clay, stiff black cotton hard red earth shales, murram, gravel stoney earth and earth mixed with small size boulder and in hard gravelly soils per SS 20B etc, complete.
Cement concrete 1:4:8 mix using 40mm ISS metal including cost and conveyance of all materials to site and all labour charges for mixing, laying and curing etc complete
Cement concrete 1:3:6 mix using 40mm ISS metal including cost and conveyance of all materials to site and all labour charges for mixing, laying and curing etc complete
Cement concrete 1:2:4 mix using 20mm metal including cost and conveyance of all materials to site and all labour charges for mixing,laying and curing etc complete for 10 cum.
Supplying and erecting centering are strutting including neceassary supports for place surface for RCCcolumns fottings and pedestal beems crtitical pears erc., using mild steel angles of sizes 90x60x10cm gauge stiffness welded mild steel angles of sizes etc. Below & Above sill Level
Deck slab sides,Bedblock,Dirt wall etc.
Supplying and fabricating and placing inposition mild steel or Ribbed Tor Steel for all reinforced cement concrte works as per the design given incuding cost of steel and binding wire in all floor etc. complete complying with standard specification
Reinforced Cement concrete 1:1.5:3 mix using 20mm I SS size hard granite broken metal from approved quarry including cost and conveyance of all materials to site including cost of cement which will be supplied departmentally at the Departmental section store etc, complete.
Collection and supply of gritty gravel from appd quarry including cost and conveyance of all materials to site including all labour charges for filling etc.complete,
Provision for Bitumen Pad
Provision for Weep holes 4 '' pvc pipes
Drain KM 1/10 - 1/30 - Earth work Excavation for Foundation in all soils and Sub Soil to full depth as may be directed except in hard rock requiring blasting but inclusive of shoring strutting and requiring the sides of foundation.
Cement concrete 1:4:8 mix using 40mm ISS metal including cost and conveyance of all materials to site and all labour charges for mixing,laying and curing etc complete for 10 cum.
Supplying and erecting centering shuttering including necessary supports for plane surface in foundation and basement and in all floors for R C C column footing column plinth beam, beams, roof slabs, staircase steps, bed blocks, critical
Plain Cement Concrete 1:2:4 (one cement, two M.Sand and four hard broken stone jelly) using 20mm jelly for wearing coat including laying, compacting, finishing and curing, etc., complete as per standard specificatins and as directed by the departmental officers.
Plastering with Cement Mortar 1:5 (One cement and Five P.Sand), 12mm thick in all floors including curing etc. complete complying with standard specification and as directed by the departmental officers.
1.50m Span RCC Slab Culvert @ Ch 2300 -Dismantling clearing away and carefully stacking Material useful for re-use for any thickness of walls stone masonry mortar walls under 3m High
Dismantling clearing away and carefully stacking Material useful for re-use for any thickness of walls Removal of Cut Stone Slabs RCC Cover Slabs
Earth work excavation & Depositing on bank with Initial lead of 10m and lift & 2m in hard stiff clay, stiff black cotton hard red earth shales, murram, gravel stoney earth and earth mixed with small size boulder and in hard gravelly soils per SS 20B etc, complete.
Cement concrete 1:4:8 mix using 40mm ISS metal including cost and conveyance of all materials to site and all labour charges for mixing, laying and curing etc complete
Cement concrete 1:3:6 mix using 40mm ISS metal including cost and conveyance of all materials to site and all labour charges for mixing, laying and curing etc complete
Cement concrete 1:2:4 mix using 20mm metal including cost and conveyance of all materials to site and all labour charges for mixing,laying and curing etc complete for 10 cum.
Supplying and erecting centering are strutting including neceassary supports for place surface for RCCcolumns fottings and pedestal beems crtitical pears erc., using mild steel angles of sizes 90x60x10cm gauge stiffness welded mild steel angles of sizes etc. Below & Above sill Level
Deck slab sides,Bedblock,Dirt wall etc.
Supplying and fabricating and placing inposition mild steel or Ribbed Tor Steel for all reinforced cement concrte works as per the design given incuding cost of steel and binding wire in all floor etc. complete complying with standard specification
Reinforced Cement concrete 1:1.5:3 mix using 20mm I SS size hard granite broken metal from approved quarry including cost and conveyance of all materials to site including cost of cement which will be supplied departmentally at the Departmental section store etc, complete.
Collection and supply of gritty gravel from appd quarry including cost and conveyance of all materials to site including all labour charges for filling etc.complete,
Provision for Bitumen Pad
Provision for Weep holes 4 '' pvc pipes
Provision For Sign Board
Provision For KM Stone
Provision For HM Stone
Provision For Reflecctor
Towards the charges for routline maintenance of the road work executed under NABARD including dressing of berms by refilling the gully with the earth from borrow pits, cleaning of wild seasonal growth on berms, destilting of side drains and CD works, white washing guard stones, painting of KM, HM stones, parapets, cutting of branches of trees, refixing displaced guard stones, caution boards, speed limit boards etc., with the periodicity for the above activities as prescribed in IRC-SP-20:2002 and as directed by the departmental officers except for the constructional defects which has to be rectified by the contractor at his own cost for carriageway width of 3.00m & 3.75m
For the First Year from the date of completion of work
For the Second Year from the date of cpmpletion of work
For the Third Year from the date of completion of work
For the Fourth Year from the date of completion of work
For the Fifth Year from the date of completion of work
GST Amount for providing Service to Government Contract Works for the above Construction & Maintenance Works. { GST Amount is the Total GST Amount for overall quoted amount (Both Construction and Maintenance) above this row in column "BB" for all works in this package} (Refer Clause 13.2 & 13.3 of Section 2 of Instruction to Bidders (ITB) of SBD)
Please Enable Macros to View BoQ information
stage.html
html • 0.04 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.04 MB
Tendernotice_1.pdf
PDF • 0.15 MB
BOQ_788512.xls
BOQ • 0.30 MB
20.pdf
Tender Documents • 1.47 MB
Download all tender documents and submit your bid