| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | 1₹2.0 LAccepted-Finance NOT AVAILABLE | 1 | Accepted-Finance Found Eligible | |
| 2 | 2₹2.1 L+₹2,400 (1.18%)Accepted-Finance 110 MINI SHOPPING COMPLEX NEHRU MARKET JAMMU | 2 | Accepted-Finance Found Eligible | |
| 3 | 3₹2.1 L+₹3,100 (1.52%)Accepted-Finance BHAGWATI NAGAR JAMMU | 3 | Accepted-Finance Found Eligible |
Tender Value
₹2.1 L
EMD Value
₹4,157
Closing Date
20 Aug 2024, 2:00 pmClosed
Executive Engineer, MID Akhnoor/Nowshera
Office of Executive Engineer, MID Akhnoor/Nowshera
Repairs to 60 HP 3 phase induction motor no. 02 and 150 mm foot valve of pumping unit no. 02 at LIS Kah and Repair of 100 KVA Voltage stabilizer at LIS Bal.
2024_IFC_256000_1
MID/AN/61
Open Tender
Machineries/ Mechanical Engg Items
Item Wise
15 days
Kah, Bal
Please refer Tender documents.
7 documents required · 7 mandatory
₹200
Executive Engineer, MID Akhnoor/Nowshera
₹4,157
Yes
Office of Executive Engineer, MID Akhnoor/Nowshera
19 Oct 2024
9 Aug 2024
21 Aug 2024
9 Aug 2024
20 Aug 2024
12 Aug 2024
10 Aug 2024
Repair to 60 HP three phase induction motor no. 02 at LIS Kah.The job involves decoupling the motor from the HC pump and unfastening the foundation nuts and bolts by using suitable tools and tackles and labour. Lifting the motor out of pump house by using manual labour. Loading the motor in the vehicle and shifting the motor to the workshop . Unloading of the motor in the workshop .The job further involves dismantling of end covers, extraction of rotor from motor. Extraction of damaged winding from the stator. Cleaning of stator with compressed air and requisite chemical cleanser/CCL4. Complete rewinding by way of providing and fitting of new good quality winding wire of gauge and size (as per old sample) in the stator together with replacement of damaged /worn out wedges/strips and p/f of f-class insulation, Application of superior quality varnish (Red Becktol etc.) by spray impregnation process and drying the stator winding with hot air circulation process and thereafter checking the IR value. Re-assembling the motor after greasing. Shifting the motor to LIS . Fitting of the motor over the base frame by providing / fitting of nut bolts, washers etc., making of electrical connections, replacing worn out nuts, bolts for the electrical connection. Alignment & coupling with pump .Complete testing of the pumping unit. Job includes cost of all material, transportation charges, head load and labour charges for skilled / semi skilled labour, hire charges for tools & tackles at the LIS. Complete Job
Repairs to 150 mm foot valve assembly of pumping unit no.02 installed at LIS Kah. The job involves disconnecting / dismantling of the foot valve assembly from the suction pipe by deploying manual labour and allied tools & tackles. Shifting / transporting to the workshop. Cleaning by washing with water to make the foot valves completely silt free. After drying them completely. Dismantling of damaged foot valve mechanism. Fabrication of new flap plate as per the sample Providing / fitting of new leather washer cut as per size of the flap plate. Reassembling the foot valve and transporting back to the installation site at LIS. Fitting the valves to the respective suction line with replacement of damaged rubber gaskets of flanged joints and worn-out nuts, bolts etc. Complete job including cost of material, labour charges, transportation charges and hire charges for tools & tackles. Complete Job
Repairs to 100 KVA voltage stabilizer at LIS Bal . The job involves disconnecting of the Voltage stabilizer from the main power supply (Incoming and Outgoing cables). Loading the voltage stabilizer in the vehicle by using crane and suitable tools and tackle and shifting the voltage stabilizer to workshop. Opening and removing of the panel, loosening /dismantling of the top cover, nut and bolts. Lifting of inside transformer assembly with the chain pulley block for extraction of the complete unit. Dismantling/Extraction of the coils. Thereafter dismantling of the core assembly and extraction of the all burnt copper wire with the help of manual labour and suitable tools/tackles. Rewinding of Aluminium wire of the superior quality and then complete insulating and varnishing of coils. Assembling of the coils to make it a complete unit. Replacement of the rotor switch (3 no.) by way of p/f of new components, replacing all the damaged /burnt components. Filling of 200 litre T.oil in stablizer after heating of the T.oil. Reinstallation of the stabilizer frame with transformer assembly. Lowering of complete unit in tank after p/f of shock proof gasket and body with nuts/bolts. Shifting the voltage stabilizer to LIS and unloading of the voltage stabilizer at site by using crane Connecting power cables by p/f of new thimbles of the requisite capacity and testing on load . Complete job includes the cost of material, labour charges, transportation charges, hiring charges of tools/tackles required at site. Complete Job.
Rishabh Electricals and Mechanical Works
M/S FASTTRACK ENGINEERS
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .