| # | Company | Quoted % | Amount | Rank | Status |
|---|---|---|---|---|---|
| 1 | L1₹1.2 LAdmitted-Finance | L1 | Admitted-Finance | ||
| 2 | L2₹1.3 L+₹10,900.25 (9.08%)Admitted-Finance | L2 | Admitted-Finance | ||
| 3 | L3₹1.4 L+₹18,000.41 (15.0%)Admitted-Finance | L3 | Admitted-Finance | ||
| 4 | L4₹1.8 L+₹61,001.38 (50.8%)Admitted-Finance | L4 | Admitted-Finance | ||
| 5 | L5₹2.0 L+₹79,501.80 (66.3%)Admitted-Finance | L5 | Admitted-Finance |
Tender Value
₹2 L
EMD Value
₹4,000
Closing Date
19 Sept 2026, 6:55 pmClosed
Executive Engineer REW Division Poonch
Executive Engineer REW Division Poonch
Please refer to Boq
2026_RDPR_324475_6
e-NIT No. 110 of REW Poonch 2026-27 Dated 12-09-2026
Open Tender
Civil Works
Percentage
30 days
Poonch
Please refer Tender documents.
2 documents required · 2 mandatory
₹200
Executive Engineer REW Division Poonch
₹4,000
7 Oct 2026
12 Sept 2026
21 Sept 2026
12 Sept 2026
19 Sept 2026
12 Sept 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Earth work in bulk excavation by mechanical means (hydraulic excavator) over areas (exceeding 30 cm in depth, 1.5 m in width as well as 10 m2 on plan) including disposal of excavated earth lead upto 50 meters and lift upto 1.5 m, as directed by Engineer-in-Charge AKS = 80%, OR = 20% | 486.75 | cum | 265.19 | ₹1,29,081.23 |
| 2 | Providing and laying in position cement concrete of specified grade including curing but excluding the cost of centring and shuttering. All work upto plinth level with:1:3:6 (1 cement : 3 coarse sand : 6graded stone aggregate 20 mm nominal size) with 30% stone | 5.04 | cum | 4,294.37 | ₹21,643.62 |
| 3 | Providing and laying non-pressure of specified class R.C.C. pipes including collars/spigot jointed with stiff mixture of cement mortar in the proportion of 1:2 (1 cement: 2 fine sand) including testing of joints etc. complete. Non-pressure NP-3 class (Medium duty) R.C.C. pipes 600 mm dia. R.C.C. pipe | 15 | rmt | 2,415.8 | ₹36,237 |
| 4 | Carriage of Sand Agg. By 20 KM by mt | 4.75 | CUM | 409.94 | ₹1,947.22 |
| 5 | Carriage of HP Pipe 600 mm dia 150 kmt.by mt | 15 | rmt | 673.03 | ₹10,095.45 |
| 6 | Add cot of CIB | 1 | No | 1,000 | ₹1,000 |
stage.html
html • 0.03 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 1.91 MB
BOQ_1094568.xls
BOQ • 0.38 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .