| # | Company | Quoted % | Amount | Rank | Status |
|---|---|---|---|---|---|
| 1 | L1₹33.9 LAdmitted-Finance | -24.07% | ₹33.9 L | L1 | Admitted-Finance |
| 2 | L2₹34.1 L+₹20,961.07 (0.62%)Admitted-Finance 47 SODALA NEW SANGANER ROAD JAIPUR RAJASTHAN 302019 | JAIPUR | RAJASTHAN | 302019 | -23.60% | ₹34.1 L+₹20,961.07 (0.62%) | L2 | Admitted-Finance |
| 3 | L3₹36.2 L+₹2.4 L (6.94%)Admitted-Finance | -18.80% | ₹36.2 L+₹2.4 L (6.94%) | L3 | Admitted-Finance |
| 4 | L4₹37.1 L+₹3.2 L (9.43%)Admitted-Finance | -16.91% | ₹37.1 L+₹3.2 L (9.43%) | L4 | Admitted-Finance |
| 5 | L5₹37.5 L+₹3.6 L (10.7%)Admitted-Finance C3 63 CHITRAKOOT YOJANA JAIPUR | -15.96% | ₹37.5 L+₹3.6 L (10.7%) | L5 | Admitted-Finance |
Tender Value
₹44.6 L
EMD Value
₹89,200
Closing Date
8 Aug 2026, 6:00 pmClosed
EXECUTIVE ENIGNEER VIDHYADHAR NAGAR ZONE
JAIPUR NAGAR NIGAM PANDIT DEENDAYAL UPPADHYAY BHAWAN LALKOTHI TONK ROAD JAIPUR
INSTALLATION OF RAILINGS AND OTHER REPAIR WORK IN SHIV PARK AND GANESH PARK IN WARD NO. 16 OF VIDYADHAR NAGAR ZONE, CONSTRUCTION OF BOUNDARY WALL IN BANK COLONY AND INSTALLATION WORK OF INTERLOCKING TILES AT VARIOUS PLACES.
2026_DLB_578518_1
16 EXECUTIVE ENIGNEER VIDHYADHAR NAGAR ZONE
Open Tender
Civil Works
Percentage
180 days
JAIPUR
As Per Bid Documents
3 documents required · 3 mandatory
₹590
ONLINE PAY IN JAIPURMC WEBSITE
₹89,200
Yes
12 Aug 2026
30 Jul 2026
10 Aug 2026
30 Jul 2026
8 Aug 2026
30 Jul 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Bank Colony Boundary Wall | - | - | - | - |
| 2 | (4.10.1.1) Earth work in excavation in foundation, trenches etc. including dressing of sides and ramming of bottoms, including getting out the excavated material, refilling after laying pipe/ foundation and disposal of surplus excavated material at a lead upto 50m suitable site as per direction of Engineer for following depths, below natural ground / Road top level In all types soils/ saturated soil such as moorum, sand, sandy silt, clay, black cotton soil, kankar, etc. Depth upto 1.5 m | 67.5 | Cum | 229.5 | ₹15,491.25 |
| 3 | (21.1.7) Providing and laying in position cement concrete of specified grade excluding the cost of centring and shuttering - All work upto plinth level :1:4:8 (1 Cement : 4 fine/ coarse sand : 8 graded stone aggregate 40 mm nominal size). | 9 | Cum | 4,575 | ₹41,175 |
| 4 | (25.1.2) Random rubble masonry with hard stone in foundation and plinth : Cement mortar 1:4 (1 cement : 4 coarse sand) | 67.5 | Cum | 5,130 | ₹3,46,275 |
| 5 | (24.5.2) Brick work with FPS bricks of class designation 75 in superstructure above plinth level upto two stories in all shapes and sizes in :Cement mortar 1:6 (1 cement : 6 coarse sand) | 40.58 | cum | 6,300 | ₹2,55,654 |
| 6 | (32.1.2) Cement plastering including T&P, scaffolding, material and complete labour, including cost of water, curing, racking of joints etc. with 12 mm cement plaster of mix : including Providing /mixing of synthetic fibers compulsorily complying with IS 16481:2022 of 06 mm/12 mm length to be mixed @ 0.25% by weight of Cement i.e. 125 gms per 50 kg Cement up to 900 gms per cum of Concrete/ mortar 1:6 (1 cement : 6 fine/ coarse sand) | 320.25 | Sqm | 213.5 | ₹68,373.38 |
| 7 | (32.15) Providing and applying plaster of paris putty of 2 mm thickness over plastered surface to prepare the surface even and smooth complete | 1,082.95 | Sqm | 204.5 | ₹2,21,463.28 |
| 8 | (32.35.1) Finishing walls with Acrylic Smooth exterior paint of required shade :New work (Two or more coat applied @ 1.67 ltr/10 sqm over and including base coat of water proofing cement paint applied @ 2.20 kg/ 10 sqm). | 1,082.95 | Sqm | 144 | ₹1,55,944.8 |
| 9 | Shiv Park & Ganesh Park | - | - | - | - |
| 10 | (3.1.1) Demolishing brick work manually/ by mechanical means including stacking of serviceable material and disposal of unserviceable material within 50 metres lead as per direction of Engineer-in-charge. In cement mortar | 40.5 | Cum | 462.5 | ₹18,731.25 |
stage.html
html • 0.04 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.55 MB
BOQ_1028306.xls
BOQ • 0.35 MB
EPROC16XENVDZ.pdf
Tender Documents • 5.25 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .