Loading…
Loading…
| # | Company | Quoted % | Amount | Rank | Status |
|---|---|---|---|---|---|
| 1 | L1₹1.4 LAdmitted-Fee/PreQual/Technical/Finance | -34.00% | ₹1.4 L | L1 | Admitted-Fee/PreQual/Technical/Finance |
| 2 | L2₹1.4 L+₹3,690.51 (2.65%)Admitted-Fee/PreQual/Technical/Finance | -32.25% | ₹1.4 L+₹3,690.51 (2.65%) | L2 | Admitted-Fee/PreQual/Technical/Finance |
| 3 | L3₹1.5 L+₹13,713.34 (9.85%)Admitted-Fee/PreQual/Technical/Finance | -27.50% | ₹1.5 L+₹13,713.34 (9.85%) | L3 | Admitted-Fee/PreQual/Technical/Finance |
| 4 | L4₹1.6 L+₹17,152.75 (12.3%)Admitted-Fee/PreQual/Technical/Finance | -25.87% | ₹1.6 L+₹17,152.75 (12.3%) | L4 | Admitted-Fee/PreQual/Technical/Finance |
| 5 | L5₹1.7 L+₹33,761.11 (24.2%)Admitted-Fee/PreQual/Technical/Finance | -18.00% | ₹1.7 L+₹33,761.11 (24.2%) | L5 | Admitted-Fee/PreQual/Technical/Finance |
Tender Value
₹2.1 L
EMD Value
₹4,220
Closing Date
6 Aug 2026, 6:00 pmClosed
Executive Engineer RRWD SMC
Executive Engineer RIGHT RIVER WORKS DIVISON SRINAGAR MUNICIPAL CORPORATION REGAL LANE LAL CHOWK
Construction of lane at khar mohalla near khar masjid from h o gh mohammad ahanger via bashir ah by way of cement concrete at syedpora eidgah)
2026_HAUDD_317001_2
SHORT Term NOTICE INVITING ETENDER No. 18 of 2026-2027 Dated 20.07.2026 RRWD SMC
Open Tender
Civil Works
Percentage
60 days
cement concrete at syedpora eidgah
PLEASE REFER TO TENDER DOCUMENT
2 documents required · 2 mandatory
₹204
FA/CAO AC NO 0216010200000007
₹4,220
10 Aug 2026
21 Jul 2026
7 Aug 2026
22 Jul 2026
6 Aug 2026
22 Jul 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| - | Earth work in excavation by mechanical means (hydraulic excavator) in trenches for foundations, drains, pipes, cables etc. (not exceeding 1.5 m in width) and for shafts, wells, cesspits and the like not exceeding 10 sqm on plan, including dressing of sides and ramming of bottoms lift upto 1.5 m, including getting out excavated earth and disposal of surplus excavated earth as directed, within a lead of 50 metres: All kinds of soil : | 11.82 | Cum | 256.85 | ₹3,035.97 |
| - | Removal of Mulba/Unhygienic Material/Mud/unserviceable material from the site including its disposal beyond Municipal Limits by Mechanical Transport including all carriages, leads and Lifts complete job as directed at site. | 10.64 | Cum | 350 | ₹3,724 |
| - | Providing and laying of Stone soling/GSB filling/Nallamuck including dressing, watering and ramming including carriages complete | 6.62 | Cum | 850 | ₹5,627 |
| - | Providing and laying in position cement concrete of specified grade including curing but excluding the cost of centering and shuttering. All work upto plinth level with: 1:4:8 (1 cement : 4 coarse sand : 8 graded stone aggregate 40 mm nominal size) | 4.92 | Cum | 5,202.9 | ₹25,598.27 |
| - | Providing and laying in position specified grade of reinforced cement concrete including curing but excluding the cost of centering, shuttering, finishing and reinforcement. All works upto plinth level 1:2:4 (1 cement : 2 coarse sand : 4 graded stone aggregate 20 mm nominal size) | 9.56 | Cum | 7,104.35 | ₹67,917.59 |
| - | Steel reinforcement for R.C.C. work including straightening, cutting, bending, placing in position and binding all complete upto plinth level: Thermo-Mechanically Treated bars of grade Fe-500D or more | 669.16 | Kgs | 123.2 | ₹82,440.51 |
| - | Providing and laying in position cement concrete of specified grade including curing but excluding the cost of centering and shuttering. All work upto plinth level with: 1:3:6 (1 cement : 3 coarse sand : 6 graded stone aggregate 20 mm nominal size) | 1.7 | Cum | 5,733.6 | ₹9,747.12 |
| - | Centering and shuttering including strutting, propping etc. and removal of form for: Foundations, footings, bases of columns etc. for mass concrete. | 11.15 | Sqm | 286.35 | ₹3,192.8 |
| - | Raising of RCC Polycrate Manhole cover andn frame slab to required level including necessary concreting in M15 Grade shuttering and making good the damange as required all complete job | 2 | No. | 600 | ₹1,200 |
| - | Carriage of material by mechanical Transport: Sand/Aggregate | 21.84 | Cum | 344.49 | ₹7,523.66 |
stage.html
html • 0.02 MB
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.96 MB
BOQ_1037252.xls
BOQ • 0.30 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .