Loading…
Loading…
| # | Company | Quoted % | Amount | Rank | Status |
|---|---|---|---|---|---|
| 1 | L1₹14.3 LAdmitted-Finance | +17.93% | ₹14.3 L | L1 | Admitted-Finance |
| 2 | L2₹14.3 L+₹727.14 (0.05%)Admitted-Finance | +17.99% | ₹14.3 L+₹727.14 (0.05%) | L2 | Admitted-Finance |
| 3 | L3₹15.0 L+₹67,381.68 (4.71%)Admitted-Finance SECOND FLOOR 134B PART 3 SECTOR 5 GURURAM 122001 | GURUGRAM | GURUGRAM | HARYANA | 122001 | +23.49% | ₹15.0 L+₹67,381.68 (4.71%) | L3 | Admitted-Finance |
Tender Value
₹12.1 L
EMD Value
₹24,240
Closing Date
7 Jul 2026, 5:00 pmClosed
BHIM
Division - Sewerage
Construction of damaged RCC slab of various sizes and fixing the same, prov. and fixing of M.Hs cover, brick work
2026_HRY_531767_1
2026AF65DD68 95AC 4E2D 875C AB2B905E4319717001
Open Tender
Civil Works
Works
60 days
Gurugram
2 documents required · 2 mandatory
₹1,180
₹24,240
Yes
27 Jul 2026
25 Jun 2026
8 Jul 2026
25 Jun 2026
7 Jul 2026
25 Jun 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | [11.5.1]12 mm cement plaster of mix : 1. 1:2 (1 cement: 2 fine sand) [Through Rate] | - | Sqm | - | - |
| 2 | [21.93.1]Providing and fixing SFRC MANHOLE COVERS AND FRAMES MARKED WITH IS: 12592 including setting the same to correct lines and levels in 1:3 cement sand mortar over manhole including carriage loading unloading stacking handling re-handling etc. complete in all respects to the satisfaction to the Engineer-in-charge. 1. Type:- Extra Heavy Duty Set (EHD-35) 560MM Clear Opening [Through Rate] | - | Nos | - | - |
| 3 | [6.14.1]Providing and laying in position specified grade of reinforced cement concrete, excluding the cost of centering, shuttering, finishing and reinforcement - All work up to plinth level : 1. 1:1.5:3 (1 cement : 1.5 coarse sand (zone-III): 3 graded stone aggregate 20 mm nominal size) [Through Rate] | 0.8 | cum | - | - |
| 4 | [6.30.3]Centering and shuttering including strutting, propping etc. and removal of form for 3. Suspended floors, roofs, landings, balconies and access platform [Through Rate] | - | Sqm | - | - |
| 5 | [6.33.6]Steel reinforcement for R.C.C. work, where not included in the complete rate of RCC, including straightening, cutting, bending, placing in position, binding, wastage, overlaps, welded joints, spacer bars, chairs, stays, hangers and annealed steel wire etc. complete in all respect below plinth level Note: Reinforcement shall be measured in length including hooks, if any, separately for different diameters as actually used in work , excluding overlaps. Wastage, overlaps, couplings, welded joints, spacer bars, chairs, stays, hangers and annealed steel wire or other methods of binding & placing shall not be measured and cost of these items shall be deemed to be included in the rates for reinforcement. 6. Thermo-Mechanically Treated bars of grade Fe-500D or more [Through Rate] | - | kg | - | - |
| 6 | [7.20.1]Brick work with common burnt clay modular bricks of class designation 10.5 in foundation and plinth in: 1. Cement mortar 1:4 (1 cement : 4 coarse sand) [Through Rate] | - | cum | - | - |
stage.html
html • 0.03 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.77 MB
AD0166983.pdf
Additional Documents • 0.46 MB
BOQ_610822.xls
BOQ • 0.26 MB
OT0166983.pdf
Other Document • 0.26 MB
cg2.pdf
PDF • 0.25 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .