Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L-1₹5.2 CrAccepted-Finance | ₹5.2 Cr | L-1 | Accepted-Finance L1 |
| 2 | L-2₹5.6 Cr+₹35.4 L (6.80%)Rejected-Finance BARABANKI | UTTAR PRADESH | 225001 | ₹5.6 Cr+₹35.4 L (6.80%) | L-2 | Rejected-Finance L2 |
| 3 | L-3₹6.1 Cr+₹85.0 L (16.3%)Rejected-Finance | ₹6.1 Cr+₹85.0 L (16.3%) | L-3 | Rejected-Finance L3 |
| 4 | L-4₹6.1 Cr+₹88.7 L (17.0%)Rejected-Finance | ₹6.1 Cr+₹88.7 L (17.0%) | L-4 | Rejected-Finance L4 |
Tender Value
Refer Docs
EMD Value
₹12.2 L
Closing Date
4 Apr 2026, 12:00 pmClosed
Superintending Engineer
PMGSY Circle, PWD, 15/5 Civil Line Kanpur
Construction work of division level State Tax Office building in District Lalitpur
2026_WBEAP_1130696_1
500/167C-PMGSYC/2026 DT. 27.03.2026
Open Tender
Civil Works - Buildings
Percentage
365 days
Lalitpur
Please refer Tender documents.
2 documents required · 2 mandatory
₹7,950
₹12.2 L
S.E., PMGSY Circle, PWD, 15/5 Civil Line Kanpur
2 May 2026
27 Mar 2026
4 Apr 2026
27 Mar 2026
4 Apr 2026
27 Mar 2026
1 Apr 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1Earth work in excavation by mechanical means (Hydraulic excavator)/ manual means over areas (exceeding 30 cm in depth, 1 . 5 m in width as well as 1 0 sqm on plan) including getting out and disposal of excavated earth lead upto 50 m and for all lift, as directed by Engineer-in-charge. DSR 2.6.1 | |||||
| 2Extra for every additional lift of 1.5 m or part thereof in excavation / banking excavated or stacked materials. All kinds of soil. DSR 2.26 | |||||
| 3Excavating, supplying and filling of local earth (including royalty) by mechanical transport upto a lead of 5km also including ramming and watering of the earth in layers not exceeding 20 cm in trenches, plinth, sides of foundation etc. complete. DSR 2.25a | |||||
| 4Supplying and filling in plinth with sand under floors, including watering, ramming, consolidating and dressing complete. DSR 2.27 | |||||
| 51:4:8 (1 Cement : 4 coarse sand (zone-III) derived from natural sources : 8 graded stone aggregate 40 mm nominal size derived from natural sources) DSR 4.1.8 | |||||
| 6Reinforced cement concrete work in beams, suspended floors, roofs having slope up to 15° landings, balconies, shelves, chajjas, lintels, bands, plain window sills, staircases and spiral stair cases above plinth level up to floor five level, excluding the cost of centering, shuttering, finishing and reinforcement with 1:1.5:3 (1 cement : 1.5 coarse sand(zone-III) derived from natural sources : 3 graded stone aggregate 20 mm nominal size derived from natural sources). (RWH) DSR 5.3 | |||||
| 7Providing and laying in position ready mixed or site batched design mix cement concrete for reinforced cement concrete work; using coarse aggregate and fine aggregate derived from natural sources, Portland Pozzolana / Ordinary Portland /Portland Slag cement, admixtures in recommended proportions as per IS: 9103 to accelerate / retard setting of concrete, to improve durability and workability without impairing strength; including pumping of concrete to site of laying, curing, carriage for all leads; but excluding the cost of centering, shuttering, finishing and reinforcement as per direction of the engineer-in-charge; for the following grades of concrete. Note: Extra cement up to 10% of the minimum specified cement content in design mix shall be payable separately. In case the cement content in design mix is more than 110% of the specified minimum cement content, the contractor shall have discretion to either re-design the mix or bear the cost of extra cement. All works upto plinth level. Concrete of M25 grade with minimum cement content of 330 kg /cum DSR 5.33.1.1 | |||||
| 8Providing and laying in position ready mixed or site batched design mix cement concrete for reinforced cement concrete work; using coarse aggregate and fine aggregate derived from natural sources, Portland Pozzolana / Ordinary Portland /Portland Slag cement, admixtures in recommended proportions as per IS: 9103 to accelerate / retard setting of concrete, to improve durability and workability without impairing strength; including pumping of concrete to site of laying, curing, carriage for all leads; but excluding the cost of centering, shuttering, finishing and reinforcement as per direction of the engineer-in-charge; for the following grades of concrete. Note: Extra cement up to 10% of the minimum specified cement content in design mix shall be payable separately. In case the cement content in design mix is more than 110% of the specified minimum cement content, the contractor shall have discretion to either re-design the mix or bear the cost of extra cement. All works above plinth level upto floor V level. Concrete of M25 grade with minimum cement content of 330 kg /cum 5.33.2.1 | |||||
| 9Providing and laying in position ready mixed or site batched design mix cement concrete for reinforced cement concrete work; using coarse aggregate and fine aggregate derived from natural sources, Portland Pozzolana / Ordinary Portland /Portland Slag cement, admixtures in recommended proportions as per IS: 9103 to accelerate / retard setting of concrete, to improve durability and workability without impairing strength; including pumping of concrete to site of laying, curing, carriage for all leads; but excluding the cost of centering, shuttering, finishing and reinforcement as per direction of the engineer-in-charge; for the following grades of concrete. Note: Extra cement up to 10% of the minimum specified cement content in design mix shall be payable separately. In case the cement content in design mix is more than 110% of the specified minimum cement content, the contractor shall have discretion to either re-design the mix or bear the cost of extra cement. (B/W) DSR 4.20.1.3 | |||||
| 10Centering and shuttering including strutting, propping etc. and removal of form for : Foundations, footings, bases of columns, etc. for mass concrete, Boundary Wall DSR 5.9.1 | |||||
stage.html
html • 0.04 MB
tech_bid_open.pdf
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 1.49 MB
BOQ_2109447.xls
BOQ • 0.47 MB
CBDJhashi.pdf
Tender Documents • 6.89 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .