| Sl No | Description | Qty | Unit | K R ENTERPRISE L2 | F.R. ENTERPRISE L1 | N.K. ENTERPRISE L3 |
|---|---|---|---|---|---|---|
| 1.00Installation of one no. 350 mtr head 1000 GPM pump with 425 KW motor with all valves and bends and pipe at 75L/13D at LHCM1 section in RVIIA seam of 3&4 Incline UG of Jhanjra Project Colliery | ||||||
| 1.01 | Loading and transportation of 350 mtr. head turbine pump, 6.6 kV / 425 kW motor, 6" dia. Foot valve, 4" dia. NR valve, 4" dia. sluice valve from surface to site at 75 L / 13 D (R-VIIA) partly manually and partly with the help of haulages. | 1 | WORK | 27,050.4 ₹27,050.40 | 26,520 ₹26,520 | 27,320.9 ₹27,320.90 |
| 1.02 | Loading of 150 mtr. 6.6 kV grade, 35 sq.mm. cable, 6.6 kV / 425 kW starter, 6.6 kV VCB from surface to site at 75 L / 13 D (R-VIIA) partly manually and partly with the help of haulages and laying / hanging this cable from sub-station to VCB. | 1 | WORK | 25,143 ₹25,143 | 24,650 ₹24,650 | 25,394.43 ₹25,394.43 |
| 1.03 | Loading & transportation of base frame from surface to site with the help of haulages and transporting manually 15 mtr. at the installation site. | 1 | WORK | 21,879 ₹21,879 | 21,450 ₹21,450 | 22,097.79 ₹22,097.79 |
| 1.04 | Necessary cleaning of installation site. | 1 | WORK | 8,827.08 ₹8,827.08 | 8,654 ₹8,654 | 8,915.35 ₹8,915.35 |
| 1.05 | Placing of base frame and grouting with floor bolts and alignment. | 1 | WORK | 19,023 ₹19,023 | 18,650 ₹18,650 | 19,213.23 ₹19,213.23 |
| 1.06 | Installation of pump and motor on base frame, aligning them with necessary fabrication, fitting of 4" dia. NR valve, 4" dia. sluice valve, 6" dia. foot valve, 1 no. 4" dia. pipe bend, 5 no. 6" dia. suction pipes & delivery side pipe matching and testing them at site of water sump. | 1 | WORK | 1,42,802.04 ₹1.4 L | 1,40,002 ₹1.4 L | 1,44,230.06 ₹1.4 L |
| 1.07 | Priming of pump by pouring of water. | 1 | WORK | 11,475 ₹11,475 | 11,250 ₹11,250 | 11,589.75 ₹11,589.75 |
| 1.08 | Leakage checking and rectification of pump and pipeline | 1 | WORK | 10,832.4 ₹10,832.40 | 10,620 ₹10,620 | 10,940.72 ₹10,940.72 |
| 1.09 | Supply of DA cylinder (12.4 Cu. Mtr.) @ 6.2 Cu. Mtr./cyl. = 2 cyl. | 1 | WORK | 6,936 ₹6,936 | 6,800 ₹6,800 | 7,005.36 ₹7,005.36 |
Tender Value
₹3.8 L
EMD Value
₹4,800
Closing Date
17 Feb 2026, 11:00 amClosed
AREA ENGINEER ENM
Office of the General Manager, Jhanjra Area, ECL
Installation of one no. 350 mtr head 1000 GPM pump with 425 KW motor with all valves and bends and pipe at 75L/13D at LHCM1 section in RVIIA seam of 3and4 Incline UG of Jhanjra Project Colliery
2026_ECL_352498_1
ECL/GM/JNR/EnM/A2/25-26/122 dated 04.02.2026
Open Tender
Miscellaneous Works
15 days
JHANJRA UG
Please refer Tender documents.
4 documents required · 4 mandatory
₹4,800
23 Feb 2026
6 Feb 2026
18 Feb 2026
6 Feb 2026
17 Feb 2026
7 Feb 2026
6 Feb 2026 - 13 Feb 2026
Installation of one no. 350 mtr head 1000 GPM pump with 425 KW motor with all valves and bends and pipe at 75L/13D at LHCM1 section in RVIIA seam of 3&4 Incline UG of Jhanjra Project Colliery
Loading and transportation of 350 mtr. head turbine pump, 6.6 kV / 425 kW motor, 6" dia. Foot valve, 4" dia. NR valve, 4" dia. sluice valve from surface to site at 75 L / 13 D (R-VIIA) partly manually and partly with the help of haulages.
Loading of 150 mtr. 6.6 kV grade, 35 sq.mm. cable, 6.6 kV / 425 kW starter, 6.6 kV VCB from surface to site at 75 L / 13 D (R-VIIA) partly manually and partly with the help of haulages and laying / hanging this cable from sub-station to VCB.
Loading & transportation of base frame from surface to site with the help of haulages and transporting manually 15 mtr. at the installation site.
Necessary cleaning of installation site.
Placing of base frame and grouting with floor bolts and alignment.
Installation of pump and motor on base frame, aligning them with necessary fabrication, fitting of 4" dia. NR valve, 4" dia. sluice valve, 6" dia. foot valve, 1 no. 4" dia. pipe bend, 5 no. 6" dia. suction pipes & delivery side pipe matching and testing them at site of water sump.
Priming of pump by pouring of water.
Leakage checking and rectification of pump and pipeline
Supply of DA cylinder (12.4 Cu. Mtr.) @ 6.2 Cu. Mtr./cyl. = 2 cyl.
Supply of Oxygen cylinder (42.6 Cu. mtr.) @ 7.1 Cu. mtr./cyl. = 6 cyl.
Civil work for making base of pump and placing of starter
Total impact of GST for the purpose of CTC
Please Enable Macros to View BoQ information
stage.html
html • 0.03 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.05 MB
Tendernotice_1.pdf
PDF • 1.48 MB
Tendernotice_2.pdf
PDF • 1.20 MB
BOQ_365288.xls
BOQ • 0.29 MB
Download all tender documents and submit your bid