| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹6.6 LAccepted-AOC | ₹6.6 L | L1 | Accepted-AOC Accepted |
| 2 | L2₹7.3 L+₹66,635.63 (10.1%)Rejected-AOC | ₹7.3 L+₹66,635.63 (10.1%) | L2 | Rejected-AOC Rejected |
| 3 | L3₹7.8 L+₹1.2 L (18.8%)Rejected-AOC COIMBATORE CORPORATION | COIMBATORE | COIMBATORE | TAMIL NADU | ₹7.8 L+₹1.2 L (18.8%) | L3 | Rejected-AOC Rejected |
| Sl No | Description | Qty | Unit | M RAMARAJ L3 | RGR CONSTRUCTION L2 | ASM INFRA PROJECTS L1 |
|---|---|---|---|---|---|---|
| 1.00 | Dismantling the damaged RCC Slab as per the instruction of Departmental officers. Including all initial lead and other labour charges. | 24 | m3 | 4,818.28 ₹1,15,638.72 | 4,463 ₹1,07,112 | 1,000 ₹24,000 Lowest |
| 2.00 | Dismantling the existing damaged Plain cement concrete wall drain including all labours etc., complete | 24 | m3 | 543.69 ₹13,050.03 | 504 ₹12,097.36 Lowest | 600 ₹14,401.62 |
| 3.00 | Earth work excavation in all soils and sub-soils and the full depth as may be directed by the departmental officers with initial lead and lift and cleaning and levelling the site etc., complete complying with standard specification | 140 | m3 | 209.02 ₹29,262.8 | 194 ₹27,160 | 25 ₹3,500 Lowest |
| 4.00 | Cement concrete 1:4:8 (One cement four sand Eight broken stone) using 40mm guage hard broken granite stone jelly for no more than 15cm thick, compacting etc., complete complying with standard. | 15 | m3 | 5,664.9 ₹84,973.5 | 5,247 ₹78,705 Lowest | 6,300 ₹94,500 |
| 5.00Centering with Steel Plates for Sides and Soffits including all Labour Charges as per the Direction of the Departmental officers Etc., Complete. | ||||||
| 5.01 | Drain Sidewall | 312 | m2 | 507.35 ₹1,58,293.2 | 471 ₹1,46,952 Lowest | 480 ₹1,49,760 |
| 5.02 | Culvert Slab bottom | 6 | m2 | 1,122.07 ₹6,732.42 | 1,040 ₹6,240 | 100 ₹600 Lowest |
| 6.00 | Plain Cement Concrete 1:2:4 (one cement, two Crushed Stone Sand (M- Sand) and four coarse aggregates) using 20mm size ISS HBG metal including cost and conveyance of all materials to site and including for the mixing, laying and labour charges etc., complete as per standard specification | 1 | m3 | 6,904.22 ₹6,904.22 | 6,395 ₹6,395 | 1,343.58 ₹1,343.58 Lowest |
| 7.00 | Plain Cement Concrete 1:3:6 (one cement, three Crushed Stone Sand (M- Sand) and sixcoarse aggregates) using 20mm size ISS HBG metal including cost and conveyance of all materials to site and including for the mixing, laying and labour charges etc., complete as per standard specification | 55 | m3 | 6,386.15 ₹3,51,244.64 | 5,915 ₹3,25,330.91 Lowest | 6,450 ₹3,54,756.45 |
| 8.00 | Removal of Excavated Excess Earth away from the site to 5K.M including
loading and transportation charges etc, complete as per standard
specification. For 1M3 | 165 | m3 | 98.81 ₹16,303.65 | 92 ₹15,180 Lowest | 95 ₹15,675 |
Tender Value
₹10 L
EMD Value
₹10,000
Closing Date
24 Jun 2026, 3:00 pmClosed
Assisstant Commissioner-West Zone
West Zone, Coimbatore Corporation
Reconstruction of storm water drain VOC nagar 4th Street in ward no 42 of west zone
2026_MAWS_681513_20
E1/WESTZONE/2026
Open Tender
Civil Works
Works
90 days
West Zone, Coimbatore Corporation
As per document attached
4 documents required · 4 mandatory
₹0
₹10,000
Yes
24 Aug 2026
18 Jun 2026
25 Jun 2026
18 Jun 2026
24 Jun 2026
18 Jun 2026
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Dismantling the damaged RCC Slab as per the instruction of Departmental officers. Including all initial lead and other labour charges. | 24 | m3 | - | - |
| 2 | Dismantling the existing damaged Plain cement concrete wall drain including all labours etc., complete | 24 | m3 | - | - |
| 3 | Earth work excavation in all soils and sub-soils and the full depth as may be directed by the departmental officers with initial lead and lift and cleaning and levelling the site etc., complete complying with standard specification | 140 | m3 | - | - |
| 4 | Cement concrete 1:4:8 (One cement four sand Eight broken stone) using 40mm guage hard broken granite stone jelly for no more than 15cm thick, compacting etc., complete complying with standard. | 15 | m3 | - | - |
| 5Centering with Steel Plates for Sides and Soffits including all Labour Charges as per the Direction of the Departmental officers Etc., Complete. | |||||
| 5.01 | Drain Sidewall | 312 | m2 | - | - |
| 5.02 | Culvert Slab bottom | 6 | m2 | - | - |
| 6 | Plain Cement Concrete 1:2:4 (one cement, two Crushed Stone Sand (M- Sand) and four coarse aggregates) using 20mm size ISS HBG metal including cost and conveyance of all materials to site and including for the mixing, laying and labour charges etc., complete as per standard specification | 1 | m3 | - | - |
| 7 | Plain Cement Concrete 1:3:6 (one cement, three Crushed Stone Sand (M- Sand) and sixcoarse aggregates) using 20mm size ISS HBG metal including cost and conveyance of all materials to site and including for the mixing, laying and labour charges etc., complete as per standard specification | 55 | m3 | - | - |
| 8 | Removal of Excavated Excess Earth away from the site to 5K.M including
loading and transportation charges etc, complete as per standard
specification. For 1M3 | 165 | m3 | - | - |
stage.html
html • 0.04 MB
tech_eval.pdf
fin_eval.pdf
aoc.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 3.88 MB
SWD.pdf
Tender Documents • 0.85 MB
CONDITIONS.pdf
Additional Documents • 0.26 MB
BOQ_819219.xls
BOQ • 0.26 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .