Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹19.1 LAdmitted-Finance 3788 SHAH GANJ GB ROAD NEW DELHI 110006 | NORTH | DELHI | 110006 | ₹19.1 L | L1 | Admitted-Finance |
| 2 | L2₹23.7 L+₹4.6 L (24.1%)Admitted-Finance III 6 7 2ND FLOOR ABOVE BANK OF BARODA GOPINATH BAZAR DELHI CANTT 110 010 | DELHI CANTT | NEW DELHI | DELHI | 110010 | ₹23.7 L+₹4.6 L (24.1%) | L2 | Admitted-Finance |
| 3 | L3₹26.9 L+₹7.7 L (40.5%)Admitted-Finance 1 128 A SECOND FLOOR MOHAMMADPUR NEAR BHIKAJCAMA PLACE NEW DELHI 110066 | NEW DELHI | NEW DELHI | DELHI | 110066 | ₹26.9 L+₹7.7 L (40.5%) | L3 | Admitted-Finance |
| 4 | L4₹46.4 L+₹27.3 L (142.6%)Admitted-Finance | ₹46.4 L+₹27.3 L (142.6%) | L4 | Admitted-Finance |
| Sl No | Description | Qty | Unit | MB Enterprises L2 | M/S Anand Enterprises L1 | M/s Dhapola Elevator and Engineering L3 | GURBUX SINGH AND CO. L4 |
|---|---|---|---|---|---|---|---|
| 1.00Comprehensive, preventive and periodical maintenance of lifts/elevators/dumbwaiters installed in AHRR Complex as mentioned here-in-after, in reliable, safe and efficient manner using latest techniques & expertise consultancy by regularly examining, lubricating and adjusting the mechanical and electrical driving equipment incl replacement of unsv componenents such as, governor sleeve, shaft assembly, bearing / contact, governor jaws, car & hall mechanical buttons, car & hall position indicators, car direction indicators and all other car and landing signal / fixtures, deflectors, counter weight, guide rails, buffers, machines motors, generators, door ropes, ARD system, PCBs, belts, rollers, gears, bearings, solenoids, coils, chock brake shoes, liners, contactors, relays, coils, pushbuttons, door operator VVF drive, VVVF main drive, cardoor safety device, limit switches, governor, hoistway door locks, indicators and other machanical and electrical parts (excpet car cabin, landing door, sheave rim and Srl item No 02 to 10 of Sch 'A') for smooth functioning of elevators and incl all machine works i.e. welding, cutting, drilling, screwing, etc. as and when required, to entire satisfaction of Engineer-in-charge, incl cost of materials complete incl Sunday and holiday all as specified & directed for following Lift(s) / Elevator(s) - | |||||||
| 1.01 | Electric Hospital passneger cum stretcher elevator /lifts of capacity 20 passenger serving (-1+G+4) 6 floors installed at E Block (No 9281) (Make : TKE Elevator) -01 Nos lifts | 12 | Per Lift per calender month | 14,500 ₹1,74,000 | 16,000 ₹1,92,000 | 17,000 ₹2,04,000 | 12,500 ₹1,50,000 Lowest |
| 1.02 | Electric Hospital passneger cum stretcher elevator /lifts of capacity 20 passenger serving (-1+G+4) 6 floors installed at E Block (Make : Omega Elevator) -01 Nos lifts (Note: AMC will start from 11 Feb 2027) | 5 | Per Lift per calender month | 16,500 ₹82,500 Lowest | 22,000 ₹1,10,000 | 16,800 ₹84,000 | 18,000 ₹90,000 |
| 1.03 | Electric Hospital passneger cum stretcher elevator /lifts of capacity 26 passenger serving (G+4) 5 floors installed at A Block (No 9248) (Make TKE Elevator) -01 Nos lifts | 12 | Per Lift per calender month | 14,500 ₹1,74,000 | 16,000 ₹1,92,000 | 17,800 ₹2,13,600 | 12,500 ₹1,50,000 Lowest |
| 1.04 | Electric Hospital passenger cum stretcher elevator /lifts of capacity 26 passenger serving (G+4) 5 floors installed at D Block lift No 02 & 03 -02 Nos lifts.(Omega Elevator) (Note: AMC will start from 11 Feb 2027) | 5 | Per Lift per calender month | 42,000 ₹2,10,000 | 42,000 ₹2,10,000 | 35,500 ₹1,77,500 | 30,000 ₹1,50,000 Lowest |
| 1.05 | Electric Hospital passenger cum stretcher elevator /lifts of capacity 26 passenger serving (G+4) 5 floors installed at D Block (No 13557) -01 Nos lifts. (Make TKE Elevator) | 12 | Per Lift per calender month | 22,500 ₹2,70,000 | 16,000 ₹1,92,000 | 16,800 ₹2,01,600 | 14,000 ₹1,68,000 Lowest |
| 1.06 | Electric passneger elevator /lifts of capacity 08 passenger (544 Kgs) serving (G+5) 6 floors installed at P-94 Block (Make Kone Elevator) -01 Nos lifts. | 12 | Per Lift per calender month | 12,000 ₹1,44,000 Lowest | 28,000 ₹3,36,000 | 15,500 ₹1,86,000 | 15,000 ₹1,80,000 |
| 1.07 | Electric passenger elevator /lifts of capacity 08 passenger serving (G+5) 6 floors installed at P18 -01 No, P19 - 01 No -02 Nos lifts (Make : Omega Elevator) (Note: AMC will start from 11 Feb 2027) | 5 | Per Lift per calender month | 20,000 ₹1,00,000 Lowest | 32,000 ₹1,60,000 | 36,500 ₹1,82,500 | 30,000 ₹1,50,000 |
| 1.08Notes for item No. 1.00 to 1.07: (i) The above maintenance shall be done through OEM of existing lifts. Please also refer Sch 'A' Notes. (ii) The contractor shall have to submit MOU from OEM M/S Otis Elevators(for Item No. 1.02 to 1.07). (iii) The rates quoted shall be inclusive of T&P required for carrying out repairs, stationary for maintenance of record all as specified. (iv) All the cleaning items (Dusting cloths, floor/Glass cleaner, SS steel cleaner, broom etc) shall be provided by the contractor and rates deemed to be included in the quoted rate. Otherwise a penalty of Rs. 100/- per day will be charged. (v) Any items not covered in Sch 'A' (except car cabin, landing door, sheave rim and Srl Item No 02 to 25 of Sch A) shall be deemed to be included in the unit rate quoted for above item for the smooth functioning of lifts and the contractor may quote the rate accordingly. Contractor is expected to inspect the lift before quoting the rate and Lifts will be handed over in the same condition. No claim will be admissible thereof. | |||||||
| 1.09Notes for item No. 1.00 to 1.07 (contd.):- (vi) Contractor shall be attending complaints round the clock i.e. 24 hrs. If contractor is not able to rectify the complaint, penalty shall be charged as given below:- (a) up to 1st day- NIL (b) 2nd day- Rs 1000/- day (c) Subsequency for every days - Rs 2000/day. (vii) Contractor shall be responsible to register the day to day complaints of lifts and addressed the same with in the stipulated timeframe and the complaint register will be putup to the JE / Engr-in-charge on daily basis. (viii) The comprehensive / preventive / periodical maint incl, monthly, quarterly, half yearly inspection / testing as per service manual or as per IS standard will be submitted to Engr-in-charge. (ix) Contractor shall submit safety security certificate of lifts from OEM. (x) Adequate arrangements shall be made to dewatering the lift pit as and when water accumulates. Cost Should be included in the quoted rate. Otherwise penality of Rs 500 per day per lift will be recovered from the contractor. (xi) Contractor shall be responsible to update the imp tele number and safety precautions of inside the car cabin of each lifts and update the same time to time. | |||||||
Tender Value
₹30 L
EMD Value
₹60,000
Closing Date
17 Aug 2026, 6:00 pmClosed
CWE NEW DELHI
HQ CWE NEW DELHI
COMPREHENSIVE PREVENTIVE AND PERIODICAL MAINT OF LIFTS AT MAIN BLDG P-100 (A AND D AND E BLOCK) BLDG P-94 P-18 P-19 AT AHRR UNDER GE UNDER GE EM RR HOSPITAL DELHI CANTT-10
2026_MES_779580_1
CWE-ND/T-25/2026-27
Open Tender
Civil Works
Item Rate
DELHI CANTT
Please refer Tender documents.
9 documents required · 9 mandatory
₹500
GE EM RR HOSP DELHI CANTT
₹60,000
25 Aug 2026
18 Jul 2026
19 Aug 2026
18 Jul 2026
17 Aug 2026
3 Aug 2026
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1Comprehensive, preventive and periodical maintenance of lifts/elevators/dumbwaiters installed in AHRR Complex as mentioned here-in-after, in reliable, safe and efficient manner using latest techniques & expertise consultancy by regularly examining, lubricating and adjusting the mechanical and electrical driving equipment incl replacement of unsv componenents such as, governor sleeve, shaft assembly, bearing / contact, governor jaws, car & hall mechanical buttons, car & hall position indicators, car direction indicators and all other car and landing signal / fixtures, deflectors, counter weight, guide rails, buffers, machines motors, generators, door ropes, ARD system, PCBs, belts, rollers, gears, bearings, solenoids, coils, chock brake shoes, liners, contactors, relays, coils, pushbuttons, door operator VVF drive, VVVF main drive, cardoor safety device, limit switches, governor, hoistway door locks, indicators and other machanical and electrical parts (excpet car cabin, landing door, sheave rim and Srl item No 02 to 10 of Sch 'A') for smooth functioning of elevators and incl all machine works i.e. welding, cutting, drilling, screwing, etc. as and when required, to entire satisfaction of Engineer-in-charge, incl cost of materials complete incl Sunday and holiday all as specified & directed for following Lift(s) / Elevator(s) - | |||||
| 1.01 | Electric Hospital passneger cum stretcher elevator /lifts of capacity 20 passenger serving (-1+G+4) 6 floors installed at E Block (No 9281) (Make : TKE Elevator) -01 Nos lifts | 12 | Per Lift per calender month | 1.25 | ₹15 |
| 1.02 | Electric Hospital passneger cum stretcher elevator /lifts of capacity 20 passenger serving (-1+G+4) 6 floors installed at E Block (Make : Omega Elevator) -01 Nos lifts (Note: AMC will start from 11 Feb 2027) | 5 | Per Lift per calender month | 1.25 | ₹6.25 |
| 1.03 | Electric Hospital passneger cum stretcher elevator /lifts of capacity 26 passenger serving (G+4) 5 floors installed at A Block (No 9248) (Make TKE Elevator) -01 Nos lifts | 12 | Per Lift per calender month | 1.25 | ₹15 |
| 1.04 | Electric Hospital passenger cum stretcher elevator /lifts of capacity 26 passenger serving (G+4) 5 floors installed at D Block lift No 02 & 03 -02 Nos lifts.(Omega Elevator) (Note: AMC will start from 11 Feb 2027) | 5 | Per Lift per calender month | 1.25 | ₹6.25 |
| 1.05 | Electric Hospital passenger cum stretcher elevator /lifts of capacity 26 passenger serving (G+4) 5 floors installed at D Block (No 13557) -01 Nos lifts. (Make TKE Elevator) | 12 | Per Lift per calender month | 1.25 | ₹15 |
| 1.06 | Electric passneger elevator /lifts of capacity 08 passenger (544 Kgs) serving (G+5) 6 floors installed at P-94 Block (Make Kone Elevator) -01 Nos lifts. | 12 | Per Lift per calender month | 1.25 | ₹15 |
| 1.07 | Electric passenger elevator /lifts of capacity 08 passenger serving (G+5) 6 floors installed at P18 -01 No, P19 - 01 No -02 Nos lifts (Make : Omega Elevator) (Note: AMC will start from 11 Feb 2027) | 5 | Per Lift per calender month | 1.25 | ₹6.25 |
| 2 | Supply & fix in replacement of SMF Battery 12 V 7 AH or all as per site requirement complete all as specified & directed. | 40 | Each | 100 | ₹4,000 |
| 3 | Supply & fix in replacement of SMF Battery 12 V 18 AH or all as per site requirement complete all as specified & directed. | 8 | Each | 53 | ₹424 |
stage.html
html • 0.03 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.73 MB
TENDER25.pdf
Tender Documents • 1.63 MB
BOQ_873183.xls
BOQ • 0.42 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .