Tender Value
₹98.4 L
EMD Value
₹2.0 L
Closing Date
20 Apr 2026, 3:00 pmClosed
No
No
Single Packet System
Normal Tender
No
Not Applicable
Lowest to Highest
60 days
Expenditure
Capital (Works)
TENDER
19 conditions · 3 needing a document upload
The tenderer must have minimum average annual contractual turnover of V/N or V whichever is less; where V= Advertised value of the tender in crores of Rupees N= Number of years prescribed for completion of work for which bids have been invited. The average annual contractual turnover shall be calculated as an average of "total contractual payments" in the previous three financial years, as per the audited balance sheet. However, in case balance sheet of the previous year is yet to be prepared/audited, the audited balance sheet of the fourth previous year shall be considered for calculating average annual contractual turnover The tenderers shall submit requisite information as per Annexure-VIB of GCC (along with copies of Audited Balance Sheets duly certified by the Chartered Accountant/ Certificate from Chartered Accountant duly supported by Audited Balance Sheet.
Note: Client certificate from other than Govt Organization should be duly supported by Form 16A/26AS generated through TRACES of Income Tax Department of India.
Regarding average annual contractual turnover, The tenderers shall submit Annexure-VIB of GCC as per proforma available in GCC/Tender Document Part A to C.
71 conditions · 8 needing a document upload
(i) A scanned copy of the Bank Guarantee shall be uploaded on e-Procurement Portal (IREPS) while applying to the tender. (ii) The original Bank Guarantee should be delivered in person to the official nominated as indicated in the tender document before closing date for submission of bids (i.e. excluding the last date of submission of bids) (iii) Non submission of scanned copy of Bank Guarantee with the bid on e-tendering portal (IREPS) and/or non submission of original Bank Guarantee within the specified period shall lead to summary rejection of bid.
The tenderers shall submit a copy of certificate stating that all their statements/documents submitted along with bid are true and factual. Standard format of certificate to be submitted by the bidder is enclosed as Annexure-XIIA or VA of GCC. Non submission of above certificate by the bidder shall result in summarily rejection of his /their bid. It shall be mandatorily incumbent upon the tenderer to identify, state and submit the supporting documents duly self attested by which they/he is qualifying the Qualifying criteria mentioned in the Tender Document
The accepted rates should be deemed to include all taxes direct or indirect including Income Tax leviable under Central/State or Local Bodies Act or Rules
Annexure IX Details of Bank Particulars.
Annexure-III : Constitution of the Firm with required document copies i.e. Joint Venture/ Partnership Deed(s), Incorporation of Company, etc.
Please enter the percentage of local content in the material being offered. Please enter 0 for fully imported items, and 100 for fully indigenous items. The definition and calculation of local content shall be in accordance with the Make in India policy as incorporated in the tender conditions.
Payment towards the EMD (Earnest Money Deposit) as indicated in the NIT header should be paid only through the E-Payment facility (i.e.) Net banking or Payment Gateway provided in the IREPS web portal.
Tenderers shall hold the offer open for acceptance for a minimum period of 60 days from the date of opening of the tender.
If the date of opening of tender is declared a holiday at a later date, the tenders will be opened on the next working day.
Cost of Tender form amount once paid is non-refundable.
E-Tender Shall be rejected if it is not accompanied by [1] Cost of Tender Document [2] EMD.
GST: It may please be noted that the supplier of Goods and/or services for the said tender/agreement, would be subject to GST Act and rules as applicable from time to time.
Tenderers will examine the various provisions of The Central Goods and Services Tax Act, 2017 (CGST)/ Integrated Goods and Services Tax Act, 2017 (IGST)/ Union Territory Goods and Services Tax Act, 2017 (UTGST)/ respective state's State Goods and Services Tax Act (SGST) also, as notified by Central/State Govt & as amended from time to time and applicable taxes before bidding. Tenderers will ensure that full benefit of Input Tax Credit (ITC) likely to be availed by them is duly considered while quoting rates.
The successful tenderer who is liable to be registered under CGST/ IGST/ UTGST/ SGST Act, shall submit GSTIN along with other details required under CGST/ IGST/ UTGST/ SGST Act to Railway immediately after the award of contract, without which no payment shall be released to the Contractor. The Contractor shall be responsible for deposition of applicable GST to the concerned authority.
In case the successful tenderer is not liable to be registered under CGST/IGST/UTGST/SGST Act, the Railway shall deduct the applicable GST from his/their bills under reverse charge mechanism (RCM) and deposit the same to the concerned authority.
Before submitting a tender, the tenderer will be deemed to have satisfied himself by actual of the site and locality of the works, that all conditions liable to be encountered during the execution of the works are taken into account and that the rates he enters in the tender forms are adequate and all inclusive to accord with the provisions in clause-37 of the IRSGCC for the completion of works to the entire satisfaction of the Engineer.
The option of payment through Letter of Credit has been enabled for all tenders whose value is equal to or greater than Rs.10 Lakhs. Necessary instructions/ conditions are incorporated as condition No.67 in the tender document part A to C.
Unreleased EMD, if any, held with the Railway Administration, shall not be adjusted towards the EMD to be remitted.
Discharged instruments towards EMD of other tenders will not be accepted.
Tenderers must upload details of all works on hand with them in Railways, other public sector undertakings and private sector undertakings in the proforma (ANNEXURE-IV) while submitting their offers.
All terms and conditions in the tender documents are binding on the tenderers. Manual tenders sent by Post/FAX/Courier or in Person SHALL NOT BE ACCEPTED.
The tenderers are advised to visit the site of work in their own interest and acquaint themselves with the site conditions and expected quantum of work. Tenderer should refer for Special Conditons General & Technical, which are attached to the tender document in Documents attached to the tender. These special conditions form part of the tender document and will supplement to the conditions of tender already submitted by the tenderer, IRSGCC along with updated correction slips, IRUSSR. Where are provisions of these special conditions are at variance with IRSGCC and other documents mentioned above, these Special Conditions shall prevail.
Tenderer may please note that offers received without requisite/ mandatory documents as mentioned above, will be considered as invalid tender and for which contractor shall have no claim on Railway.
The tenderers may note that the Railway reserves its right to either accept or reject any Bid/s without assigning any reasons whatsoever and tenderers shall have no claims on this account.
IF THE TENDERER/S DELIBERATELY GIVES WRONG INFORMATION/ CREDENTIALS/DOCUMENTS IN HIS/THEIR TENDERS AND THEREBY CREATE S CIRCUMSTANCES FOR ACCEPTANCE OF HIS/THEIR TENDER, RAILWAY RESERVES THE RIGHT TO TERMINATE THE CONTRACT AT ANY STAGE, BESIDES, BANNING OF BUSINESS FOR FIVE YEARS ON ENTIRE IR .
The contractors operations and proceedings in connection with the works shall at all times be conducted during the continuance of contract in accordance with the laws, ordinance, rules and regulations for the time being in force and the contractor shall further observe and comply with the bye-laws and regulations of the Govt. of India, State Govt. and of Municipal other authorities having jurisdiction in connection w ith the works or site over operations such as these are carried out by the contractor/s and shall give all notice required by such bye-laws and regulations. The Hospital and medical regulations in force for the time being shall also be complied with by the contractor/s and his workmen.
The contractor shall be responsible for the observance of the rules and regulations under the mines act and mineral rules and Indian Metallurgical rules and regulations of State/Central Govt. concerned as amended from time to time.
Contractor shall at all times keep the railway administration indemnified against all penalties that may be imposed by the Govt. of India or State Govt. for infringements or any of the clauses of the mines act and rules made there under in respect of quarries from which the ballast for these works is procured.
All documents related to MOU or Joint Venture/Agreement/Consortium should be uploaded at the time of submission of bid as per Form given in Annexure XIV and XV, Form JV-3 & JV-4. Original documents related to above should be submitted to the office of the Chief Administrative Officer, Construction, Southern Railway, E.V.R. High Road, Egmore, Chennai-600 008 within ten working days from the closing date of closing failing which the tender liable to be rejected.
All documents in support of fulfillment of eligibility criteria should be uploaded along with the tender. Tenders without documentary evidence in support of eligibility criteria will be summarily rejected. No post tender correspondence will be permitted and the tender shall be decided based on the documents submitted/attached with the offer only. However Railway reserves the right to verify/seek for any clarification on the documents/credentials already submitted by the tenderer along with the offer.
Railway reserves the right to accept or reject any or all the tenders and to award the work in whole or in part without assigning the reason for any such action. The General Conditions of Contract governing the performance of the works covered by this tender are the Indian Railway Standard General Conditions of Contract as amended from time to time up to date. A soft of copy of the Indian Railway Standard General Conditions of Contract is uploaded in the annexed documents to the tender. Hard copy may be perused in the office of the Chief Administrative Officer/Construction/Southern Railway/Egmore/Chennai - 600 008. In submitting his tender it would be deemed that the tenderer has kept himself fully informed of the provision of the IRS General Conditions of Contract including all corrections and Amendments issued up to date and claim that he is not aware of any amendment or correction slip to the IRS GCC shall not be entertained.
Proposed Construction of Pedestrian Subway for Br No: A40B 1x4.50x2.75 With Pre-Cast RCC Box in lieu of LC No.11 at km: 12/400-500 in addition to ROB Between Peelamedu and Coimbatore North Stations- Balance works (RCC Segment Boxes erection by Crane and using Temporary Girder)
03-DCE-CN-SA-2026
03-DCE-CN-SA-2026
Open
Works - General
6 Months
Salem, Tamil Nadu
₹0
₹2.0 L
20 Apr 2026
28 Mar 2026
6 Apr 2026
47 items across 6 schedules · ₹96,53,867.27 total
| # | Description | Unit | Qty | Rate | Amount |
|---|---|---|---|---|---|
| Provision of barricading with contractor's bamboos / ballies vertical post of 100mm dia. planted at every 2m interval, projecting at least 1.5m above ground level and driven firmly (minimum 0.5m) inside ground and including painting verticals & horizontals with red luminous paints / strips at alternative bay on barricade. Barricades shall be maintained through out the execution of the work and shall be removed in workman like manner on completion of the work only after instruction of Engineer in-Charge. Note: (1) 60% payment shall be made on provision of barricading at work-site and balance 40% payment after removal of barricades. (2) The released bamboos / ballies shall be the property of the Contractor. | — | — | — | — | |
| 1 | With 3 horizontal bamboo / balli members of minimum 50mm dia. spaced equally | RM | 100.00 | 179.41 | 17,941 |
| Earthwork in excavation by mechanical means (Hydraulic Excavator)/Manual Means for foundations and floors of the bridges, retaining walls etc. including setting out, dressing of sides, ramming of bottom, getting out the excavated material, back filling in layers with approved material and consolidation of the layers by ramming and watering etc. including all lift, disposal of surplus soil up to a lead of 300m, all types of shoring and strutting with all labour and material complete as per drawing and technical specification as directed by Engineer in charge. Note: This item will be used for excavation work in connection with other miscellaneous works also like side drains, foundation for OHE masts and other miscellaneous structures in connection with Gauge Conversion, Doubling, New lines. | — | — | — | — | |
| 2 | All kinds of soils | cum | 713.40 | 211.33 | 1,50,762.82 |
| 3 | Soft rock (not requiring blasting) | cum | 171.22 | 444.28 | 76,069.62 |
| Centering and shuttering including strutting, propping etc. and removal of form for : | — | — | — | — | |
| 4 | All types of bridge sub-structures, e.g. pier, abutment, wing wall, retaining wall, RCC box type foundations, Abutment cap, Pier Cap, Inspection Platform & Pedestal over Pier cap, Fender wall, Diaphragm wall etc. up to 5m above ground level | Sqm | 124.79 | 765.08 | 95,474.33 |
| 5 | Providing cast in situ bridge number plaques as per Railway drawing in cement concrete 1:2:4 mix using 20mm hard stone aggregate embedded in 30mm notch in Bridge parapet coping duly engraving the letter and figures and an arrow indicating the direction of flow and finishing the top exposed surface with cement mortar 1:3, painting letters and figures with two coats of black enamel paint on two coats of white background with all labour, tools, cement, paint etc. with all leads and lifts. | Each | 2.00 | 1,001.17 | 2,002.34 |
| 6 | Dewatering of natural or accumulated water from any location. Payment to be done for Horse power of pump multiplied by pumping hours. | HP Hour | 100.00 | 74.78 | 7,478 |
| Manufacturing and Supply of Alumino thermic welding portions of 52Kg/60 Kg/60EI-R260 as approved by RDSO for welding of rails 52Kg/60Kg/60EI-R260 kg for 25mm gap by the process of AT welding along with complete accessories confirming to the specification laid down in Indian Railway Standard specification No.IRST-19-2020 up to date correction slips with Single shot crucible fitted with Automatic Tapping Thimble, 3 pieces pre fabricated mould (Zircon washed) manually pressed using compressed air petrol/LPG pre heating for execution of welding of rail joint as directed by the engineer in charge at site. Note: 1. The accessories along with welding portion shall be supplied as per Annexure-I of the IRUSSOR - 2021. 2. Rate is inclusive of transportation of above to SSE/P.Way stores. | — | — | — | — | |
| 7 | For 60Kg 90 UTS Rails | Each | 16.00 | 3,289.64 | 52,634.24 |
| Providing Caution Watchman at a location where caution order is imposed and ensuring to be on continuous vigil and exhibit necessary hand signals to the trains for their passage over caution spot. Note: 1) Prescribed protection equipment shall be supplied by Railways and the same shall be returned after work is over. 2) If Contractor fails to post watchman at any time during one day, penalty at double the accepted rates will be levied and 3) The watchman nominated by the contractor will be screened for suitability as per Railway norms. | — | — | — | — | |
| 8 | For one shift ( 12 Hrs) | Each | 20.00 | 1,324.83 | 26,496.6 |
| 9 | Providing Rail Barricading with rails supplied by Railways with verticals provided at every 1.5m interval, height of barricade being up to 1.5m above ground / termination level and one or more row of horizontal rail, duly cutting rails and drilling holes as required, assembling necessary accessories to required length, including earthwork excavation for foundation, fixing posts in cement concrete 1:3:6 base of size 0.45m x 0.45m x 0.60m and one coat of red oxide painting of steel work. Note: 1. Excavation and concrete work will be paid separately. 2. Rail shall be made available within 250 metres | MT | 10.00 | 1,801.21 | 18,012.1 |
| 10 | Manufacturing and using wooden sleepers/blocks required for matting and bearing as per approved design for use below and above CC Crib for insertion of Temporary Girder etc.. Note: The item is for one time use and released wooden sleepers/blocks shall be the property of the Contractor. | cum | 15.00 | 2,689.62 | 40,344.3 |
| 11 | Manufacture of flared portion of Guard Rail by cutting and bending to required shape & RDSO's approved drawings. Note: (1) Rails shall be supplied by Railways. (2) One set consists of two rails i.e. both left and right. | Set | 1.00 | 4,869 | 4,869 |
| 12 | Providing and fixing of flared portion of guard rails of any rail section over PSC sleepers including fixing of with all fittings, including leading of rails and fittings, squaring and adjusting spacing of sleepers as required, providing nose blocks duly cutting wooden blocks supplied by railways and fixing it with bolts of 16mm dia as directed complete and finished as per RDSO's approved drawing. Note: 1.One set consists of LH & RH side rails of one end. 2.Required P.Way fittings will be supplied at SSE stores depot. | Set | 1.00 | 4,064.12 | 4,064.12 |
| 13 | Drilling holes 25mm to 40mm dia. with drill twist in the foot of guard rails for fixing guard rails on bridge as directed. | Each | 44.00 | 77.31 | 3,401.64 |
| 14 | Drilling of 25mm to 40mm dia. holes in PSC sleepers with suitable rotary hammer / drilling machine at indicated location for fixing of guard rails on bridges & its approaches as per approved drawing and fixing of contractor's HDPE dowels and adhesive of approved quality to Drawing no. RDSO/T-3002, procured from RDSO's approved sources with contractor's materials and consumable. | Each | 10.00 | 262.36 | 2,623.6 |
| Hiring of machinery for minor miscellaneous works for short duration including operator/driver, fuel, lubricants and consumable. The contractor shall arrange all statutory permits as required by rules and regulations prevailing in the area of work. Payment shall be made for actual working hours at site. | — | — | — | — | |
| 15 | JCB Backhoe Loaders 3DX Plus or similar with minimum 1.10 cum bucket capacity | Hour | 50.00 | 867.49 | 43,374.5 |
| Schedule total | ₹5,45,548.21 | ||||
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
HTML
nit.pdf
NIT
CBF-PLMDLC11GADTADapproved.pdf
ATTACHMENT
GCCACS11dt13032026.pdf
ATTACHMENT
LISTOFLABORATORIES_DyCE_W_CN_MS.pdf
ATTACHMENT
Additionalinstructionstobidderspdf.pdf
ATTACHMENT
ScopeofWorkwithMilestoneLC11_merged.pdf
ATTACHMENT
Contractore-mBook.pdf
ATTACHMENT
SinglePacketPartAtoC1.pdf
ATTACHMENT
Clarification of Annexure V of GCC
ATTACHMENT
PPEforsafetyinconstructionsite_1.pdf
ATTACHMENT
Registersatworksite.pdf
ATTACHMENT
GCC-2022-ACS10_merged_compressed.pdf
ATTACHMENT
2024_05_14ClarificationonsubmissionofAnnexure-V.pdf
ATTACHMENT
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .