| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹12.0 LAccepted-AOC | ₹12.0 L | L1 | Accepted-AOC L1 |
| 2 | L2₹13.0 LRejected-AOC | ₹13.0 L | L2 | Rejected-AOC L2 |
| 3 | L3₹14.1 LRejected-AOC GRAM SHAHAJHPUR NINAIYAN TEHSIL AKBARPUR KANPUR DEHAT 209115 | KANPUR DEHAT | UTTAR PRADESH | 209115 | ₹14.1 L | L3 | Rejected-AOC L3 |
| Sl No | Description | Qty | Unit | M/S GARIB NAWAJ AND COMPANY L3 | M/S G S D B K TRADERS L2 | M/S HARSH CONSTRUCTIONS L1 |
|---|---|---|---|---|---|---|
| 1.00 | Earth work in Excavation of foundation in ordinary soil/sandy, loam, clay or sand i/c lift up to 1.5 M. and lead upto 30 m. i/c back filling, watering, ramming of excavated earth in to the trenches or up to the space and sides of the foundation. | 114.7 | M³ | 100 ₹11,470 | 77.95 ₹8,940.87 | 71.48 ₹8,198.76 |
| 2.00 | Providing and Laying C.C. in M-15(1:2:4) mix with aggrigate size 10 to 20 mm and coarse sand i/c cost of all material, labour and T&P etc complete. | 11.95 | M³ | 5,000 ₹59,750 | 6,469.14 ₹77,306.22 | 5,932.4 ₹70,892.18 |
| 3.00 | Providing and Laying C.C. in M-20 (1:1.5:3) mix with aggrigate size 10 to 20 mm and coarse sand i/c cost of all material, labour and T&P etc complete. | 26.4 | M³ | 8,000 ₹2,11,200 | 7,608.75 ₹2,00,871 | 6,977.46 ₹1,84,204.94 |
| 4.00 | Providing and Laying R.C.C. in M-20 (1:1.5:3) mix with aggrigate size 10 to 20 mm and coarse sand i/c cost of all material, labour and T&P etc complete. | 56.65 | M³ | 8,000 ₹4,53,200 | 7,608.75 ₹4,31,035.69 | 6,977.46 ₹3,95,273.11 |
| 5.00 | C.C work in M-25 (1:1:2) mix with stone grit size 10 to 20 mm and coarse sand i/c cost of all material, labour and T&P etc complete. | 2.4 | M³ | 8,000 ₹19,200 | 8,388.27 ₹20,131.85 | 7,700.07 ₹18,480.17 |
| 6.00 | Earth work in making Road diversion i/c all lead, lift labour and T&P etc. complete. | 1,834 | M³ | 8 ₹14,672 | 52.53 ₹96,340.02 | 48.17 ₹88,343.78 |
| 7.00 | Centering Shuttering for CC work with cost of all material, labour and T&P etc. complete. | 222.7 | M² | 1,000 ₹2,22,700 | 660.89 ₹1,47,180.2 | 606.06 ₹1,34,969.56 |
| 8.00 | S/E Wheel gaurd with cost of wheel gaurd, labour and T&P etc. complete. | 4 | No. | 2,000 ₹8,000 | 700 ₹2,800 | 707.07 ₹2,828.28 |
| 9.00 | Earth work in excavation of diversion channel, Removing of Bundha & Road diversion i/c all lead, lift, labour and T&P etc. complete. | 979 | M³ | 8 ₹7,832 | 50 ₹48,950 | 48.17 ₹47,158.43 |
| 10.00 | Hiring of 5 H.P. Diesel pump set i/c operator, POL etc. complete. | 180 | Hour | 350 ₹63,000 | 127.1 ₹22,878 | 116.55 ₹20,979 |
Tender Value
₹16 L
EMD Value
₹1.6 L
Closing Date
27 Jan 2026, 12:00 pmClosed
EXECUTIVE ENGINEER
EXECUTIVE ENGINEER IRRIGATION DIVISION NEAR NUMISE CHAURAHA ETAWAH
Reconstruction of V.R.B. at Km. 2.150 Lohiya Drain in Distt. Etawah
2026_UPIDC_1107696_1
05/EE/2025-26
Open Tender
Civil Works - Others
45 days
Etawah
Please Refer Tender Document
2 documents required · 2 mandatory
₹354
₹1.6 L
19 Feb 2026
20 Jan 2026
27 Jan 2026
20 Jan 2026
27 Jan 2026
20 Jan 2026
Earth work in Excavation of foundation in ordinary soil/sandy, loam, clay or sand i/c lift up to 1.5 M. and lead upto 30 m. i/c back filling, watering, ramming of excavated earth in to the trenches or up to the space and sides of the foundation.
Providing and Laying C.C. in M-15(1:2:4) mix with aggrigate size 10 to 20 mm and coarse sand i/c cost of all material, labour and T&P etc complete.
Providing and Laying C.C. in M-20 (1:1.5:3) mix with aggrigate size 10 to 20 mm and coarse sand i/c cost of all material, labour and T&P etc complete.
Providing and Laying R.C.C. in M-20 (1:1.5:3) mix with aggrigate size 10 to 20 mm and coarse sand i/c cost of all material, labour and T&P etc complete.
C.C work in M-25 (1:1:2) mix with stone grit size 10 to 20 mm and coarse sand i/c cost of all material, labour and T&P etc complete.
Earth work in making Road diversion i/c all lead, lift labour and T&P etc. complete.
Centering Shuttering for CC work with cost of all material, labour and T&P etc. complete.
S/E Wheel gaurd with cost of wheel gaurd, labour and T&P etc. complete.
Earth work in excavation of diversion channel, Removing of Bundha & Road diversion i/c all lead, lift, labour and T&P etc. complete.
Hiring of 5 H.P. Diesel pump set i/c operator, POL etc. complete.
Providing Cutting, Bending, Binding and placing in postion of Reinforcement i/c cost of all material, labour and T&P etc. complete.
Finishing wall with Acrylic smmoth exterior paint of required shade: new work ( Two or more coats applied @ 1.13 ltr/10sqm over and i/c priming coat of exterior primer applied @ 2.20 kg/ 10sqm) i/c curing and cost of all material labour T&P etc proper completion of work.
stage.html
html • 0.04 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 3.25 MB
BOQ_2044364.xls
BOQ • 0.29 MB
Download all tender documents and submit your bid