Executive Engineer
Executive Engineer O M UEDC Angalakuruchi
Running works contract for the Erection works for HT Overhead feeder, LT Overhead feeder, Structure Erection works and Dismantling works for EOS to Normal AGGL Services, TATKAL AGGL Services, SFS AGGL Services etc..in Vettikaranpudur section.
2026_EB_638953_1
EE/ O M/AKI/ 21 /25-26
Open Tender
Electrical Works
Works
Angalakuruchi
Please refer Tender documents.
2 documents required · 2 mandatory
₹0
₹3,000
Yes
3 Jan 2026
3 Jan 2026
19 Jan 2026
3 Jan 2026
17 Jan 2026
3 Jan 2026
Excavation of Pole pits for pole upto 8.00mm length by using JCB/Manual
Excavation of Pole pits for pole above 8.00mm length by using JCB/Manual
Excavation of Pole pits for pole in rocky area (common to all size of poles) by blasting / Manual
Excavation for Stay pit 4.5' to 5' depth using JCB /Manual
Excavation & Backfilling of Stay Pit per location - Hard rock without blasting
Erection of REC/RCC/PSC pole upto 8.0 m length using Crane/Manual
Erection of REC/RCC/PSC pole above 8.0 m length using Crane/Manual
Erection of metal supports above 9.0m / RSJ/Rail pole/Tubular
Erection of Stay set complete with fixing up stay wire, Eye Bow, Guy Shackle binding etc.,
Erection of Additional Stay in the same Stay Rod excluding excavation of Stay pit and burrial of stay rod
Erection of Stay set complete including excavation of Stay pit in the Rock area by blasting with fixing of Stay wire, eye, bow, Guy Shackle, Binding etc.,
Replacement of Stay rod only (including stay pit excavtion refilling and erection)
Replacement of Guy shackle only in existing stay
Fixing of LT 3 Ph Cross Arm
Fixing of LT 1 Ph Cross Arm
Fixing of V Cross Arm 3.5 Feet
Fixing of V Cross Arm 4.5 Feet
Fixing of HT/LT TI Fitting
Fixing of Double Channel cross Arm
Fixing of Guarding X Arm
Fixing of Tapping channel cross Arm
Fixing of Two Tapping cross arm per cut point upto 33KV line including fixing of Discs, Insulators and Jumbering etc
Fixing of HT PIN Insulator with pin 11KV
Fixing of HT PIN Insulator with pin 22KV
Fixing of HT PIN Insulator with pin 33KV
Fixing of LT Pin insulator
Fixing of HT Strain disc 11KV
Fixing of HT Strain disc 22KV
Fixing of HT Strain disc 33KV
Fixing of LT Shackle with Hardwares
Fixing of Alumium Knob
Fixing of HT LAS (3 Nos)
Fixing of LT LAS (3 Nos)
Fixing of open type fuse unit arrangements
Providing of line spacers in LT lines 1 phase
Providing of line spacers in LT lines 3 phase
Paving and stringing of conductors of sizes upto 7/2.59mm ACSR or other equivalent conductor
Paving and stringing of conductors of sizes above 7/2.59mm ACSR or other equivalent conductor upto 7/3.35mm ACSR or other equivalent conductor
Paving and stringing of conductors of 7/4.09 mm ACSR or other equivalent conductor
Resagging of lines for All sizes at cutpoint location per wire /span
Earthing of Poles with GI wires 4 or 6 SWG by coil earthing
Concreting with 1:4:8 mix using 40 mm Jelly including curing (Material + Labour) Sleeve Concreting per pole
Mass Concreting of poles
Stay Concreting
Erection of Distribution Transformer structure as per TNEB standard including painting, feeders arrangement, color washing of RCC Poles etc., Fixing of poles type to be unit LT/HT LAS and Jumbering 3 Nos Earth pits with earth through except erection of Distribution Transformer. (Data as per Annexure II)
Erection of Distribution Transformer including loading of Distribution Transformer at stores and Erection of Stucture or vice versa upto 25KVA Distribution Transformer/ Metering Set
(ii) Above 25 KVA to 100 KVA
(iii) Above 100 KVA to 250 KVA
(iv) 500 KVA and Above
(v) Failed DT replacement below 100 KVA
(v) Failed DT replacement 100 KVA and Above
Erection of 11 KV Single pole Structure including erection of DT Complete without centre support. (Data as per Annexure III)
Erection of 11 KV Single pole Structure including erection of DT Complete with centre support. (Data as per Annexure III)
Erection of DP structure with stay as per TNEB standard including fixing of top channel, cross bracing, concreting, painting, colour washing etc. - With 22 / 33 KV AB switch using all types of poles of size 9 m and above length
Provision of guarding with two numbers earth pits excluding stay set erection - flat guarding with earth pit
Split neutral
Loading of REC/ RCC/PSC/Metal Pole upto 8.00m length
Loading of REC/ RCC/PSC/Metal Pole above 8.00m length
Loading of Metal poles all sizes
Unloading of REC/ RCC/PSC/Metal Pole upto 8.00m length
Unloading of REC/ RCC/PSC/Metal Pole above 8.00m length
Unloading of Metal poles all sizes
Loading or unloading of Distribution Transformer Upto 100 KVA
Loading or unloading of Distribution Transformer Above 100 KVA and upto 500 KVA
Loading / Unloading of line materials
Loading / Unloading of 11 KV strain disc
Loading / Unloading of LT Pin insulator shackle, guy shackle, LT Pin, Metal parts, HT pin etc.,
Transportation of all type of poles by bullock cart or other vehicle (for all sizes of poles including loading and unloading) For a lead upto 5 KM
Transportation of all type of poles by bullock cart or other vehicle (for all sizes of poles including loading and unloading ) Above 5 KM of lead of every KM
Transportation of all sizes of poles and other associated materials from road side to pole pit and vice versa upto 0.5 Km
Transport of Conductors of all sizes from Road side to pit locations upto 1 KM of Conductor
Transport of Distribution Transformer/Line Materials from sub stores to office/site upto 10 KM distance by engaging 1 Ton capacity Minidor (Lorry)
Transport of Distribution Transformer/Line Materials from sub stores to office/site above 10 KM distance by engaging 1 Ton capacity Minidor (Lorry)
Dismantling of RCC, RCC, PSC metal poles all sizes 7.5m /8.0m /9.0m / 9.14m poles(RCC/PSC) including the closing of the pit
Dismantling Stay set complete including stay rod
Dismantling Stay set complete including without stay rod
Dismantling of Double channel X Arm
Dismantling of Guarding X Arm
Dismantling of Tapping channel cross Arm
Dismantling of 11 KV pin with insulator
Dismantling of 11KV composite Disc with MP
Dismantling of 22 KV pin with insulator
Dismantling of 22 KV composite Disc with MP
Dismantling of 1372 mm (4'6'' V X Arm)
Dismantling of 1068 mm (3'6'' V X Arm)
Dismantling of HT /LT TI fitting
Dismantling of 3 ph X Arm
Dismantling of 1 ph X Arm
Dismantling of Aluminium Knob
Dismantling of LT Shackle with Mp
Dismantling of LT Pin with Insulator
Dismantling of LT Open Type
Dismantling of metering set 11KV/22 KV/33KV
Dismantling of DT below 200KVA
Dismantling of DT 200KVA and above upto 500KVA
Dismantling of HT LAS (3 nos)
Dismantling of LT LAS (3 nos)
Dismantling of Cross arm clamps TI fitting hardwares, insulators, etc.,
Dismantling of conductor upto 7/3.35mm including transporting the conductors to the nearest road side and stocking of coils
Dismantling of conductor above 7/3.35mm including transporting the conductors to the nearest road side and stocking of coils
Releasing and reerection (resagging) of one run of all sizes of conductor
Releasing and Erection of 1 Ph SC wire (During conductor or Support Change
Releasing and Erection of 3 Ph SC wire (During conductor or Support Change
Dismantling of Transformer structure materials complete set and transporting the same from the location to the road side
Numbering of poles including base painting and with cost of paint
Manufacturing / Altering of Clamps
Drilling of holes in the structure materials clamps etc.,
AB switch or open type side arm stud, cutting and drilling holes
Clearing tree branches of Coconut tree
Clearing tree branches of Neem, tamarind, country tree etc.,
Leveling of Ground using Bul Dozer
Clearing of Branches / Trees with JCB
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.63 MB
Tendernotice.pdf
Tender Documents • 0.62 MB
BOQ_764729.xls
BOQ • 0.43 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .