| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹30.4 LAccepted-AOC | L1 | Accepted-AOC technically qualified and quoted lowest amount | |
| 2 | L2₹30.5 L+₹1,663.56 (0.05%)Rejected-Finance | L2 | Rejected-Finance QUOTED HIGHER RATE THAN L1 | |
| 3 | L3₹32.2 L+₹1.8 L (5.92%)Rejected-Finance | L3 | Rejected-Finance QUOTED HIGHER RATE THAN L1 | |
| 4 | L4₹33.0 L+₹2.5 L (8.26%)Rejected-Finance | L4 | Rejected-Finance QUOTED HIGHER RATE THAN L1 | |
| 5 | L5₹34.0 L+₹3.6 L (11.7%)Rejected-Finance GRAM JAIPUR PO SARWA TEHSIL SANDILA DISTRICT HARDOI | L5 | Rejected-Finance QUOTED HIGHER RATE THAN L1 |
| Sl No | Description | Qty | Unit | Raj Boux Yadav L3 | ATUL CONSTRUCTION L2 | VARCHASVA INFRATECH L1 | M/S. DURJAN CONTRATOR L5 | SRI VAMDEVAY ENTERPRISES L4 | SUMAN TIWARI CONTRACTOR L6 |
|---|---|---|---|---|---|---|---|---|---|
| 1.00 | Ordinary jungle clearance with all labour, T& P etc. required for proper completion of work as per direction of Engineer-in-Charge. | 8,820 | Sqm | 2 ₹17,640 Lowest | 3.24 ₹28,576.8 | 3.36 ₹29,635.2 | 2 ₹17,640 Lowest | 4 ₹35,280 | 4.01 ₹35,368.2 |
| 2.00 | Ploughing the existing ground to a depth of 15 cm to 25 cm and watering the same in all kinds of soil | 8,820 | Sqm | 8 ₹70,560 Lowest | 13.11 ₹1,15,630.2 | 13.57 ₹1,19,687.4 | 8 ₹70,560 Lowest | 11 ₹97,020 | 14.7 ₹1,29,654 |
| 3.00 | Dressing of excavated earth including all labour ,T&P etc complete | 1,323 | Cum | 8 ₹10,584 | 8.24 ₹10,901.52 | 8.53 ₹11,285.19 | 5 ₹6,615 Lowest | 10 ₹13,230 | 9.6 ₹12,700.8 |
| 4.00 | Dismantling of existing plaster including disposal of refuse as per direction of Engineer-in-Charge within a distance of 60 m. | 1,218.66 | Sqm | 35 ₹42,653.1 | 28.17 ₹34,329.65 | 78.92 ₹96,176.65 | 20 ₹24,373.2 Lowest | 38 ₹46,309.08 | 32.4 ₹39,484.58 |
| 5.00 | Racking out joints of brick work in cement or lime mortar and preparing the surface for Re-Plastering including disposal of refuse to the Dumping Ground all complete as directed by the Engineer in charge. | 1,218.66 | Sqm | 15 ₹18,279.9 Lowest | 17.86 ₹21,765.27 | 18.49 ₹22,533.02 | 20 ₹24,373.2 | 20 ₹24,373.2 | 20.6 ₹25,104.4 |
| 6.00 | Demolising lime concrete manually/ by mechanical Means and disposal of material with in 50 mts lead as per direction by the Engg-in-charge | 25.48 | Cum | 350 ₹8,918 Lowest | 368.51 ₹9,389.63 | 381.38 ₹9,717.56 | 500 ₹12,740 | 375 ₹9,555 | 437.38 ₹11,144.44 |
| 7.00 | Demolishing Cement concrete manually/ by mechanical Means including disposal of material with in 50 mts lead as per direction by the Engg-in-charge.(Nominal Concrete 1:3:6) | 9.02 | Cum | 1,200 ₹10,824 | 1,055.23 ₹9,518.17 | 1,092.1 ₹9,850.74 | 1,200 ₹10,824 | 950 ₹8,569 Lowest | 1,238.02 ₹11,166.94 |
| 8.00 | Demolishing Brick work in cement mortar manually/ by mechanical Means including stacking of serviceable material disposal of Unserviceable material with in 50 mts lead as per direction by the Engg-in-charge. | 7.43 | Cum | 950 ₹7,058.5 | 891.18 ₹6,621.47 | 922.31 ₹6,852.76 | 1,100 ₹8,173 | 850 ₹6,315.5 Lowest | 1,045.38 ₹7,767.17 |
| 9.00 | Dismantling Doors, Windows, and Clerestory windows (steel or wood)shutter including chowkhats, architrave, hold fast etc. complete and stacking with in 50 M lead | 28.32 | Sqm | 200 ₹5,664 | 166.53 ₹4,716.13 | 172.35 ₹4,880.95 | 140 ₹3,964.8 Lowest | 150 ₹4,248 | 195.05 ₹5,523.82 |
| 10.00 | Earth Work in Excavation by Mechanical means/Manual means in foundation, trenches (Not exceding 10 sqm in plan) excavated Soil and disposal of surplus excavated soil as directed within lead of 50 m, including dressing of Sides and ramming of bottom lift upto 1.5 m | 259.12 | Cum | 110 ₹28,503.2 | 135.34 ₹35,069.3 | 140.07 ₹36,294.94 | 100 ₹25,912 Lowest | 165 ₹42,754.8 | 158.78 ₹41,143.07 |
Tender Value
₹45.3 L
EMD Value
₹90,600
Closing Date
27 Aug 2026, 1:00 pmClosed
SE SIX CIRCLE LUCKNOW
SE SIX CIRCLE LUCKNOW
Narauna nirikshan bhawan ke punrodhwar ka karya
2026_UPIDC_1178280_8
04/SE-6/2026-27
Open Tender
Civil Works
Item Rate
180 days
Lucknow
please refer tender documents
2 documents required · 2 mandatory
₹2,714
₹90,600
SE Six circle lucknow
26 Sept 2026
20 Aug 2026
27 Aug 2026
20 Aug 2026
27 Aug 2026
20 Aug 2026
20 Aug 2026
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Ordinary jungle clearance with all labour, T& P etc. required for proper completion of work as per direction of Engineer-in-Charge. | 8,820 | Sqm | - | - |
| 2 | Ploughing the existing ground to a depth of 15 cm to 25 cm and watering the same in all kinds of soil | 8,820 | Sqm | - | - |
| 3 | Dressing of excavated earth including all labour ,T&P etc complete | 1,323 | Cum | - | - |
| 4 | Dismantling of existing plaster including disposal of refuse as per direction of Engineer-in-Charge within a distance of 60 m. | 1,218.66 | Sqm | - | - |
| 5 | Racking out joints of brick work in cement or lime mortar and preparing the surface for Re-Plastering including disposal of refuse to the Dumping Ground all complete as directed by the Engineer in charge. | 1,218.66 | Sqm | - | - |
| 6 | Demolising lime concrete manually/ by mechanical Means and disposal of material with in 50 mts lead as per direction by the Engg-in-charge | 25.48 | Cum | - | - |
| 7 | Demolishing Cement concrete manually/ by mechanical Means including disposal of material with in 50 mts lead as per direction by the Engg-in-charge.(Nominal Concrete 1:3:6) | 9.02 | Cum | - | - |
| 8 | Demolishing Brick work in cement mortar manually/ by mechanical Means including stacking of serviceable material disposal of Unserviceable material with in 50 mts lead as per direction by the Engg-in-charge. | 7.43 | Cum | - | - |
| 9 | Dismantling Doors, Windows, and Clerestory windows (steel or wood)shutter including chowkhats, architrave, hold fast etc. complete and stacking with in 50 M lead | 28.32 | Sqm | - | - |
| 10 | Earth Work in Excavation by Mechanical means/Manual means in foundation, trenches (Not exceding 10 sqm in plan) excavated Soil and disposal of surplus excavated soil as directed within lead of 50 m, including dressing of Sides and ramming of bottom lift upto 1.5 m | 259.12 | Cum | - | - |
stage.html
html • 0.06 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 3.43 MB
BOQ_2214227.xls
BOQ • 0.39 MB
tendocLot8Narauna.pdf
Tender Documents • 2.70 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .