Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹3.0 CrAccepted-AOC | ₹3.0 Cr | L1 | Accepted-AOC L1 |
| 2 | L2₹3.5 Cr+₹50.2 L (16.7%)Rejected-AOC NAYA GAON CHANDPUR BULANDSHAHAR UP | GONDA | UTTAR PRADESH | 271001 | ₹3.5 Cr+₹50.2 L (16.7%) | L2 | Rejected-AOC L2 |
| 3 | L3₹3.8 Cr+₹76.2 L (25.4%)Rejected-AOC | ₹3.8 Cr+₹76.2 L (25.4%) | L3 | Rejected-AOC L3 |
| 4 | L4₹3.8 Cr+₹76.3 L (25.4%)Rejected-AOC ALAMPUR FATEHPUR JANPAD ALIGARH | ALIGARH | UTTAR PRADESH | ₹3.8 Cr+₹76.3 L (25.4%) | L4 | Rejected-AOC L4 |
| 5 | Not Admitted-Fee/PreQual/Technical NA | NA | NA | 121004 | - | - | Not Admitted-Fee/PreQual/Technical Not Complied with technical specification |
| Sl No | Description | Qty | Unit | M/S GEE PEE ASSOCIATES L1 | BHAMAR SINGH L4 | M/S UNITE ENTERPRISES L2 | Arvind Kumar L3 |
|---|---|---|---|---|---|---|---|
| 1.00CC Lining in canal | |||||||
| 1.01 | Earth work in foundation in dry in ordinary soil including ramming and dressing the surface , including 1.50m. Lift 30m. Lead i/c filling watering excavated earth into the plinth . for proper complition of work. | 2,365.61 | Cum | 60 ₹1,41,936.6 | 70 ₹1,65,592.7 | 72 ₹1,70,323.92 | 50 ₹1,18,280.5 Lowest |
| 1.02 | Provide shuttering and centering including all materials and T&P etc for proper complition of work. | 2,862.72 | Sqm | 295 ₹8,44,502.4 Lowest | 700 ₹20,03,904 | 345 ₹9,87,638.4 | 400 ₹11,45,088 |
| 1.03 | C.C. work for sleeper cost of material and T & P etc. in 1 : 2: 4 including cost of all material,labour T&P etc. and Shuttering required for proper completion of work. | 217.06 | Cum | 6,170 ₹13,39,260.2 | 5,000 ₹10,85,300 Lowest | 8,150 ₹17,69,039 | 6,000 ₹13,02,360 |
| 1.04 | Supplying /filling Local Sand under CC lining as subgrade & filter i/c cost of all material,labour T&P etc required for proper completion of work. | 1,000.35 | Cum | 340 ₹3,40,119 | 500 ₹5,00,175 | 745 ₹7,45,260.75 | 300 ₹3,00,105 Lowest |
| 1.05 | Laying L.D.P.E. film i/c cost of scaffolding labour & t&P etc. | 11,450.5 | Sqm | 20 ₹2,29,010 | 60 ₹6,87,030 | 18.5 ₹2,11,834.25 | 5 ₹57,252.5 Lowest |
| 1.06 | 60 MM. Thick Lining in M20 (1:1.5:3) in bed and side slope including cost of all material,labour T&P etc. and Shuttering required for proper completion of work | 692.97 | Cum | 7,010 ₹48,57,719.7 | 6,500 ₹45,04,305 Lowest | 8,645 ₹59,90,725.65 | 8,000 ₹55,43,760 |
| 1.07 | Making Constraction /Contraction joint in C.C. lining in bed and side slope filling with sealing compound including cost of all material,labour,T&P etc required for proper completion of work | 3,181.25 | R.M | 20 ₹63,625 | 250 ₹7,95,312.5 | 45 ₹1,43,156.25 | 5 ₹15,906.25 Lowest |
| 2.00C.C lining in u/s and d/s of v.r.b/d.r.b of sarawa dy. | |||||||
| 2.01 | Earth work in foundation in dry in ordinary soil including ramming and dressing the surface , including 1.50m. Lift 30m. Lead i/c filling watering excavated earth into the plinth . for proper complition of work. | 824 | Cum | 60 ₹49,440 | 70 ₹57,680 | 72 ₹59,328 | 50 ₹41,200 Lowest |
Tender Value
₹4.2 Cr
EMD Value
₹8.5 L
Closing Date
6 Nov 2025, 12:00 pmClosed
SE
OFFICE OF SE MGCCC-1, MEERUT
01/SE/MRT/2025-26(LOT1)
2025_UPIDC_1087603_1
01/SE/MRT/2025-26
Open Tender
Civil Works
Item Rate
270 days
BULANDSHAHR
Please refer Tender documents.
2 documents required · 2 mandatory
₹2,354
₹8.5 L
Yes
9 Feb 2026
1 Nov 2025
6 Nov 2025
1 Nov 2025
6 Nov 2025
1 Nov 2025
stage.html
html • 0.05 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 1.22 MB
TDNIT01SEMRT.pdf
Tender Documents • 1.02 MB
BOQ_1994987.xls
BOQ • 0.28 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .