| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹9.8 LRejected-Finance C CLASS GOVT CONTRACTOR BELPAHAR DIST JHARSUGUDA | JHARSUGUDA | ODISHA | 768201 | ₹9.8 L | L1 | Rejected-Finance Price analysis not submitted in due time. |
| 2 | L2₹9.8 L+₹2,525.32 (0.26%)Rejected-Finance AT MUKHURA PO GOBINDAPUR PS REMUNA DIST BALASORE 756019 | BALESHWAR | ODISHA | 756019 | ₹9.8 L+₹2,525.32 (0.26%) | L2 | Rejected-Finance Rejected as L2 |
| 3 | L3₹10.0 L+₹20,202.58 (2.06%)Rejected-Finance AT PO BELPAHAR DIST JHARSUGUDA | JHARSUGUDA | ODISHA | 768201 | ₹10.0 L+₹20,202.58 (2.06%) | L3 | Rejected-Finance Rejected as L3 |
| 4 | L4₹11.0 L+₹1.2 L (12.5%)Rejected-Finance AT PO BELPAHAR | JHARSUGUDA | ODISHA | 768201 | ₹11.0 L+₹1.2 L (12.5%) | L4 | Rejected-Finance Rejected as L4 |
| 5 | L5₹12.6 L+₹2.8 L (28.5%)Rejected-Finance | ₹12.6 L+₹2.8 L (28.5%) | L5 | Rejected-Finance Rejected as L5 |
Tender Value
₹15 L
EMD Value
₹15,000
Closing Date
30 Mar 2026, 5:00 pmClosed
Executive Officer,Belpahar Municipality
At/Po-Belpahar Dist-Jharsuguda Odisha-768218
Construction RCC Drain with Culvert Infront of New Chiken, Fish and Mutton Market ward no-01
2026_ORULB_127308_25
EO/BPHM/07/25-26
Open Tender
Civil Works - Others
Percentage
120 days
Belpahar Municipality
Please refer Tender documents.
3 documents required · 3 mandatory
₹6,000
₹15,000
Yes
29 Jul 2026
18 Mar 2026
31 Mar 2026
18 Mar 2026
30 Mar 2026
18 Mar 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Dismantiling dry or grouted rough stone revetments or aprons or retaining walls and stacking the stones for reuse and removing the debris within 50metres lead. | - | cum | 853.28 | - |
| 2 | Dismantiling and removing cement concrete including stacking the useful materials for reuse and removing the debris within 50 metres lead. | - | cum | 858.58 | - |
| 3 | Earth work excavaton in foundation in hard soil or gravelly soil within 50 m initial lead and 1.5m initial lift including rough dressing and bracking clods to maximum 5 cm to 7 cm and laying in layers to exceeding 0.3 m in depth and as per direction of the department. | - | cum | 276.89 | - |
| 4 | Filling in foundation and plinth with sand watered and rammed as per OPWD specification including all cost of materials, labour, conveyance, royalty, cess, Tools and Plants etc.all complete required for the work to finished items.14 | 1 | cum | 850.43 | ₹849.58 |
| 5 | Cement concrete (1:4:8) with 40 mm size hand broken hard granite metal including all cost of materials, labour, conveyance, royalty, Tools and Plants water for curing etc.all complete,as per OPWD specification required for the work to finished items of work. | 1 | cum | 5,201.38 | ₹5,196.18 |
| 6 | Cement concrete work of M15 grade with 20 mm and down grade crusher broken hard granite chips including hosting and laying all cost of materials, labour, conveyance, royalty, cess, Tools and Plants water for curing etc. all complete, as per OPWD specification required for the work to finished items of work.39 | - | cum | 5,442.82 | - |
| 7 | Cement concrete work of M20 grade with 20 mm and down grade crusher broken hard granite chips including hosting and laying all cost of materials, labour, conveyance, royalty, cess, Tools and Plants water for curing etc. all complete,as per OPWD specification required for the work to finished items of work. 40 | - | cum | 5,871.14 | - |
| 8 | Requirement of HYSD/ MS rod & labour for cutting, bending, binding, straighting and laying the grills and placing in position including cost of rod & binding weir 18 to 20 gauge, cess. | 1 | qntl | 8,875.97 | ₹8,867.09 |
| 9 | Rigid and smooth centering and shuttering for RCC works including false works and dismantling them after casting including cost of materials complete in ground floor (I) RCC foundation, plinth band and footings bases of columns mass concrete pre-cast slabs etc. | - | sqm | 249.21 | - |
| 10 | Rigid and smooth centering and shuttering for RCC works including false works and dismantling them after casting including cost of materials complete in ground floor (II) RCC walls and fins including attached pillasters. | 1 | sqm | 1,081.07 | ₹1,079.99 |
stage.html
html • 0.04 MB
tech_eval.pdf
fin_eval.pdf
finance_585389.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.74 MB
Tendernotice_2.pdf
PDF • 0.80 MB
BOQ_585389.xls
BOQ • 0.32 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .