| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹1.3 CrAdmitted-Finance 4 109 PALLIPATTY VILLAGE PALLIPATTY PO METTUR TK SALEM DISTRICT METTUR 636 458 | METTUR | SALEM | TAMIL NADU | 636458 | ₹1.3 Cr | L1 | Admitted-Finance |
| 2 | L2₹1.3 Cr+₹7.1 L (5.60%)Admitted-Finance 7 145 MALLIKUNDAM PO MECHARI VIA MALLIKUNDAM VIA METTUR TK SALEM DT | ₹1.3 Cr+₹7.1 L (5.60%) | L2 | Admitted-Finance |
| 3 | L3₹1.4 Cr+₹14.9 L (11.8%)Admitted-Finance | ₹1.4 Cr+₹14.9 L (11.8%) | L3 | Admitted-Finance |
| 4 | L4₹1.5 Cr+₹26.0 L (20.6%)Admitted-Finance NO 15A NETHAJI NAGAR 8TH STREET ENNORE HIGH ROAD CHENNAI 600057 | CHENNAI | CHENNAI | TAMIL NADU | 600057 | ₹1.5 Cr+₹26.0 L (20.6%) | L4 | Admitted-Finance |
| 5 | L5₹1.6 Cr+₹33.7 L (26.7%)Admitted-Finance KULLANDI STREET M PALLIPATTI POST METTUR TALUK SALEM DISTRICT 636 458 | METTUR | SALEM | TAMIL NADU | 636458 | ₹1.6 Cr+₹33.7 L (26.7%) | L5 | Admitted-Finance |
Tender Value
Refer Docs
EMD Value
₹1.9 L
Closing Date
3 Sept 2020, 2:00 pmClosed
CE/TP-I/CHN
A10,Guindy Ind Estate ,Chennai
Earth work excavation, stub setting, concreting, transporting and erection, stringing of 2 Nos. ACSR panther conductor and 1 No. OPGW cable for 110 KV SC line on DC towers from Thoppur 110 KV SS to proposed Thoppur Railway Traction 110 KV SS (Loc. 12
2020_EB_176124_1
TP1-020/2020-21
Open Tender
Civil Works
Works
120 days
Guindy
Please refer Tender documents.
2 documents required · 2 mandatory
₹0
₹1.9 L
Yes
12 Sept 2020
19 Aug 2020
4 Sept 2020
19 Aug 2020
3 Sept 2020
19 Aug 2020
Amount
Check surveying and pit marking including hire charges for T&P all labour charges, lead, lift etc., complete.
Clearing light jungle and disposing off to a place away from the site as directed by the Department Engineer at site including cost of all labour, lead, lift, materials T&P's etc., complete.
Supply and Filling of Gravel for formation of approach road in main road to water logging area at tower locations (For 10 Locations)
Earth work excavation for foundation including all labour charges including initial lead, lift, etc., complete.for Hard Gravelly soil SS
Earth work excavation for foundation including all labour charges including initial lead, lift, etc., complete.for SDR NOT REQUIRING BLASTING
Earth work excavation for foundation including all labour charges including initial lead, lift, etc., complete.for MR & DMR NOT Requiring BLASTING
Earth work excavation for foundation including all labour charges including initial lead, lift, etc., complete.for MR & DMR NOT Requiring BLASTING
Earth work excavation for hard rock requiring wedging and chisseling and removing from site including cost of all labour, lead, lift, etc. complete and as directed by the Dept. Engineer at site.
Assempling of templates required alingment and level including cost of all materials, labour, lead, lift etc., complete.as directed by the engineer at site. GCR
Assempling of templates required alingment and level including cost of all materials, labour, lead, lift etc., complete.as directed by the engineer at site. HCR
Assempling of templates required alingment and level including cost of all materials, labour, lead, lift etc., complete.as directed by the engineer at site. KCR
P.C.C 1:3:6 concrete using 20mm HBG metal for tower foundation with outform work but including cost of cement all materials labour, lead, lift etc., complete.as directed by the Engineer at site .
P.C.C 1:2:4, concrete using 12 to 20mm HBG metal for tower foundation and chimney with form work but including cost of cement all materials labour, lead, lift etc., complete.as directed by the Engineer at site.
Back filling of tower pits after laying of stub-setting, concreting with excavated earth, watering and consolidation including all labour etc., complete As directed by the Engineer at site. (Tower works)
Removal of excavated earth from the tower location including cost of all materials, lead, lift, labour and Transporting charges etc., complete.As directed by the Engineer at site.
Providing Pipe type earthing to towers including all materials G.I pipe 3 m length required length of Earth wire and welded with washer at end connecting with Tower leg and all lead, lift etc., complete.As directed by the Engineer at site.
Providing special earthing arrangements for Terminal tower including necessary excavation for fixing 3m long 50mm dia GI "B" class pipe,60cm dia with 5cm shell thick of RCC collar and refilling with excavated earth mixed with soft charcoal and connect the earthstrip including all cost of materials lead lift etc complete.
Providing shoring and shuttering with CW scantling and planks including cost of all materials,labour lead lift etc complete.As directed by the Engineer at site.
De watering charges during excavation and concreting with Diesel engine/ Electrical pump including all charges for fuel, engine oil etc complete. As directed by the Engineer at site. Already sanction Estimate of Molasi 110 Kv line.
Plastering with CM 1:3, 12 mm thick including cost of cement all materials, labour etc., complete.As directed by the Engineer at site.
Labour charges for sorting out, cutting, drilling, and fabrication for KCR tower Square cross arm including cost of labour, lead, lift etc., complete. (scrap angle supplied department )
Erection of towers including sorting out of tower members, tightening punching the bolts and nuts final checking cost of all T&P all lead lifts etc complete.As directed by the Engineer at site.
Supplying, fabrication, labour charges for sorting out, cutting, drilling and fabrication welding, bolting and nutting assembling and erection including alinging in position of DP structures including cost of labour, lead lift, etc. complete and priming coat and painting two coats.
Hoisting of 7units of suspension insulators including cost of transporting from store to site al tools and plants etc complete.As directed by the Engineer at site.
Hoisting of 8units of tension insulators including cost of transporting from store to site al tools and plants etc complete.As directed by the Engineer at site.
Hoisting of 8units of tension insulators with using double tension fittings including cost of transporting from store to site al tools and plants etc complete.As directed by the Engineer at site.
Providing well supported trussels up to 5m height for road crossing including cost of all materials labour lead and lift etc complete.As directed by the Engineer at site.
Providing temporary guy's in tension location including burrying etc complete.As directed by the Engineer at site for 3nos. Stay.
Painting the anti corrssive black paint
Lowering HT/LT Line during stringing of power conductor and after that again restringing the HT/LT line including all labour etc complete.As directed by the Engineer at site.
Run welding of all bolts and nuts upto bottom cross arm level and applying zinc chromate paint in welded portion including cost of all materials lead lift etc complete.As directed by the Engineer at site.
Transporting and stringing of Paying out, jointing, rough sagging,& tensioning of 2 No. ACSR Panther conductors including clipping, providing SB dampers and jumpering in tension points transport of all materials from stores to site & other accessories, labour, leads and lifts etc., complete. In Rail ways LC Condition as a spacial case.(2Wire)
Transporting and stringing of Paying out, jointing, rough sagging,& tensioning of 2 No. ACSR Panther conductors including clipping, providing SB dampers and jumpering in tension points transport of all materials from stores to site & other accessories, labour, leads and lifts etc., complete. In Rail ways LC Condition as a spacial case.(2Wire) (Single span)
Labour charges for stringing of OPGW cable including clipping the cable joints, T & P's, lead, lift etc. continuous span
Labour charges for stringing of OPGW cable including clipping the cable joints, T & P's, lead, lift etc. Single span span
Labour charges providing special type trussels for Railway crossing including hire charges for bomboos, tools & plants etc.complete.
Providing earthing arrangements for Railway Crossing tower including necessary excavation for fixing 3m long 100mm dia CI class pipe, 60cm dia with 5cm shell thick of RCC collar and refilling with excavated earth mixed with soft charcoal and connect with the leg of the stub with 50x10mm MS flat and providing GI barbed wire as per the instruction of site engineer including all cost of materials lead lift etc complete.
Supply and fixing Anti climbing device by providng and tying Barbed wire alround tower with necessary angles etc, lead, lift etc complete as instructed by department engineer at site.
Supplying and Fixing of Number plate.
Supplying and Fixing of Danger board.
Supplying and Fixing of phase plate 1 Set
Cutting and felling of big size Various type of trees
Cutting and felling of small size Various type of trees
Fabrication, supply and fixing in position of the Name Board made of steel sheet 18 Gauge (1.25mm)thick and Letter painting over the board as directed by the Engineer in charge of the work.
GST for bidders within TamilNadu
GST for bidders outside TamilNadu (IGST)
M s Kumaresan and co
M/s.Vetriconstructions
JD ENTERPRISES
C.PERIYASAMY
MSS CONTRACTORS
C.GOVINDAN
K DHINAKARAN
Thulasingam
stage.html
html • 0.04 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .