Loading…
Loading…
Tender Value
₹93.5 L
EMD Value
₹1.9 L
Closing Date
14 Sept 2026, 2:00 pm
Executive Engineer FSC Narbal
Narbal
Strengthening of existing earthen embankment by way of laying of Gabion toe wall on left side of Sukhnag Nallah at RD 27000m to RD 29000m Length 178m
2026_IFC_321751_2
e-Nit No.16 of 2026-27 of FSC Narbal
Open Tender
Civil Works
Percentage
90 days
Narbal
Please refer Tender documents.
2 documents required · 2 mandatory
₹5,000
Executive Engineer FSC Narbal
₹1.9 L
21 Aug 2026
21 Aug 2026
15 Sept 2026
21 Aug 2026
14 Sept 2026
21 Aug 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Clearing jungle including uprooting of rank vegetation, grass, brush wood, trees and saplings of girth upto 30 cm measured at a height of 1 m above ground level and removal of rubbish upto a distance of 50 m outside the periphery of the area cleared. | 270 | sqm | 12.49 | ₹3,372.57 |
| 2 | Earth work in bulk excavation by mechanical means (hydraulic excavator) over areas (exceeding 30 cm in depth, 1.5 m in width as well as 10 m2 on plan) including disposal of excavated earth lead upto 50 meters and lift upto 1.5 m, as directed by Engineer-in-Charge. All kinds of soil : | 1,080 | cum | 187.3 | ₹2,02,284 |
| 3 | Open timbering in trenches including strutting and shoring complete (measurements to be taken of the face area timbered): Depth exceeding 1.5 m but not exceeding 3 m | 360 | sqm | 134.45 | ₹48,402 |
| 4 | Extra rates for quantities of works executed : In or under water and/ or liquid mud, including pumping out water as required. | 540 | cum | 37.46 | ₹20,228.4 |
| 5 | Providing & making Gabion structure with Mechanically Woven Double Twisted Hexagonal Shaped Wire mesh Gabion Boxes as per IS 16014:2012,MORTH Clause 2500, of required size, Mesh Type
10x12(D=100 mm with tolerance of ± 2%) Zinic+PVC coated, Mesh wire diameter2.7/3.7mm, mechanically edged/selvedged with partitions at every 1m interval and shall have minimum 10 numbers of openings per meter of mesh perpendicular to twist, tying with lacing wire of diameter 2.2/3.2mm (ID/OD), supplied @3% by weight of Gabion boxes, filled with quarry stone with least dimension of 200 mm, as per drawing, all complete as per directions of Engineer-in-charge. | 1,780 | cum | 4,401.3 | ₹78,34,314 |
| 6 | Filling available excavated earth (excluding rock) in trenches, plinth, sides of foundations etc. in layers not exceeding 20 cm in depth, consolidating each deposited layer by ramming and watering, lead upto 50 m and lift upto 1.5 m. | 525.6 | cum | 218.4 | ₹1,14,791.04 |
| 7 | Carriage of Material from available Sources to actual site of work by Mechanical Transport including loading, unloading and stacking.
Quarry stone for an Avg. Lead of 40 Kms from Baramulla. | 1,513 | Cum | 741.91 | ₹11,22,509.83 |
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.57 MB
BOQ_1075852.xls
BOQ • 0.23 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at [email protected].