Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹18.9 LAccepted-AOC | L1 | Accepted-AOC Being L1 | |
| 2 | L2₹19.2 L+₹31,900 (1.69%)Rejected-Finance | L2 | Rejected-Finance Not Being Lowest Bidder | |
| 3 | L3₹22.9 L+₹4.0 L (20.9%)Rejected-Finance | L3 | Rejected-Finance Not Being Lowest Bidder | |
| 4 | L4₹25.6 L+₹6.7 L (35.3%)Rejected-Finance | L4 | Rejected-Finance Not Being Lowest Bidder | |
| 5 | L5₹31.6 L+₹12.7 L (66.9%)Rejected-Finance | L5 | Rejected-Finance Not Being Lowest Bidder |
Tender Value
₹44.5 L
EMD Value
₹88,100
Closing Date
23 May 2020, 6:00 pmClosed
GE E/M Lucknow
Garrison Engineer E/M, 36 LBS Marg, Lucknow Cantt, Lucknow (U.P.) PIN 226002
MANNING AND OPERATION OF SERVICES OF MES INSTALLATIONS /PUMP HOUSES (MGSF, NEIL LINE, SANJOG CHHETRI VIHAR, KASTURBA ROAD AND NEW LBS) IN THE AREA OF AGE-E/M (EXT) WATER SUPPLY UNDER GE E/M LUCKNOW.
2020_MES_340971_1
GE/EM/LKO/EXT (WS)/T-04 OF 2020-2021
Open Tender
Miscellaneous Works
Item Rate
335 days
Lucknow
Class D or above category d (v)
8 documents required · 8 mandatory
₹500
GE E/M Lucknow
₹88,100
Yes
10 Jul 2020
25 Apr 2020
25 May 2020
25 Apr 2020
23 May 2020
9 May 2020
Amount
Providing services for uninterrupted operation of pumping set installation with submersible / monoblock / centrifugal pump set, DG set (any capacity and type ) pleaching powder dozer and chloronome plant of any capacity and type situated at following locations by employing one number of FGMoperator (skilled), qualified as per Particular Specification in each shift of 8(eight) hrs (for duration of 24 hrs ie in 3 shifts ) per installation,complete all as specified and directed by Engineer- in- Charge . (a) MGSF PUMP HOUSE (b) NEIL LINE PUMP HOUSE (c) SANJOG CHHETRI VIHAR PUMP HOUSE (d) KASTURBA ROAD PUMP HOUSE (e) NEW LBS PUMP HOUSE
NOTE : Rates quoted by the contractor shall be inclusive for following item :- (a) Contractor has to provide grease & gasket ,consumable materials such as soap, cotton, waste, protective clothing , gloves and other instruments etc as required for maintenance, manning & operation of water supply installation from his own sources and cost of the same shall be included in the unit rate. No extra ammount shall be paid separately on this account. (b) The installations will be handed over in operating state from the date of commencement as per work order. (c) The contractor shall be responsible for making good damages occured due to inadequate exprience of staff employed by him and/or negligence of his workmen. (d) The list of plant and equipments installation for operation are as under [ (i) submersible pump set (ii) centrifugal pump set (iii) LT control panel (iv) chemical dozing pump set (v) DG set . (e) The chemicals required for treatment / disinfection of water will be provided by the department water treatment /disinfection shall be done timely and quality of water will be ckecked as per IS specification before supplying to users. Penalty will be imposed to contractor in absense of chemical dozing.
Notes contd/---:- (f) If any slackness noticed a suitable action shall be initiated as per the existing rule and contract is liable to be terminated . (g) The operator should have knowledge of safety precautions and first aid. (h) The record of hours run & consumption detail of POL in DG set is to be strictly maintaind. If any abnormalty is noticed a suitable action shall be initiated as per existing rules and contracts is liable to be terminated . (j) Contractor shall provided two set of uniform, Shoe with Name Plate , Mobile connection , Etc (k) The log sheets will be maintained by the contractor in each installations.Contractor shall provided Log book, Attendence Register,Plant running record book and rate quoted by the contractor shall deemed to included in his quoted rates . (l) The contractor will be responsible for upkeep of the installations in neat and tidy conditions and in a presentable manner. The surrounding of the installation will also be maintained neat and clean by removing grasses and other vegetation. (m) The site documents such as Log Sheet, Attendance etc will be checked daily by JE, weekly by Engineer-in-Charge and monthly by GE. (n) All plant and machinery equipment and other items belonging to plant including safety shall be responsibility of manpower employed by the contractor.
Sanjai sales and services
M/S Hind Constructions
Ajanta Associates
SB Singh and co.
M/S MAISUR CONSTRUCTION COMPANY PRIVATE LIMITED
stage.html
html • 0.06 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .