Loading…
Loading…
| # | Company | Status |
|---|---|---|
| 1 | Accepted-Technical | Accepted-Technical Accepted for Financial Evaluation |
| 2 | Accepted-Technical | Accepted-Technical Accepted for Financial Evaluation |
| 3 | Not Admitted-Fee/PreQual/Technical | Not Admitted-Fee/PreQual/Technical Not Complied with technical specification |
| 4 | Not Admitted-Fee/PreQual/Technical | Not Admitted-Fee/PreQual/Technical Not Complied with technical specification |
| 5 | Not Admitted-Fee/PreQual/Technical | Not Admitted-Fee/PreQual/Technical Not Complied with technical specification |
Tender Value
₹17.6 L
EMD Value
₹1.8 L
Closing Date
30 Dec 2025, 5:00 pmClosed
District Urban Development Agency, Amethi
Office of the District Urban Development Agency, Amethi
Construction of Interlocking Road in Ward no. 11 Nagar Palika Gauriganj Bhalchanra ke Ghar se Yogendra ke Ghar Tak
2025_SUDA_1099144_12
831/Duda/Nivida/2025-26 Date 12-12-2025
Open Tender
Civil Works - Roads
Fixed-rate
90 days
AMETHI
Please refer Tender documents.
2 documents required · 2 mandatory
₹944
Yes
Project Director Duda
₹1.8 L
Yes
11 Feb 2026
16 Dec 2025
31 Dec 2025
16 Dec 2025
30 Dec 2025
16 Dec 2025
Excavation in foundation in ordinary soil, loame, clay or sand including lift upto 1.50 in & lead upto 30 m Including filling watering & ramming of excavated earth into the trenches or upto the space between the building & the sides of foundation trenches or in to the plinth removal & disposal of surplus earth as directed by the engineer in charge upto a distance of 30 m from the foundation trenches. SOR 2.6.1
Construction of Granular sub base by providing well graded material spreading in uniform layers with motor grader on prepared surface, mixing by mix in place method with rotavator at OMC, and complacting with smooth wheel roller to achieved the desired density. complete as per clause 401.
Providing laying spreading and compacting stone aggregates of specific sizes to water bound macadam specification including spreading in uniform thickness, hand packing rolling with 3-wheeled steel/vibratory roller 8-10 tonnes in stages to proper grade and camber, applying and brooming requisite type of screening/binding materials to fill-up the interstices of coarse aggregate, watering and compacting to the required density.
P/L of 80 mm thick Rubber Moulded Zig zag Refelective Interlocking Tiles with Sand Filling incluiding supply of all materials labour T & P etc all Complete
Brick work with common burnt clay (non modular) bricks of class-150 in foundation and plinth in:
Plastering with Neet Finish
Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level1:4:8 (1 Cement : 4 coarse sand (zone-III) : 8 graded stone aggregate 40 mm (nominal size)
Supplying, fitting and placing HYSD bar reinforcement (Fe 415) in substructrue complete as per drawings and technical specification Clauses 1002, 1005, 1010 & 1202
Providing and laying cement concrete in retaining walls, return walls, walls (anythickness) including attached pilasters, columns, piers, abutments, pillars, posts, struts, buttresses, string or lacing courses, parapets, coping, bed blocks, anchor blocks, plain window sills, fillets, sunken floor etc., up to floor five level, excluding the cost of centering, shuttering and finishing:
Supply & Fixing of Information Board ,Videography ,Photography,at Site incluiding all labour material T & P ……………EUC
stage.html
html • 0.04 MB
tech_bid_open.pdf
tech_eval.pdf
cancelled_1.pdf
pdf • 0.05 MB
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 2.17 MB
BOQ_2024820.xls
BOQ • 0.28 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .