Loading…
Loading…
| # | Company | Quoted % | Amount | Rank | Status |
|---|---|---|---|---|---|
| 1 | L1₹1.8 LAdmitted-Fee/PreQual/Technical/Finance | L1 | Admitted-Fee/PreQual/Technical/Finance | ||
| 2 | L2₹1.9 L+₹10,445.05 (5.93%)Admitted-Fee/PreQual/Technical/Finance | L2 | Admitted-Fee/PreQual/Technical/Finance |
Tender Value
₹2.1 L
EMD Value
₹4,260
Closing Date
9 Oct 2026, 4:00 pmClosed
Executive Engineer
Irrigation Division Shopian
Construction of Lining wall on left side of Noori Khul near the house of Ab. Majid Sheikh at Ayesha Mohallah Bongam
2026_IFC_326899_1
Short term e-Nit 28 of 2026-27
Open Tender
Civil Works
Percentage
10 days
Shopian
Please refer Tender documents.
2 documents required · 2 mandatory
₹150
Executive Engineer
₹4,260
12 Oct 2026
3 Oct 2026
10 Oct 2026
3 Oct 2026
9 Oct 2026
3 Oct 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Earth work in bulk excavation by manual means over areas (exceeding 30 cm in depth, 1.5 m in width as well as 10 m2 on plan) including disposal of excavated earth lead upto 50 meters and lift upto 1.5 m, as directed by Engineer-in-Charge.All kinds of soil : | 24.97 | Cum | 592.9 | ₹14,804.71 |
| 2 | Dumping stone excluding cost of stones. in Horizontal on level | 1.85 | Cum | 237.9 | ₹440.12 |
| 3 | Supply of Stone boulder nominal size 225 mm | 1.85 | Cum | 700 | ₹1,295 |
| 4 | Providing and laying in position cement concrete of specified grade including curing but excluding the cost of centring and shuttering. All work upto plinth level with:
1:2:4 (1 cement : 2 coarse sand : 4 graded stone aggregate 20 mm nominal size) | 21.78 | cum | 6,591.25 | ₹1,43,557.43 |
| 5 | Centering and shuttering including strutting, propping etc. and removal of form work for:
Foundations, footings, bases for columns | 96.8 | Sqm | 286.35 | ₹27,718.68 |
| 6 | Carriage of materials from source to road site by mechanical transport including loading, unloading and stacking.
Stone boulder for 13 Kms avg. | 1.85 | Cum | 374.23 | ₹692.33 |
| 6.01 | 20 mm agg. From 25 kms avg | 19.38 | Cum | 465.14 | ₹9,014.41 |
| 6.02 | Sand from Kakapora avg. lead of 30 Kms | 9.8 | Cum | 520.34 | ₹5,099.33 |
| 6.03 | Cement from 10 kms avg. | 6.97 | MT | 248.03 | ₹1,728.77 |
| 7 | Extra Carriage of the materails from road site to the actual site of the work by head load 50 M.
Boulder | 1.85 | Cum | 236.08 | ₹436.75 |
stage.html
html • 0.02 MB
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.53 MB
BOQ_1105864.xls
BOQ • 0.27 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .