Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹1.5 CrAccepted-Finance ASSOLNA SOUTH GOA | SOUTH GOA | GOA | 403802 | ₹1.5 Cr | L1 | Accepted-Finance Financial Sucessful Bidder |
| 2 | L2₹1.5 CrRejected-Finance BG 2 ADWALPALKAR VALLEY DARSHAN BELLA VIST SANGOLDA BARDEZ GOA | ₹1.5 Cr | L2 | Rejected-Finance Financial Un Sucessful Bidder |
Tender Value
₹1.4 Cr
EMD Value
₹2.9 L
Closing Date
2 Mar 2026, 3:00 pmClosed
Executive Director
O/o Executive Director, SAG,1st Floor, Atal Stadium Cujira St. Cruz Goa
Urgent Repair and Renovation work of Administrative Block of Directorate of Sports and Youth Affairs
2026_TSAG_27863_1
SAG/EE-ED/TECH/F08/25-26/4707
Open Tender
Miscellaneous Works
Percentage
180 days
Urgent Repair and Renovation work of Administrativ
Please refer Tender documents.
7 documents required · 7 mandatory
₹10,000
₹2.9 L
24 Mar 2026
19 Feb 2026
4 Mar 2026
19 Feb 2026
2 Mar 2026
19 Feb 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Earthwork in excavation in all type of strata Earthwork in excavation by mechanical means (hydraulic excavator)/manual means in foundation pipeline trenches drain (not exceeding 1.5 m in width or 10 sq.m. on plan) including dressing of sides and ramming of bottoms, lift upto 1.5 m including getting out the excavated soil and disposal of surplus excavated soil as directed within a lead of 50 m. a)All kinds of soil | 38 | Cum | 291 | ₹11,058 |
| 2 | Rubble packing with hard laterite stone under floors including watering ramming and consolidating etc. in pipeline trenches and other foundations complete. | 23.2 | Cum | 2,211 | ₹51,295.2 |
| 3 | Providing & laying cement concrete 1:2:4 (1 cement: 2 coarse sand: 4 graded granitic or basaltic stone aggrt. 20 mm. nominal size) excluding cost of centering, shuttering and finishing in: (a)All works upto plinth level | 18 | Cum | 6,810 | ₹1,22,580 |
| 4 | Dismantling old plaster or skirting raking out joints and cleaning the surface for plaster including disposal of rubbish to the dumping ground within 50 mts. lead. | 101 | Sqm | 27 | ₹2,727 |
| 5 | Dismantling doors, windows and clearestory windows (steel or wood) shutters including chowkhats architrave holdfast etc. complete and staking within 50 mt. Lead a)Of area 3 sq.m. and below | 15 | Each | 206 | ₹3,090 |
| 6 | Dismantling the tile work in floors and roofs laid in cement including stacking of materials within 50 meters lead for thickness of tiles 10mm to 25mm | 425 | Sqm | 330 | ₹1,40,250 |
| 7 | 18mm cement plaster in two coats under layer 12mm thick cement plaster 1:5 ( 1 cement : 5 coarse sand) and top layer 6mm thick with cement plaster 1: 3 (1 cement : 3 coarse sand) finished with sponge. | 610 | Sqm | 329 | ₹2,00,690 |
| 8 | 6mm cement plaster to ceiling 1: 4 (1 cement : 4 fine sand) | 183 | Sqm | 172 | ₹31,476 |
| 9 | 12mm cement plaster 1:4 (1 cement : 4 fine sand) | 677 | Sqm | 223 | ₹1,50,971 |
| 10 | Half brick masonry in cement mortar 1:3 (1 cement : 3 coarse sand) with bricks of class designation 75 kg /cm2. (b)Upto floor V level. | 16 | Sqm | 1,198 | ₹19,168 |
stage.html
html • 0.04 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 1.33 MB
Tendernotice_2.pdf
PDF • 3.00 MB
BOQ_28313.xls
BOQ • 0.46 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at [email protected].