| Sl No | Description | Qty | Unit | ARAVIND MUGESH L2 | SHREE BUILDERS L1 |
|---|---|---|---|---|---|
| 1.00Construction of Kalaiarangam at Thirkoodapathy Village in Kulaiyaneri Panchayat in Kadayanallur Panchayat Union, Tenkasi District under MLACDS 2025 - 2026 | |||||
| 2.00 | Earth work excavation in all clauses of soils with initial lead and lift except hard rock requiring blasting etc., complete for foundation as per SS 20B for foundation | 12.11 | cum | 264 ₹3,197.04 | 263 ₹3,184.93 Lowest |
| 3.00 | Cement concrete 1:4:8 mix using 40m ISS size HBG metal including all cost and conveyance and all labour charges etc., complete. | 6.38 | cum | 5,528 ₹35,268.64 | 5,527 ₹35,262.26 Lowest |
| 4.00 | Brick work in cm 1:5 mix using country bricks including all cost and conveyance and all labour charges etc., complete. | 21.58 | cum | 6,160 ₹1,32,932.8 | 6,159 ₹1,32,911.22 Lowest |
| 5.00 | Filling with Excavated Earth including watering & Ramming etc., complete. | 15.21 | cum | 46 ₹699.66 | 45.5 ₹692.06 Lowest |
| 6.00 | Centering charges for all concrete works including all cost and conveyance and all labour charges etc., complete. | 64.34 | sqm | 1,096 ₹70,516.64 | 1,095 ₹70,452.3 Lowest |
| 7.00 | Supplying and fabrication of steel including all cost and conveyance and all labour charges for cutting, bending, tieing and placeing in position etc., complete. | 9.82 | Qtl | 9,187 ₹90,216.34 | 9,186 ₹90,206.52 Lowest |
| 8.00 | RCC in cm1:1.5:3 mix using 20mm ISS size HBG metal including all cost and conveyance and all labour charges etc., complete. | 8.58 | cum | 9,303 ₹79,819.74 | 9,302 ₹79,811.16 Lowest |
| 9.00 | Supplying and applying of two coats of putty of 3mm thick over the exposed RCC surface of ceiling including finishing the joints smoothy with grinding machine and the surface shall be thoroughly cleaned out of dust and scrubbing. The Surface shall then be allowed to dry for atleast 48 hours. It shall then be sand papered (waterproof abrasive sheet) to give a smooth and even surface. Any unevenness shall be made good by applying 1st coat of putty mixed with water on the entire surface including filling up the undulations and applying 2nd coat of putty after 6 hours of 1st coat of putty and then sand papering (waterproof abrasive sheet) the same after it is dry and finishing the surface smoothly, etc., complete. | 32.44 | sqm | 310 ₹10,056.4 | 309 ₹10,023.96 Lowest |
| 10.00 | Plastering with CM 1:5 mix 12mm thick including cost and conveyance of all materials etc., complete. | 142.71 | sqm | 288 ₹41,100.48 | 287 ₹40,957.77 Lowest |
Tender Value
₹6.5 L
EMD Value
₹16,250
Closing Date
2 Sept 2025, 4:00 pmClosed
BDO
BDO,Kadayanallur
Construction of Kalaiarangam at Thirkoodapathy Village in Kulaiyaneri Panchayat in Kadayanallur Panchayat Union, Tenkasi District under MLACDS 2025 - 2026
2025_RDTN_597894_1
BDOKNR/208/2024-A3
Open Tender
Civil Works - Buildings
Item Rate
180 days
Kadayanallur
Please refer Tender documents.
2 documents required · 2 mandatory
₹0
₹16,250
27 Sept 2025
27 Aug 2025
2 Sept 2025
27 Aug 2025
2 Sept 2025
27 Aug 2025
Amount
Construction of Kalaiarangam at Thirkoodapathy Village in Kulaiyaneri Panchayat in Kadayanallur Panchayat Union, Tenkasi District under MLACDS 2025 - 2026
Earth work excavation in all clauses of soils with initial lead and lift except hard rock requiring blasting etc., complete for foundation as per SS 20B for foundation
Cement concrete 1:4:8 mix using 40m ISS size HBG metal including all cost and conveyance and all labour charges etc., complete.
Brick work in cm 1:5 mix using country bricks including all cost and conveyance and all labour charges etc., complete.
Filling with Excavated Earth including watering & Ramming etc., complete.
Centering charges for all concrete works including all cost and conveyance and all labour charges etc., complete.
Supplying and fabrication of steel including all cost and conveyance and all labour charges for cutting, bending, tieing and placeing in position etc., complete.
RCC in cm1:1.5:3 mix using 20mm ISS size HBG metal including all cost and conveyance and all labour charges etc., complete.
Supplying and applying of two coats of putty of 3mm thick over the exposed RCC surface of ceiling including finishing the joints smoothy with grinding machine and the surface shall be thoroughly cleaned out of dust and scrubbing. The Surface shall then be allowed to dry for atleast 48 hours. It shall then be sand papered (waterproof abrasive sheet) to give a smooth and even surface. Any unevenness shall be made good by applying 1st coat of putty mixed with water on the entire surface including filling up the undulations and applying 2nd coat of putty after 6 hours of 1st coat of putty and then sand papering (waterproof abrasive sheet) the same after it is dry and finishing the surface smoothly, etc., complete.
Plastering with CM 1:5 mix 12mm thick including cost and conveyance of all materials etc., complete.
Providing granolethic floor finish in cement concrete 1:2:4 mix using 10-12mm ISS metal to 25mm thick including all cost and conveyance and all labour charges etc., complete.
Weathering course with brick jelly lime concrete using 20mm brick jelly with pure slacked lime over R.C.C. roof slab in the proportion of 32:12.5 and finshed with Cement mortor 1:4 -20mm thick plastering including cost and conveyance of all materials to site and all labour charges etc complete for 10 Sqm.
Finishing the top of roof with one course of machine pressed tiles of size 23cm X 23cm X 2 cm laid in cement mortar 1:3 (One cement and three sand) 12mm thick mixed with water proofing compound and top pointing with same oiled mortar including all cost and conveyance of all materials and labour charges etc. complete
Exterior Emulsion using best quality and approved cement paint over one coat of cement paint primer including all cost and conveyance of materials, labour charges etc., complete.
GST Amount for providing Service to Government Contract Works for the above Construction Works. { GST Amount is the Total GST Amount for total overall quoted amount above this row in column "BB" for all works in this package}
ARAVIND MUGESH (BID ID -1446268)
stage.html
html • 0.03 MB
tech_eval.pdf
fin_eval.pdf
finance_714609.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .