Closing Date
27 Jul 2026, 1:00 pmClosed
Vdo And PRASASHAK
GRAM PANCHAYAT JYAK
SARVJANIK SMASHAN BHUMI KI TINSHED NIRMAAN KARY JYAK
2026_PRD_576331_1
GPJYAK/2026-27/91-95
Open Tender
Civil Works
Percentage
GRAM PANCHAYAT JYAK
Please refer Tender documents.
2 documents required · 2 mandatory
₹500
GRAM PANCHAYAT JYAK
₹20,000
Yes
31 Jul 2026
21 Jul 2026
28 Jul 2026
21 Jul 2026
27 Jul 2026
21 Jul 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | 15 cm. To cover the ground surface by cutting the average soil and removing vegetation and small plants and lifting of raw material and shrubs for 1.5 meters and putting them up to a distance of 50 meters. | 450 | वर्ग मीटर | 7.81 | ₹3,514.5 |
| 2 | JCB machine/tractor-type scraper, breaking of clods, mower and pebbles, sorting of grass and pebbles and maintaining the section/profile of bund. And lift 3 m. up to. Draft based on chapter 5th of irrigation page number 32 to 34 (valid from date 01/02/2017) unit 1 cubic meter. | 720 | वर्ग मीटर | 52.53 | ₹37,821.6 |
| 3 | Digging soil up to 1.5 depths in the foundation, ditch, barn, crushing the bottom, pouring water, grooming the armpits, removing the carved soil, refilling the empty places with soil after filling the foundation and removing the remaining soil for a distance of 50 meters. | 5.83 | वर्ग मीटर | 178.46 | ₹1,040.42 |
| 4 | Cement concrete foundation or floor 40 mm. The stone of the renowned measure is to be poured into the limestone ballast /brick soil, cement-sand masala in the ratio of 1 cement : 4 sand : 8 ballast and cutting, including lowland. | 0.73 | घन मीटर | 3,514.97 | ₹2,565.93 |
| 5 | Cement Concrete 1:1.5:3 Pouring and supplying the mixture into the reinforced cement concrete, pressing in roof slabs, balconies, beams, lintles, etc., etc., but the cost of steel and shuttering, including restrictions, etc., and leveling the surface with 1:3 cement spices, etc. | 3.24 | घन मीटर | 5,761.62 | ₹18,667.65 |
| 6 | The work of cutting, folding and placing and tying iron for RCC work is done to supply. | 287.35 | KG | 92.78 | ₹26,660.33 |
| 7 | The function of iron in the grill/gate etc., including cutting, plating and applying flat corneas, t and chainls etc. BSR Item 63 | 2,720.09 | KG | 101.68 | ₹2,76,578.75 |
| 8 | Installation and supply of green or yellow lit roof expo corrugated sheets (anti-corrosion, sealing and weather proof and lamp resistant). Analysis 3.5 X for 4.5 = 15.75 m2 | 78.75 | वर्ग मीटर | 596.16 | ₹46,947.6 |
| 9 | Shuttring and crane charges Lumpsump | 1 | LMSP | 5,000 | ₹5,000 |
| 10 | Digging soil up to 1.5 depths in the foundation, ditch, barn, crushing the bottom, pouring water, grooming the armpits, removing the carved soil, refilling the empty places with soil after filling the foundation and removing the remaining soil for a distance of 50 meters. | 8.59 | घन मीटर | 178.46 | ₹1,532.97 |
stage.html
html • 0.02 MB
tech_bid_open.pdf
tech_eval.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.79 MB
jyak01.pdf
Tender Documents • 5.79 MB
BOQ_1024639.xls
BOQ • 0.28 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .