| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹29.0 LAccepted-Finance 14 15 VINAY NAGAR VIJITEM PUBLIC SCHOOL QUARSI RAMGHAT ROAD ALIGARH | ALIGARH | ALIGARH | UTTAR PRADESH | L1 | Accepted-Finance L1 | |
| 2 | L2₹32.2 L+₹3.2 L (11.1%)Accepted-Finance | L2 | Accepted-Finance L2 | |
| 3 | Rejected-Technical | - | Rejected-Technical Document Incomplete | |
| 4 | Rejected-Technical | - | Rejected-Technical Document Incomplete | |
| 5 | Rejected-Technical | - | Rejected-Technical Document Incomplete |
| Sl No | Description | Qty | Unit | GOMATINETRA CONSTRUCTIONS L1 | CHANDRA BHAN SINGH L2 |
|---|---|---|---|---|---|
| 0.00The quantities given here under are tentative. They can vary on either side upto any extant,the contractor shall have no claim on account of changes and shall be paid of the quantities as physically met at site reach of work for complete work. | |||||
| 1.00 | E/W excation in foundation on M.K.R. soil including initial lead and lift for proper completion of work etc. | 1,278.9 | Cum | 107.56 ₹1,37,558.48 Lowest | 119 ₹1,52,189.1 |
| 2.00 | Supplying & laying sand in inverted filter including cost of material, labour, T&P etc. with all leads & lifts for proper completion of Job. | 231.1 | Cum | 1,657.35 ₹3,83,013.59 Lowest | 1,841 ₹4,25,455.1 |
| 3.00 | Laying C.C. (1:3:6) M10 A40 in foundation with all cost of sand cement and stone, balllast T&P etc. reguard for completion of work. | 87.6 | Cum | 3,814.26 ₹3,34,129.18 Lowest | 4,237 ₹3,71,161.2 |
| 4.00 | R.C.R. stone masonry 1:4 cm with all cost of labour cement, sand, stone T&P etc. required for completion of work. | 210.24 | Cum | 4,341.45 ₹9,12,746.45 Lowest | 4,823 ₹10,13,987.52 |
| 5.00 | Dry stone pitching all cost of labour material T&P etc. required for completion of work. | 287 | Cum | 2,364.11 ₹6,78,499.57 Lowest | 2,626 ₹7,53,662 |
| 6.00 | Laying C.C. work 1:2:4 with cement course sand and stone grit 10 to 20 mm including all cost of material, labour, T&P and proper completion of work.But excluding GST. | 26.28 | Cum | 4,582.22 ₹1,20,420.74 Lowest | 5,092 ₹1,33,817.76 |
| 7.00 | Supplying and laying filter material 20 mm gauge including cost of material, labour, t&p etc. with all leads & lifts for proper completion of job | 158.55 | Cum | 1,851.17 ₹2,93,503 Lowest | 2,056 ₹3,25,978.8 |
| 8.00 | E/W in back filling in all type of soil including initial lead and lift as per proper completion of work. | 767.34 | Cum | 48.69 ₹37,361.78 Lowest | 54 ₹41,436.36 |
Tender Value
₹32.2 L
EMD Value
₹64,400
Closing Date
25 Aug 2026, 12:00 pmClosed
EXECUTIVE ENGINEER
OFFICE OF THE EE ICD KARWI CHITRAKOOT
Dry stone pitching of khandeh Dy at km 10.700, 13.00, 13.870 and 17.477 (Lot-01)
2026_UPIDC_1175409_1
02/EE/2026-27
Open Tender
Civil Works - Canal
Item Rate
180 days
Distt Mahoba
AS PER NIT
2 documents required · 2 mandatory
₹854
₹64,400
17 Oct 2026
10 Aug 2026
25 Aug 2026
10 Aug 2026
25 Aug 2026
10 Aug 2026
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 0 | The quantities given here under are tentative. They can vary on either side upto any extant,the contractor shall have no claim on account of changes and shall be paid of the quantities as physically met at site reach of work for complete work. | - | - | - | - |
| 1 | E/W excation in foundation on M.K.R. soil including initial lead and lift for proper completion of work etc. | 1,278.9 | Cum | 119.5 | ₹1,52,828.55 |
| 2 | Supplying & laying sand in inverted filter including cost of material, labour, T&P etc. with all leads & lifts for proper completion of Job. | 231.1 | Cum | 1,841.29 | ₹4,25,522.12 |
| 3 | Laying C.C. (1:3:6) M10 A40 in foundation with all cost of sand cement and stone, balllast T&P etc. reguard for completion of work. | 87.6 | Cum | 4,237.22 | ₹3,71,180.47 |
| 4 | R.C.R. stone masonry 1:4 cm with all cost of labour cement, sand, stone T&P etc. required for completion of work. | 210.24 | Cum | 4,823.3 | ₹10,14,050.59 |
| 5 | Dry stone pitching all cost of labour material T&P etc. required for completion of work. | 287 | Cum | 2,626.5 | ₹7,53,805.5 |
| 6 | Laying C.C. work 1:2:4 with cement course sand and stone grit 10 to 20 mm including all cost of material, labour, T&P and proper completion of work.But excluding GST. | 26.28 | Cum | 5,092.64 | ₹1,33,834.58 |
| 7 | Supplying and laying filter material 20 mm gauge including cost of material, labour, t&p etc. with all leads & lifts for proper completion of job | 158.55 | Cum | 2,056.63 | ₹3,26,078.69 |
| 8 | E/W in back filling in all type of soil including initial lead and lift as per proper completion of work. | 767.34 | Cum | 54.1 | ₹41,513.09 |
stage.html
html • 0.04 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 3.61 MB
BOQ_2208869.xls
BOQ • 0.35 MB
NIT02.pdf
Tender Documents • 3.60 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .